← Back
BuildNYC
Church, synagogue, chapel
2351 NEWBOLD AVENUE
BRONX · BIN 2027165
💬 Discuss this project
2010Year Built
4Stories
M1Building Class
R5Zoning
—Gross Floor Area
1Units
1 Active Violation ▸FDNY Report ↗
Church, synagogue, chapel · Owner of record: Baitul Aman Islamiccenter · 2.07 FAR built · Flood zone X
Locations of Work
No floor-level scope or filed-document coverage on file for this building.
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Taslim ConstructionGeneral Contractor303/22/2026
Gemini Electric CoElectrical103/22/2026
L.L.G. Plumbing & HeatingPlumbing103/22/2026
Building Lifecycle
All (57)Violation (55)
09/15/2026
Elevator Category 1 inspection report filed
07/03/2025
ADM-02-01: Failed to provide a Certificate of Occupancy or other authorization or approval issued by the Department of Building or other agency…
FDNY_ORDER violation · closed
05/15/2024
Failure to comply with commissioner's order contained in summons #35556464J issued on 5/5/2021, and failure to file a certificate of correction…
ECB violation · closed
07/15/2022
Elevator Category 5 inspection report filed
05/05/2021
Document to be kept onsite.at the time of my inspection at under construction new 4 story building.upon searching the permimeter of the siteand the…
ECB violation · closed
05/05/2021
No handrails.at the time of my inspection at a 4 story building under construction,i observed no handrails on permanent structures on all four…
ECB violation · closed
05/05/2021
Signs.at the time of my inspection at a 4 story building under construction,i observed no floor signs,exit signs,and no smoking signs.other…
ECB violation · closed
05/05/2021
3301.1.2 failure to comply with FDNY code.at the time of my inspectionat a 4 story building under construction i observed loose propane tankon the…
ECB violation · closed
05/05/2021
No construction superintendent or competent person onsite.at the time of my inspection at a 4 story under construction new building jobsite,upon…
ECB violation · closed
10/02/2020
Closed: Failure to certify correction on immediately hazardous (class 1) ECB violation
DOB violation · closed on the city's record
09/02/2020
Failure to certify correction on immediately hazardous (class 1) ECB violation
DOB violation · closed · Issued 2020; DOB's record still lists it as active
03/10/2020
Failure to maintain/display on site documents required by bc CHAPTER33AT the time of inspection it was observed that the contractors could not…
ECB violation · closed
03/10/2020
BC330372-fire extiguishers shall be provided in accordance with the new york city fire code.at the time of inspection it was observed that the…
ECB violation · closed
03/10/2020
Construction superintendent failed to perform duties per code.at the time of inspection it was observed that the superintendent failed to perform…
ECB violation · closed
03/10/2020
Work w/o a permit.at the time of inspection it was observed that the contractors were working without a valid permit.perit expired on 11/17/19 and…
ECB violation · closed
03/10/2020
Electrical work without permit.at the time of inspection,observed thatthe gc failed to obtain the proper electrical permits for the temporary…
ECB violation · closed
09/20/2019
Closed: Failure to file benchmarking report of energy use as per ad. Code sec. 28-309.4
DOB violation · closed on the city's record
08/02/2019
Failure to file benchmarking report of energy use as per ad. Code sec. 28-309.4
DOB violation · closed · Issued 2019; DOB's record still lists it as active
05/02/2019
Failure to file benchmarking report of energy use as per ad. Code sec. 28-309.4
DOB violation · closed · Issued 2019; DOB's record still lists it as active
04/29/2019
Closed: The dept.of buildings intends to revoke the permit and approvals and permit issued under job #210049106 due to the suspension of the master…
DOB violation · closed on the city's record
03/25/2019
Job site fence not constructed and maintained pursuant to sub section.at the time of inspection i oberved active construction job site i noted…
ECB violation · closed
03/16/2019
The dept.of buildings intends to revoke the permit and approvals and permit issued under job #210049106 due to the suspension of the master…
DOB violation · closed · Issued 2019; DOB's record still lists it as active
02/16/2019
Failure to file benchmarking report of energy use as per ad. Code sec. 28-309.4
DOB violation · closed · Issued 2019; DOB's record still lists it as active
12/26/2017
Closed: Construction super of record has withdrawn 210049106. Stop all work an d make site safe
DOB violation · closed on the city's record
11/02/2017
Construction super of record has withdrawn 210049106. Stop all work an d make site safe
DOB violation · closed · Issued 2017; DOB's record still lists it as active
08/21/2017
BC3307.3.2 failure to provide required lot-line construction fence attime of inspection observed construction site,contractor was perform framing…
ECB violation · closed
07/27/2016
Closed: Failure to certify correction on immediately hazardous (class 1) ECB violation
DOB violation · closed on the city's record
07/25/2016
Closed: Failure to certify correction on immediately hazardous (class 1) ECB violation
DOB violation · closed on the city's record
06/29/2016
Failure to certify correction on immediately hazardous (class 1) ECB violation
DOB violation · closed · Issued 2016; DOB's record still lists it as active
03/28/2016
Required project information panel not provided. This is a purposed 4 sty house of worship. Remedy: provide "project information panel" at site.
