← Back
Elevator apt, semi-fireproof with stores
2348 WEBSTER AVENUE
BRONX · BIN 2115299
💬 Discuss this project
2005Year Built
8Stories
D7Building Class
R7-1Zoning
70,808 sfGross Floor Area
64Units
LL97 CoveredRent Stabilized180 Open Violations ▸FISP: No Report Filed
Elevator apt, semi-fireproof with stores · Owner of record: JACOBS PLACE HOUSING DEVELOPMENT FUND CO RPORATION · 17,366 sf lot · 4.08 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 11p · 1 filing · 2 docs
Cellar4p · 2 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HKS CONSTRUCTION604/09/2026
JACOBS PLACE HOUSING DEVELOPMENT FUND CO RPORATION2603/22/2026
JACOBS PLACE HOUSING DVLP203/22/2026
FORDHAM BEDFOED HOUSING303/22/2026
JACOBS PLACE HOUSING103/22/2026
ROSE CONTRACTOR NY403/22/2026
GALAXY GEN'L CONSTR CORP103/22/2026
JACOBS PLACE HDFC603/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW AGE ENGINEERING PLLC204/28/2025
HAIDER ENGINEERING, P.E.110/30/2017
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HAIDER ENGINEERING, P.E.103/21/2026
HAIDER ENGINEERING P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ACCURATE MECH INDSTRS INCPlumbing507/08/2026
HKS CONSTRUCTION CORPGeneral Contractor204/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW AGE ENGINEERING PLLC7746204/28/2025
Building Lifecycle
All (86)Filed (3)Permit Issued (4)Signed Off (3)Facade (FISP) (3)Violation (60)Inspection (5)Special Inspection (8)
08/10/2026
Violation issued (ECB, open)
Elevators
07/25/2026
Violation issued (HPD, open)
A
07/25/2026
Violation issued (HPD, open)
B
07/02/2026
Violation issued (ECB, open)
Construction
05/06/2026
Violation issued (HPD, open)
C
05/06/2026
Violation issued (HPD, closed)
B
05/06/2026
Violation issued (HPD, closed)
C
05/06/2026
Violation issued (HPD, open)
B
05/06/2026
Violation issued (HPD, open)
B
05/06/2026
Violation issued (HPD, open)
B
05/06/2026
Violation issued (HPD, closed)
A
05/06/2026
Violation issued (HPD, open)
C
11/12/2025
Signed off — Alteration
CONNECT REPLACEMENT GAS-FIRED BOILERS TO EXISTING GAS PIPING.NO CHANGE IN USE,OCCUPANCY OR EGRESS.
X01214890-S1
10/23/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/22/2025
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X00001507-I1
10/20/2025
Violation issued (HPD, closed)
C
10/20/2025
Violation issued (HPD, open)
B
10/20/2025
Violation issued (HPD, open)
B
10/20/2025
Violation issued (HPD, closed)
A
10/20/2025
Violation issued (HPD, closed)
C
10/20/2025
Violation issued (HPD, open)
B
10/20/2025
Violation issued (HPD, open)
A
10/20/2025
Violation issued (HPD, open)
C
10/20/2025
Violation issued (HPD, open)
B
10/20/2025
Violation issued (HPD, open)
B
10/20/2025
Violation issued (HPD, open)
B
10/20/2025
Violation issued (HPD, open)
B
10/20/2025
Violation issued (HPD, open)
B
10/17/2025
Signed off — Alteration
CONNECT REPLACEMENT GAS-FIRED BOILERS TO EXISTING GAS PIPING.NO CHANGE IN USE,OCCUPANCY OR EGRESS.
X01214890-I1
10/10/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/30/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/30/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
09/25/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/03/2025
Violation issued (HPD, closed)
B
09/03/2025
Violation issued (HPD, open)
B
09/03/2025
Violation issued (HPD, open)
B
09/03/2025
Violation issued (HPD, open)
B
09/03/2025
Violation issued (HPD, open)
B
09/03/2025
Violation issued (HPD, open)
B
08/27/2025
Violation issued (HPD, open)
C
08/19/2025
Violation issued (ECB, open)
Construction
05/08/2025
Violation issued (ECB, open)
Local Law
05/02/2025
Permit issued — Plumbing
X01214890-S1-PL
05/01/2025
Permit issued — Boiler Equipment
X01214890-I1-BE
04/30/2025
Violation issued (HPD, open)
C
04/30/2025
Violation issued (HPD, open)
B
04/30/2025
Violation issued (HPD, open)
B
04/30/2025
Violation issued (HPD, closed)
C
04/30/2025
Violation issued (HPD, open)
B
04/30/2025
Violation issued (HPD, open)
B
04/30/2025
Violation issued (HPD, closed)
B
04/28/2025
Filed — Alteration
CONNECT REPLACEMENT GAS-FIRED BOILERS TO EXISTING GAS PIPING.NO CHANGE IN USE,OCCUPANCY OR EGRESS.
X01214890-S1
04/28/2025
Filed — Alteration
CONNECT REPLACEMENT GAS-FIRED BOILERS TO EXISTING GAS PIPING.NO CHANGE IN USE,OCCUPANCY OR EGRESS.
