← Back
Auto body / collision or auto repair
2351 LORILLARD PLACE
BRONX · BIN 2011695
💬 Discuss this project
1931Year Built
1Stories
G2Building Class
M1-4/R7AZoning
2,160 sfGross Floor Area
2Units
1 Open Violation 0 unresolved · 1 paperwork only ▸
Auto body / collision or auto repair · Owner of record: LORILLARD COMMONS LLC · 4,308 sf lot · 0.5 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipment
Permit Issued — active, not yet Signed-off
Roof3p · 1 filing · 14 docs
Floor 9Under Construction61p · 1 filing · 20 docs
Floor 8Under Construction55p · 1 filing · 20 docs
Floor 7Under Construction56p · 2 filings · 20 docs
Floor 6Under Construction54p · 1 filing · 20 docs
Floor 5Under Construction54p · 1 filing · 20 docs
Floor 4Under Construction54p · 1 filing · 20 docs
Floor 3Under Construction54p · 1 filing · 20 docs
Floor 2Under Construction62p · 2 filings · 20 docs
Floor 1Under Construction61p · 3 filings · 20 docs
Mezzanine2p · 1 filing · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WESTORCHARD MANAGEMENT4709/13/2026
OWNERS REP1305/29/2026
BLUE SKY BUILDERS103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/12/2025$2.0M—4568 THIRD AVE REALTY CORP → LORILLARD COMMONS LLC$926/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC DESIGN FILE2303/21/2026
AE DESIGN SOLUTION1403/21/2026
AVALON DESIGNS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
INNOVATIVE CONSTR NYC LLCGeneral Contractor1207/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor505/29/2026
PRIME PIPING & HEATING INFire Protection306/02/2026
SWIFT SERVICES CORPGeneral Contractor104/09/2026
MES CONSTRUCTION CORPPlumbing107/08/2026
PRIME PIPING & HEATING INPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56162108/20/2026
ADROIT ENGINEERING PLLC8885105/08/2025
Building Lifecycle
All (146)Filed (38)Permit Issued (19)Signed Off (15)Violation (3)Inspection (14)Objection (24)Special Inspection (30)Tax Incentive (3)
12/22/2026
485-x construction completed
08/20/2026
Filed — New Building
Filing temporary standpipe plans subsequent to primary job number X01150951-I1.
X01150951-B8
08/17/2026
Special inspection requirement — Lighting controls
SHAHRIAR QUAYYUM
08/17/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
SHAHRIAR QUAYYUM
08/17/2026
Special inspection requirement — Exterior lighting power
SHAHRIAR QUAYYUM
08/17/2026
Special inspection requirement — Air barrier - visual inspection
SHAHRIAR QUAYYUM
08/17/2026
Special inspection requirement — Fire-Resistance Rated Construction
SHAHRIAR QUAYYUM
08/17/2026
Special inspection requirement — Lighting in dwelling units
SHAHRIAR QUAYYUM
08/17/2026
Special inspection requirement — Electric vehicle service equipment requirements
SHAHRIAR QUAYYUM
08/17/2026
Special inspection requirement — Fenestration air leakage
SHAHRIAR QUAYYUM
08/17/2026
Special inspection requirement — Air barrier continuity plan testing
SHAHRIAR QUAYYUM
08/17/2026
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
08/17/2026
Special inspection requirement — Insulation placement and R values
SHAHRIAR QUAYYUM
08/17/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SHAHRIAR QUAYYUM
08/17/2026
Special inspection requirement — Interior lighting power
SHAHRIAR QUAYYUM
08/17/2026
Special inspection requirement — Metering
SHAHRIAR QUAYYUM
08/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
08/17/2026
Special inspection requirement — Energy Code Compliance Inspections
SHAHRIAR QUAYYUM
08/17/2026
Special inspection requirement — Protection of exposed foundation insulation
SHAHRIAR QUAYYUM
08/17/2026
Special inspection requirement — Fenestration areas
SHAHRIAR QUAYYUM
08/10/2026
Signed off — New Building
Filing temporary standpipe plans subsequent to primary job number X01150951-I1.
X01150951-S9
08/10/2026
Signed off — New Building
Filing temporary standpipe plans subsequent to primary job number X01150951-I1.
