← Back
Office only, 2-6 stories
2354 WESTCHESTER AVENUE
BRONX · Westchester Square · BIN 2092888
💬 Discuss this project
1998Year Built
2Stories
O2Building Class
M1-2Zoning
47,777 sfGross Floor Area
2Units
LL97 CoveredRent Stabilized1 Open Violation ▸
Office only, 2-6 stories · Owner of record: PARKER HATZLACHA LLC · 18,424 sf lot · 2.59 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof51p · 4 filings · 20 docs
Floor 154p · 3 filings · 20 docs
Cellar17p · 2 filings · 19 docs
Filed — no permit issued2p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CENTERS HEALTH CARE1307/08/2026
ESPO ASSOCIATES703/21/2026
PARKER HATZLACHA LLC103/22/2026
NAMDAR REALTY GROUP103/21/2026
DOMINICKS103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/21/2016$8.3M—PARKER WEST REALTY LLC → PARKER HATZLACHA LLC$174/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PINTO STUDIO203/21/2026
ROSENBAUM DESIGN GROUP703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ONE70 GROUP LLCGeneral Contractor807/08/2026
HYDROTAC SERVICES LLCPlumbing307/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SGM ENGINEERING2366707/16/2025
PINTO STUDIO INC6366111/09/2018
Building Lifecycle
All (113)Filed (8)Permit Issued (5)Signed Off (5)Violation (60)Inspection (5)Special Inspection (30)
09/15/2025
Signed off — Alteration
New Social Security Office: Water supply line, sanitary line and venting for new sinks, toilets and floor drains; gas lines for new roof top units.
X01020603-I1
08/19/2025
Signed off — Alteration
New Social Security Office: Removal of existing rooftop units and associated duct work, new rooftop units, exhaust fans and ductwork.
X01020636-I1
08/15/2025
Signed off — Alteration
Lobby improvements: new finish in existing lobby.
X01020348-I1
08/15/2025
Signed off — Alteration
New Social Security Office: new steel roof framing supports for new roof top units.
X01020667-I1
08/15/2025
Signed off — Alteration
New social security office:Proposed alterations to include the installation of non-bearing partitions,ceilings,lighting,within the demised premises on 1FL.No change to the use, egress, occupancy,square footage and/or zoning proposed under this application
X01020369-I1
07/28/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/18/2025
Special inspection requirement — HVAC-R and service water heating equipment
steven Giammona
07/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
steven Giammona
07/18/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
steven Giammona
07/18/2025
Special inspection requirement — HVAC-R and service water heating system controls
steven Giammona
07/18/2025
Special inspection requirement — Maintenance information
steven Giammona
07/16/2025
Filed — Alteration
New Social Security Office: Water supply line, sanitary line and venting for new sinks, toilets and floor drains; gas lines for new roof top units.
X01020603-P1
07/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
steven Giammona
07/16/2025
Special inspection requirement — Mechanical Systems
steven Giammona
07/16/2025
Special inspection requirement — Energy Code Compliance Inspections
steven Giammona
07/16/2025
Special inspection requirement — Final
steven Giammona
07/16/2025
Special inspection requirement — HVAC-R and service water heating system controls
steven Giammona
07/16/2025
Special inspection requirement — Shutoff dampers
steven Giammona
07/16/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
steven Giammona
07/16/2025
Special inspection requirement — Duct leakage testing, insulation and design
steven Giammona
07/16/2025
Special inspection requirement — Maintenance information
steven Giammona
07/16/2025
Special inspection requirement — HVAC-R and service water heating equipment
steven Giammona
07/15/2025
Filed — Alteration
New Social Security Office: Removal of existing rooftop units and associated duct work, new rooftop units, exhaust fans and ductwork.