ECB violation · closed
03/28/2016
3303.7.2 failure to provide fire extinguishers as per fire code.no fire extinguishers were observed throughout bldg. Rmdy: provide requiredfire…
ECB violation · closed
03/28/2016
3301.2 failure to safeguard public and property due to construction operations. Entrance gate onto site swings out onto side and was open at time…
ECB violation · closed
03/28/2016
3301.2 top lip of stair risers are not level with stairway landing this causing a tripping hazard.tip varis from 1/2" to 2" at different stair…
ECB violation · closed
03/28/2016
Failure to post "no smoking" signs at construction site per fire code.no "no smoking" were observed throughout bldg at time of inspection. Rmdy:…
ECB violation · closed
03/28/2016
Failure to provide required handrailing as per code. Handrails have not been provided for all sairs in bldg. Note: 2 handrails observed on upper…
ECB violation · open
03/28/2016
Failure to provide required guard railing as per code. Guardrails havenot been provided at stairway openigns in floors and at stairway land ings.…
ECB violation · closed
03/28/2016
3307.7.2 failure to provide fence as required no required 8'h solid fence has been provided for the entire length of EXP2 and 3.NB is still being…
ECB violation · closed
03/28/2016
3303.2.4 sanitary facilities have not been provided during construction activities. No working bathrooms or temporary facilities (port-o- johns)…
ECB violation · closed
07/24/2015
Temporary construction equipment on site expired permit. At time of inspetion of 4STORY new building under construction has erected 8'high wall…
ECB violation · closed
02/08/2014
Job site fence not constructed pursuant to subsection fence at west side of site (exposure 2) is only 4'high code requires fence to be 8'high. Also…
ECB violation · closed
12/04/2013
Failure to institute/maitain safety equipment measures or temp construction - no guardrails noted: guardrail system missing by top landing of…
ECB violation · closed
12/04/2013
Failure to maintain adequate housekeeping per section requirement. Noted: at ground flr inside of job fence there is a larger amount of garbage…
ECB violation · closed
12/04/2013
Failure to institute/maintain safety equipment measures or temp construction - no hand rails. Bldg erected to the 4TH flr - 2 staircases on…
ECB violation · closed
10/24/2013
Job site fence not constructed or maintained pursuant to subsection. Noted: construction site fence erected under permit #210049106-01-eq-fn issued…
ECB violation · closed
01/25/2013
Closed: Failure to certify correction on immediately hazardous (class 1) ECB violation
DOB violation · closed on the city's record
01/02/2013
Failure to certify correction on immediately hazardous (class 1) ECB violation
DOB violation · closed · Issued 2013; DOB's record still lists it as active
09/26/2012
Closed: Failure to certify correction on immediately hazardous (class 1) ECB violation
DOB violation · closed on the city's record
09/13/2012
Failure to institute/maintain safety equipment measures or temporary construction-no guardrails. New building under application #210049106, expires…
ECB violation · closed
09/13/2012
Failure to provide approved/accepted plans at job site at time of inspection.new building under application #210049106 expires 5/5/13;workerat site…
ECB violation · closed
01/01/2012
Failure to file benchmarking report of energy use as per ad. Code sec. 28-309.4
DOB violation · closed · Issued 2012; DOB's record still lists it as active
11/02/2011
Failure to certify correction on immediately hazardous (class 1) ECB violation
DOB violation · closed · Issued 2011; DOB's record still lists it as active
08/24/2011
Closed: Construction: other (DOB violation)
DOB violation · closed on the city's record
08/12/2011
Construction: other (DOB violation)
DOB violation · closed · Issued 2011; DOB's record still lists it as active
08/12/2011
Work w/o a permit. Noted at time of inspecion NB up to 1ST flr slab. Foundation walls, steel column and slabs in place. No permit issued for this…
ECB violation · closed
08/12/2011
Failure to institute/maintain safety equipment measures or temp construction- no guard rails. Noted: at time of inspection 3 - approx 9' x 9' -…
ECB violation · closed
08/11/2011
Work does not conform to approved construction documents &/or approvedamendments.as per approved plan under appl#210049106,bldg is to be 8FT from…
ECB violation · closed
12/16/2010
Work w/o a permit. Expired permit. Permit under appl #220012073 for construction site fence expired 7.19.10. Remedy: renew permit.