X01150951-S3
08/10/2026
Signed off — New Building
Filing temporary standpipe plans subsequent to primary job number X01150951-I1.
X01150951-S2
07/17/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/17/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/17/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/07/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/25/2026
Signed off — New Building
Filing temporary standpipe plans subsequent to primary job number X01150951-I1.
X01150951-S6
06/23/2026
Signed off — New Building
Filing temporary standpipe plans subsequent to primary job number X01150951-I1.
X01150951-S1
06/09/2026
Signed off — Alteration
installation of 8' construction fence
X01233061-I1
06/05/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/04/2026
Signed off — New Building
Filing temporary standpipe plans subsequent to primary job number X01150951-I1.
X01150951-S7
06/03/2026
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
06/03/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/28/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY PERSONNEL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01332291-I1
05/28/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01324962-I1
05/28/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01324954-I1
05/28/2026
Signed off — Alteration
X01324966-I1
05/28/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01324971-I1
05/24/2026
Special inspection requirement — Post-installed Anchors
SHAHRIAR QUAYYUM
05/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
05/24/2026
Special inspection requirement — Sprinkler Systems
SHAHRIAR QUAYYUM
05/24/2026
Special inspection requirement — Standpipe Systems
SHAHRIAR QUAYYUM
05/20/2026
Signed off — New Building
Filing temporary standpipe plans subsequent to primary job number X01150951-I1.
X01150951-S8
05/17/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/13/2026
Signed off — New Building
Filing temporary standpipe plans subsequent to primary job number X01150951-I1.
X01150951-S5
05/13/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/08/2026
Permit issued — Plumbing
X53360904-S2-PL
05/05/2026
Filed — New Building
Filing temporary standpipe plans subsequent to primary job number X01150951-I1.
X01150951-B4
05/05/2026
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
05/05/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SHAHRIAR QUAYYUM
05/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
05/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
05/05/2026
Special inspection requirement — HVAC-R and service water heating system controls
SHAHRIAR QUAYYUM
05/05/2026
Special inspection requirement — HVAC-R and service water heating equipment
SHAHRIAR QUAYYUM
05/05/2026
Special inspection requirement — HVAC-R and service water heating equipment
SHAHRIAR QUAYYUM
05/05/2026
Special inspection requirement — HVAC-R and service water heating system controls
SHAHRIAR QUAYYUM
05/01/2026
Filed — New Building
Filing temporary standpipe plans subsequent to primary job number X01150951-I1.
X01150951-B3
04/30/2026
Permit issued — General Construction
X01150951-I1-GC
04/15/2026
Objection resolved — Resolved
Latest 60 of 146 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offMES CONSTRUCTION CORP05/08/2026
DOB NOWGeneral ConstructionPermit IssuedINNOVATIVE CONSTR NYC LLC04/30/2026
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC01/27/2026
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC12/15/2025
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC12/01/2025
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC12/01/2025
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC11/26/2025
DOB NOWFull DemolitionSigned-offSWIFT SERVICES CORP11/19/2025
DOB NOWGeneral ConstructionPermit IssuedINNOVATIVE CONSTR NYC LLC10/30/2025
DOB NOWSupport of ExcavationSigned-offINNOVATIVE CONSTR NYC LLC10/30/2025
DOB NOWStructuralSigned-offINNOVATIVE CONSTR NYC LLC10/24/2025
DOB NOWMechanical SystemsSigned-offINNOVATIVE CONSTR NYC LLC10/24/2025
DOB NOWFoundationSigned-offINNOVATIVE CONSTR NYC LLC10/24/2025
DOB NOWConstruction FenceSigned-offINNOVATIVE CONSTR NYC LLC10/21/2025
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN09/17/2025
DOB NOWStandpipeSigned-offA M B MECHANICAL INC09/17/2025
DOB NOWSprinklersSigned-offPRIME PIPING & HEATING IN09/16/2025
DOB NOWSprinklersSigned-offA M B MECHANICAL INC09/16/2025
DOB NOWConstruction FenceSigned-offINNOVATIVE CONSTR NYC LLC07/14/2025