X01020636-P1
07/15/2025
Special inspection requirement — HVAC-R and service water heating equipment
steven Giammona
07/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
steven Giammona
07/15/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
steven Giammona
07/15/2025
Special inspection requirement — Maintenance information
steven Giammona
07/15/2025
Special inspection requirement — HVAC-R and service water heating system controls
steven Giammona
07/11/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
07/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
steven Giammona
07/10/2025
Special inspection requirement — Mechanical Systems
steven Giammona
07/10/2025
Special inspection requirement — Energy Code Compliance Inspections
steven Giammona
07/10/2025
Special inspection requirement — Final
steven Giammona
07/10/2025
Special inspection requirement — HVAC-R and service water heating system controls
steven Giammona
07/10/2025
Special inspection requirement — HVAC-R and service water heating equipment
steven Giammona
07/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
steven Giammona
07/10/2025
Special inspection requirement — Duct leakage testing, insulation and design
steven Giammona
07/10/2025
Special inspection requirement — Maintenance information
steven Giammona
07/10/2025
Special inspection requirement — Shutoff dampers
steven Giammona
07/01/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/26/2025
Permit issued — General Construction
X01020348-I1-GC
04/28/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/10/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/27/2025
Permit issued — Plumbing
X01020603-I1-PL
02/18/2025
Permit issued — Mechanical Systems
X01020636-I1-MS
02/18/2025
Permit issued — General Construction
X01020369-I1-GC
02/18/2025
Permit issued — Structural
X01020667-I1-ST
02/14/2025
Filed — Alteration
New Social Security Office: Water supply line, sanitary line and venting for new sinks, toilets and floor drains; gas lines for new roof top units.
X01020603-I1
02/14/2025
Filed — Alteration
New Social Security Office: Removal of existing rooftop units and associated duct work, new rooftop units, exhaust fans and ductwork.
X01020636-I1
02/07/2025
Filed — Alteration
Lobby improvements: new finish in existing lobby.
X01020348-I1
02/07/2025
Filed — Alteration
New Social Security Office: new steel roof framing supports for new roof top units.
X01020667-I1
02/07/2025
Filed — Alteration
New social security office:Proposed alterations to include the installation of non-bearing partitions,ceilings,lighting,within the demised premises on 1FL.No change to the use, egress, occupancy,square footage and/or zoning proposed under this application
X01020369-I1
01/08/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/24/2024
Violation issued (ECB, closed)
Construction
03/29/2023
Violation issued (HPD, closed)
A
11/03/2022
Violation issued (HPD, closed)
I
03/08/2022
Violation issued (HPD, closed)
I
03/08/2022
Violation issued (HPD, closed)
A
12/01/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/18/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 113 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offONE70 GROUP LLC06/26/2025
DOB NOWPlumbingSigned-offTORR MECHANICAL LLC02/27/2025
DOB NOWMechanical SystemsSigned-offONE70 GROUP LLC02/18/2025
DOB NOWGeneral ConstructionSigned-offONE70 GROUP LLC02/18/2025
DOB NOWStructuralSigned-offONE70 GROUP LLC02/18/2025
BISOTISSUEDSYNTHESIS INC08/29/2013
BISFPISSUEDFIRE COMMAND CO., INC04/20/2007
BISSPISSUEDG.N.T. MECHANICAL LLC01/11/2001
BISPLISSUEDG.N.T. MECHANICAL LLC08/10/2000
BIS—ISSUEDAMR CONTRACTING09/24/1999
BISEQISSUEDAMR CONTRACTING09/24/1999
BISCCISSUEDANDERSON BLAKE CONSTRUCTION01/07/1999
BISSDISSUEDPSI FIRE CORP10/26/1998
BISSPISSUEDPSI FIRE CORP09/02/1998
BISEQISSUEDANDERSON BLAKE CONSTRUCTION CORP07/20/1998
BIS—ISSUEDANDERSON BLAKE CONSTRUCTION CORP07/20/1998
BIS—ISSUEDANDERSON BLAKE CONSTRUCTION CORP04/21/1998
BISEQISSUEDANDERSON BLAKE CONSTRUCTION CORP04/13/1998
BISEQISSUEDANDERSON BLAKE CONSTRUCTION CORP04/13/1998
BIS—ISSUEDANDERSON BLAKE CONSTRUCTION CORP02/11/1998
BISEQISSUEDANDERSON BLAKE CONSTRUCTION CORP02/11/1998
BISEQISSUEDESPO CONSTRUCTION01/12/1998
BIS—ISSUEDESPO CONSTRUCTION01/12/1998
BIS—ISSUEDESPO CONSTRUCTION INC.12/29/1997
BIS—ISSUEDESPO CONSTRUCTION INC.12/19/1997
BISEQISSUEDESPO CONSTRUCTION INC.12/19/1997
BISFSISSUEDA & C WELDING04/19/1993
BISFPISSUEDARROW MECHANICAL SYSTEMS INC11/21/1991
