← Back
Office with commercial, 7-19 stories
235 WEST 23 STREET
MANHATTAN · Chelsea-Hudson Yards · BIN 1014147
💬 Discuss this project
1906Year Built
8Stories
O6Building Class
C2-7AZoning
49,183 sfGross Floor Area
12Units
LL97 Covered12 Open Violations 4 unresolved · 8 paperwork only ▸FISP: SAFE
Office with commercial, 7-19 stories · Owner of record: ADVANCE REALITY CORP. · 5,925 sf lot · 8.3 FAR built · Flood zone X
Locations of Work
Fire Protection
Roof1p · 1 filing · 8 docs
Floor 81p · 1 filing · 8 docs
Floor 7
Floor 61p · 1 filing · 8 docs
Floor 51p · 1 filing · 8 docs
Floor 4
Floor 31p · 1 filing · 8 docs
Floor 2
Floor 12p · 1 filing · 8 docs
Cellar1p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ADVANCE REALITY CORP.14807/08/2026
SDVSNCED REALTY103/22/2026
ROCK GROUP NY CORP.103/21/2026
WIX203/21/2026
ADVANCE REALTY GROUP103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RIGID STRUCTURAL DESIGN, LLC106/25/2026
EDWARD C. HICKS RA206/27/2024
WAVIC ENGINEERING PLLC205/21/2024
ALFRED KARMAN, ARCHITECT103/04/2024
ASHRAF CORP212/07/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KATARIA403/21/2026
HS DESIGN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ANDAMIO SCAFFOLDING LLCGeneral Contractor303/21/2026
DERRICK RAMDEENElectrical103/21/2026
P & D MECHANICAL CORPFire Protection107/08/2026
REPUBLIC SCAFFOLD&HOIST CGeneral Contractor106/27/2026
TERRA NOVA RESTORATION COGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
VIBRANALYSIS INC., DBA VT6864105/21/2024
WAVIC ENGINEERING PLLC1733111/04/2023
Building Lifecycle
All (12)Special Inspection (12)
05/23/2024
Special inspection requirement — Energy Code Compliance Inspections
05/23/2024
Special inspection requirement — Final
05/23/2024
Special inspection requirement — Interior lighting power
05/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
DARIUSZ LUCZAK
05/21/2024
Special inspection requirement — Seismic Isolation Systems
DARIUSZ LUCZAK
05/21/2024
Special inspection requirement — Sprinkler Systems
DARIUSZ LUCZAK
05/21/2024
Special inspection requirement — Post-installed Anchors
DARIUSZ LUCZAK
05/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JUAN GOMEZ
05/20/2024
Special inspection requirement — Post-installed Anchors
JUAN GOMEZ
05/20/2024
Special inspection requirement — Seismic Isolation Systems
JUAN GOMEZ
05/20/2024
Special inspection requirement — Sprinkler Systems
JUAN GOMEZ
12/20/2023
Special inspection requirement — Final
Alfred Karman
Nothing on file for this building.
Nothing on file for this building.
Nothing on file for this building.
Nothing on file for this building.