1 project · most recent 08/20/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/20/2026Permit IssuedINNOVATIVE CONSTR NYC LLCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Amana PTH093J30 17,000 BTU · Heat Pump Outdoor ×876
PTH153J30 28,000 BTU · Heat Pump Outdoor ×332
PBH093G35CC 265 CFM · Furnace ×64
PBH113G35CC 265 CFM · Furnace ×18
PTH123J30 22,400 BTU · Heat Pump Outdoor ×50
Ventilation
Greenheck G-097-VG 225 CFM · Exhaust Fan ×32
G-098-VG 375 CFM · Exhaust Fan ×32
G-095-VG 250 CFM · Exhaust Fan ×8
CSP-A700-VG 450 CFM · Exhaust Fan ×4
G-100HP-VG 675 CFM · Exhaust Fan ×4
AX-54-190-0417 7,500 CFM · Exhaust Fan ×2
1 project · most recent 08/20/2026
Sprinkler System
FiledStatusContractorScope
08/20/2026Signed-offPRIME PIPING & HEATING INSprinkler System
1 project · most recent 08/20/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/20/2026Signed-offPRIME PIPING & HEATING INGas, Storm, Water/Sanitary
6 projects · most recent 02/05/2026
General Wiring
FiledStatusContractorScope
02/05/2026CompleteSOLAS ELECTRICAL CORP—
12/02/2025CompleteSOLAS ELECTRICAL CORP—
11/03/2025CompleteINTELOGIC ELECTRIC, INC.—
11/03/2025CompleteINTELOGIC ELECTRIC, INC.—
09/29/2025CompleteHIVOLTS ELECTRICAL INCGeneral Wiring
09/29/2025CompleteHIVOLTS ELECTRICAL INC1 meters, 1 new_meters
2 projects · most recent 08/20/2026
Concrete Masonry
FiledStatusContractorScope
08/20/2026Permit IssuedINNOVATIVE CONSTR NYC LLCConcrete, Masonry
02/05/2026Signed-offCORE SCAFFOLD SYSTEMS INC1 scope_items
4 projects · most recent 08/20/2026
Fence Sidewalk Shed Scaffold
FiledStatusContractorScope
08/20/2026Permit IssuedINNOVATIVE CONSTR NYC LLCFence
03/27/2026Signed-offCORE SCAFFOLD SYSTEMS INCSidewalk Shed
11/26/2025Signed-offCORE SCAFFOLD SYSTEMS INCScaffold
05/29/2025Signed-offINNOVATIVE CONSTR NYC LLCFence
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
07/17/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/17/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/17/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/07/2026Pass-Final CND-Occupancy InspectionPassView ↗
06/05/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/03/2026Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
06/03/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/17/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/13/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/10/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
03/10/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/27/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/27/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
02/24/2026Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 149
DateRequirementInspectorRole
08/17/2026Electric vehicle service equipment requirementsSHAHRIAR QUAYYUMenergy_progress
08/17/2026MeteringSHAHRIAR QUAYYUMenergy_progress
08/17/2026Fenestration and door U-factor and product ratingsSHAHRIAR QUAYYUMenergy_progress
08/17/2026Maintenance informationSHAHRIAR QUAYYUMenergy_progress
08/17/2026Air barrier - visual inspectionSHAHRIAR QUAYYUMenergy_progress
08/17/2026Exterior lighting powerSHAHRIAR QUAYYUMenergy_progress
08/17/2026Fenestration air leakageSHAHRIAR QUAYYUMenergy_progress
08/17/2026Lighting in dwelling unitsSHAHRIAR QUAYYUMenergy_progress
08/17/2026Insulation placement and R valuesSHAHRIAR QUAYYUMenergy_progress
08/17/2026Interior lighting powerSHAHRIAR QUAYYUMenergy_progress
08/17/2026Exterior Insulation and Finish Systems (EIFS)SHAHRIAR QUAYYUMspecial
08/17/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
08/17/2026Energy Code Compliance InspectionsSHAHRIAR QUAYYUMprogress
08/17/2026Fire-Resistance Rated ConstructionSHAHRIAR QUAYYUMprogress
08/17/2026Protection of exposed foundation insulationSHAHRIAR QUAYYUMenergy_progress
08/17/2026Fenestration areasSHAHRIAR QUAYYUMenergy_progress
08/17/2026Air barrier continuity plan testingSHAHRIAR QUAYYUMenergy_progress
08/17/2026Lighting controlsSHAHRIAR QUAYYUMenergy_progress
05/24/2026Standpipe SystemsSHAHRIAR QUAYYUMspecial
05/24/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
05/24/2026Post-installed AnchorsSHAHRIAR QUAYYUMspecial
05/24/2026Sprinkler SystemsSHAHRIAR QUAYYUMspecial
05/05/2026Maintenance informationSHAHRIAR QUAYYUMenergy_progress
05/05/2026HVAC-R and service water piping design and insulationSHAHRIAR QUAYYUMenergy_progress
05/05/2026Maintenance informationSHAHRIAR QUAYYUMenergy_progress
Latest 25 of 149.