X01214890-I1
04/28/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Stephen Shishko
04/28/2025
Special inspection requirement — HVAC-R and service water heating equipment
Stephen Shishko
04/28/2025
Special inspection requirement — Maintenance information
Stephen Shishko
04/28/2025
Special inspection requirement — HVAC-R and service water heating system controls
Stephen Shishko
04/28/2025
Special inspection requirement — HVAC-R and service water heating equipment
Stephen Shishko
04/28/2025
Special inspection requirement — HVAC-R and service water heating system controls
Stephen Shishko
04/23/2025
Special inspection requirement — Tenant Protection Plan Compliance
Stephen Shishko
Latest 60 of 86 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offACCURATE MECH INDSTRS INC05/02/2025
DOB NOWBoiler EquipmentSigned-offACCURATE MECH INDSTRS INC05/01/2025
DOB NOWSidewalk ShedSigned-offHKS CONSTRUCTION CORP05/22/2018
DOB NOWSidewalk ShedSigned-offHKS CONSTRUCTION CORP10/31/2017
BISOTISSUEDROSE CONTRACTOR NY, INC06/29/2018
BISOTISSUEDROSE CONTRACTOR NY, INC10/28/2017
BISOTISSUEDSOLAR ENERGY SYSTEMS INC12/12/2007
BISSPISSUEDH.A.M FIRE EQUIPMENT /DBA TRI-CO05/01/2007
BIS—ISSUEDGALAXY GEN'L CONTRG CORP03/21/2007
BISPLISSUEDJD PLUMBING & HEATING CO09/29/2006
BISSDISSUEDH.A.M FIRE EQUIPMENT /DBA TRI-CO04/13/2006
BISEQISSUEDROCKLEDGE SCAFFOLD CORP04/12/2006
BIS—ISSUEDGALAXY GEN'L CONTRG CORP03/21/2006
BISPLISSUEDJD PLUMBING & HEATING CO09/30/2005
BIS—ISSUEDGALAXY GEN'L CONTRG CORP06/27/2005
BISEQISSUEDROCKLEDGE SCAFFOLD CORP06/24/2005
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
10/23/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/10/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/30/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/30/2025Pass-Final Boiler Equipment InspectionPassView ↗
09/25/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
04/28/2025HVAC-R and service water piping design and insulationStephen Shishkoenergy_progress
04/28/2025HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
04/28/2025Maintenance informationStephen Shishkoenergy_progress
04/28/2025HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
04/28/2025HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
04/28/2025HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
04/23/2025Tenant Protection Plan ComplianceStephen Shishkospecial
04/23/2025Tenant Protection Plan ComplianceStephen Shishkospecial
▾Documents — 60 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/19/2026X01214890-I1Request digital key ↗
08/19/2026X01214890-S1Request digital key ↗
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION3
10/26/2017240203971Open ↗
04/08/2009210113385Open ↗
03/10/2009210113385Open ↗
▸BISWORK PERMIT APPLICATION3
06/29/2018240203971Open ↗
10/26/2017240203971Open ↗
12/12/2007210026309Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
01/17/2019240203971Open ↗
▸Seals & Professional Certifications23
▸DOB NOWProgress Inspector Seal & Signature6
09/23/2026X01214890-I1Open ↗
09/23/2026X01214890-I1Open ↗
09/23/2026X01214890-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
01/17/2019240203971Open ↗
03/20/2008210026309Open ↗
12/12/2007210026309Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
03/11/2009210113385Open ↗
12/10/2007210026309Open ↗
▸BISPC FULL REPORT2
01/04/2008210029501Open ↗
12/10/2007210026309Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
03/10/2009210113385Open ↗
12/10/2007210026309Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026X01214890-S1Open ↗
08/13/2026X01214890-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/23/2026X01214890-I1Open ↗
08/28/2026X01214890-S1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/26/2017240203971Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/26/2017240203971Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/26/2017240203971Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST1
04/08/2009210113385Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES1
10/26/2017240203971Open ↗
▸Environmental & Asbestos3
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
01/04/2008210029501Open ↗
12/10/2007210026309Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/26/2017240203971Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
01/17/2019240203971Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/26/2017240203971Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
01/17/2019240203971Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
10/26/2017240203971Open ↗
▸Approvals, Objections & Sign-offs10
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
01/17/2019240203971Open ↗
05/05/2008210029501Open ↗
03/20/2008210026309Open ↗
▸BISADMINISTRATIVE OBJECTIONS3
03/10/2009210113385Open ↗
01/04/2008210029501Open ↗
12/10/2007210026309Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/13/2026X01214890-I1Open ↗
08/13/2026X01214890-S1Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
03/10/2009210113385Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
05/05/2008210029501Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
01/17/2019240203971Open ↗
10/26/2017240203971Open ↗
03/10/2009210113385Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET1
03/10/2009210113385Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/26/2017240203971Open ↗
▸BISBOROUGH INTAKE FORM1
01/17/2019240203971Open ↗
▸Other Documents1
▸BISPLOT DIAGRAM1
03/11/2009210113385Open ↗