ECB violation · closed
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BIS—Taslim Construction—
BIS—Taslim Construction—
BIS—L.L.G. Plumbing & Heating—
BIS—Taslim Construction—
BIS—T&S Home Improvement—
BIS—T&S Home Improvement—
BIS—T&S Home Improvement—
BIS—Cam Energy Heating and Me—
BIS—Skyview Air Conditioning—
BIS—T&S Home Improvement—
BIS—T&S Home Improvement—
BIS—Top Plumbing System—
BIS—T&S Home Improvement—
BIS—T&S Home Improvement—
BIS—T&S Home Improvement—
BIS—T&S Home Improvement—
BIS—T&S Home Improvement—
BIS—T&S Home Improvement—
BIS—New Family Homes & Building—
BIS—Kings Star Construction—
BIS—Kings Star Construction—
BIS—Vitello Sewer W.M. H&P Services—
BIS—Kings Star Construction—
BIS—Kings Star Construction—
BIS—Kings Star Construction—
BIS—Kings Star Construction—
BIS—Taslim Construction—
BIS—Taslim Construction—
BIS—Taslim Construction—
BIS—Taslim Construction—
BIS—Taslim Construction—
BIS—Taslim Construction—
BIS—Taslim Construction—
BIS—Taslim Construction—
BIS—Taslim Construction—
BIS—Three Star Construction—
BIS—Three Star Construction—
BIS—Taslim Construction—
BIS—Taslim Construction—
BIS—Paradise Construction Co.i—
+ 9 more permits on file
Nothing on file for this building.
Nothing on file for this building.
▾Documents — 175 on file (BIS + DOB NOW)
▸Applications & Permits65
▸BISWORK PERMIT APPLICATION35
02/07/2022210049106Open ↗
02/07/2022210049106Open ↗
06/15/2021210049106Open ↗
Showing 3 of 35 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION25
11/13/2023210049106Open ↗
02/22/2023210049106Open ↗
11/16/2022210049106Open ↗
Showing 3 of 25 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
07/25/2008210060690Open ↗
07/25/2008210060690Open ↗
▸BISPLACE OF ASSEMBLY2
11/07/2011220146054Open ↗
11/07/2011220148793Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
04/08/2022210049106Open ↗
▸Seals & Professional Certifications7
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
02/28/2019220692178Open ↗
09/16/2011220139482Open ↗
09/21/2009210049106Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
02/28/2019220692178Open ↗
09/16/2011220139482Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
02/28/2019220692178Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
09/16/2011220139482Open ↗
▸Trade Schedules & Equipment11
▸BISSCHEDULE B - PLUMBING6
08/26/2022210049106Open ↗
04/14/2022210049106Open ↗
10/01/2021210049106Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
12/15/2015210049106Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
02/28/2019220692178Open ↗
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0211
08/02/2017210049106Open ↗
▸BISSEWER CONNECTION: DEP SD1 & SD21
09/02/2009210049106Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
05/16/2023220684551Open ↗
▸Safety & Tenant Protection5
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE5
09/21/2009210049106Open ↗
09/21/2009210049106Open ↗
07/24/2009220012082Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos2
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
06/16/2009220012082Open ↗
06/16/2009220012073Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
02/28/2019220692178Open ↗
▸BISTR8: Energy Code Progress Inspections1
10/28/2011220139482Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY3
11/03/2022210049106Open ↗
11/02/2022210049106Open ↗
05/19/2022210049106Open ↗
▸BISMASONRY1
02/28/2024210049106Open ↗
▸BISMECHANICAL SYSTEMS1
02/28/2024210049106Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
02/28/2024210049106Open ↗
▸Approvals, Objections & Sign-offs36
▸BISLETTERS - SUPPORTING DOCUMENTATION11
04/18/2019220684551Open ↗
02/28/2019220692178Open ↗
10/04/2016210049106Open ↗
Showing 3 of 11 on file for this type
▸BISSUPERSEDING LETTER11
02/07/2022210049106Open ↗
06/15/2021210049106Open ↗
03/19/2021210049106Open ↗
Showing 3 of 11 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
11/07/2011220146054Open ↗
11/07/2011220148793Open ↗
09/16/2011220139482Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE6
02/22/2023210049106Open ↗
05/24/2022210049106Open ↗
05/25/2012210049106Open ↗
Showing 3 of 6 on file for this type
▸Cost, Insurance & Ownership19
▸BISPROJECT-SPECIFIC GL INSURANCE12
03/19/2021210049106Open ↗
01/02/2018210049106Open ↗
08/24/2017210049106Open ↗
Showing 3 of 12 on file for this type
▸BISCOST AFFIDAVIT4
04/18/2019220684551Open ↗
02/28/2019220692178Open ↗
09/16/2011220139482Open ↗
Showing 3 of 4 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)2
10/04/2016210049106Open ↗
09/27/2016210049106Open ↗
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
10/04/2016210049106Open ↗
▸Filing & Intake Forms21
▸BISEFILING COVER SHEET9
04/18/2019220684551Open ↗
02/28/2019220692178Open ↗
09/16/2011220139482Open ↗
Showing 3 of 9 on file for this type
▸BISADDITIONAL INFORMATION7
10/17/2022210049106Open ↗
09/07/2022210049106Open ↗
05/05/2022210049106Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM3
02/07/2022210049106Open ↗
02/07/2022210049106Open ↗
06/15/2021210049106Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT32
09/08/2011220138615Open ↗
07/25/2008210060690Open ↗
▸Other Documents1
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
10/27/2015210049106Open ↗