▾Documents — 193 on file (BIS + DOB NOW)
▸Plans & Drawings40
▸DOB NOWPlans/Sketch40
08/19/2026X01150951-B8Request digital key ↗
08/19/2026X01150951-B8Request digital key ↗
08/19/2026X01205383-I1Request digital key ↗
Showing 3 of 40 on file for this type
▸Applications & Permits2
▸BISBPP-5 - Authorization to the Department of Transportation1
08/25/2025240362825Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
10/02/2025240362825Open ↗
▸Zoning, Tax Lot & Property Records17
▸DOB NOWZD1: DOB Zoning Diagram7
08/19/2026X01150951-B8Open ↗
08/19/2026X01150951-B8Open ↗
08/16/2026X01150951-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWZoning Exhibit form (1-5)7
08/19/2026X01150951-B8Open ↗
08/19/2026X01150951-B8Open ↗
08/16/2026X01150951-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026X01150951-A4Open ↗
08/13/2026X01150951-I1Open ↗
▸DOB NOWRestrictive Declaration/Easement 11
08/22/2026X01150951-B8Open ↗
▸Seals & Professional Certifications73
▸DOB NOWDPL-1: Design Professional Seal & Signature37
08/19/2026X01150951-B8Open ↗
08/17/2026X01324966-I1Open ↗
08/17/2026X01324962-I1Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/02/2026X01150951-S5Open ↗
09/01/2026X01150951-A1Open ↗
09/01/2026X01150951-B4Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
09/02/2026X01150951-S5Open ↗
09/01/2026X01150951-B4Open ↗
09/01/2026X01150951-S1Open ↗
Showing 3 of 16 on file for this type
▸Trade Schedules & Equipment6
▸DOB NOWElectric Cut-Off1
08/13/2026X01205383-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026X01205383-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026X01205383-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026X01205383-I1Open ↗
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026X01150951-I1Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/13/2026X01150951-I1—
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist7
08/19/2026X01150951-B8Open ↗
08/19/2026X01150951-B8Open ↗
08/16/2026X01150951-I1Open ↗
Showing 3 of 7 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
08/25/2025240362825Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X01150951-I1Open ↗
▸Environmental & Asbestos17
▸DOB NOWOER: Notice to Proceed8
08/16/2026X01150951-S2Open ↗
08/13/2026X01150951-S1Open ↗
08/13/2026X01150951-S2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWOER: Notice of Satisfaction6
08/16/2026X01150951-S2Open ↗
08/16/2026X01150951-S1Open ↗
08/16/2026X01150951-I1Open ↗
Showing 3 of 6 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
08/25/2025240362825Open ↗
▸DOB NOWRodent Control1
08/13/2026X01205383-I1Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026X01205383-I1Open ↗
▸Energy Compliance2
▸DOB NOWPreliminary Commissioning Report Certification2
08/16/2026X01150951-S2Open ↗
08/16/2026X01150951-S1Open ↗
▸Other Documents27
▸DOB NOWSite Survey: Initial7
08/19/2026X01150951-B8Open ↗
08/19/2026X01150951-B8Open ↗
08/16/2026X01150951-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone7
08/19/2026X01150951-B8Open ↗
08/19/2026X01150951-B8Open ↗
08/16/2026X01150951-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProperty Ownership Certification7
08/19/2026X01150951-B8Open ↗
08/19/2026X01150951-B8Open ↗
08/16/2026X01150951-I1Open ↗
Showing 3 of 7 on file for this type
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
08/25/2025240362825Open ↗
▸DOB NOWStructure Photographs1
08/13/2026X01205383-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026X01205383-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026X01150951-S6Open ↗
▸DOB NOWFinal Survey1
08/16/2026X01150951-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026X01205383-I1Open ↗