4 projects · most recent 10/06/2025
General Wiring
FiledStatusContractorScope
10/06/2025CompleteCOUNTY ELECL CONTRACTOR IGeneral Wiring
08/11/2025CompleteCOUNTY ELECL CONTRACTOR IGeneral Wiring
03/12/2025CompleteCOUNTY ELECL CONTRACTOR I—
03/12/2025CompleteCOUNTY ELECL CONTRACTOR IGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/28/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/11/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/01/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/28/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
07/18/2025HVAC-R and service water heating equipmentsteven Giammonaenergy_progress
07/18/2025Fire-Resistant Penetrations and Jointssteven Giammonaspecial
07/18/2025HVAC-R and service water piping design and insulationsteven Giammonaenergy_progress
07/18/2025HVAC-R and service water heating system controlssteven Giammonaenergy_progress
07/18/2025Maintenance informationsteven Giammonaenergy_progress
07/16/2025Fire-Resistant Penetrations and Jointssteven Giammonaspecial
07/16/2025Mechanical Systemssteven Giammonaspecial
07/16/2025Energy Code Compliance Inspectionssteven Giammonaprogress
07/16/2025Finalsteven Giammonaprogress
07/16/2025HVAC-R and service water heating system controlssteven Giammonaenergy_progress
07/16/2025Shutoff damperssteven Giammonaenergy_progress
07/16/2025HVAC-R and service water piping design and insulationsteven Giammonaenergy_progress
07/16/2025Duct leakage testing, insulation and designsteven Giammonaenergy_progress
07/16/2025Maintenance informationsteven Giammonaenergy_progress
07/16/2025HVAC-R and service water heating equipmentsteven Giammonaenergy_progress
07/15/2025HVAC-R and service water heating equipmentsteven Giammonaenergy_progress
07/15/2025Fire-Resistant Penetrations and Jointssteven Giammonaspecial
07/15/2025HVAC-R and service water piping design and insulationsteven Giammonaenergy_progress
07/15/2025Maintenance informationsteven Giammonaenergy_progress
07/15/2025HVAC-R and service water heating system controlssteven Giammonaenergy_progress
07/10/2025Fire-Resistant Penetrations and Jointssteven Giammonaspecial
07/10/2025Mechanical Systemssteven Giammonaspecial
07/10/2025Energy Code Compliance Inspectionssteven Giammonaprogress
07/10/2025Finalsteven Giammonaprogress
07/10/2025HVAC-R and service water heating system controlssteven Giammonaenergy_progress
Latest 25 of 33.
▾Documents — 71 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/26/2026X00084381-I1Request digital key ↗
08/20/2026X01020667-I1Request digital key ↗
08/20/2026X01020369-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION3
03/19/2020201116256Open ↗
01/03/2019220543197Open ↗
08/31/2012220222630Open ↗
▸BISAFTER-HOUR WORK PERMIT APPLICATION2
11/21/2013220222630Open ↗
11/21/2013220222630Open ↗
▸BISWORK PERMIT APPLICATION1
08/29/2013220222630Open ↗
▸Seals & Professional Certifications34
▸DOB NOWProgress Inspector Seal & Signature15
08/31/2026X01020603-I1Open ↗
08/31/2026X01020603-I1Open ↗
08/31/2026X01020603-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/20/2026X01020667-I1Open ↗
08/20/2026X01020636-I1Open ↗
08/20/2026X01020603-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
08/31/2026X01020603-I1Open ↗
08/28/2026X01020636-I1Open ↗
08/28/2026X01020636-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
01/03/2019220543197Open ↗
03/24/2014220222630Open ↗
08/31/2012220222630Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
01/03/2019220543197Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
01/28/2019220543197Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/20/2026X01020667-I1Open ↗
08/20/2026X01020636-I1Open ↗
08/20/2026X01020603-I1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/31/2012220222630Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
01/28/2019220543197Open ↗
03/24/2014220222630Open ↗
08/31/2012220222630Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/24/2014220222630Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
03/24/2014220222630Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
03/24/2014220222630Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
08/28/2012220222630Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
03/24/2014220222630Open ↗
08/31/2012220222630Open ↗
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET2
01/03/2019220543197Open ↗
08/31/2012220222630Open ↗
▸BISADDITIONAL INFORMATION1
09/25/2012220222630Open ↗
▸BISBOROUGH INTAKE FORM1
03/19/2020201116256Open ↗