← Back
Primarily 1 family with 1 store or office
2355 86 STREET
BROOKLYN · BIN 3185335
💬 Discuss this project
1930Year Built
2Stories
S1Building Class
R5Zoning
2,450 sfGross Floor Area
2Units
3 Open Violations 2 unresolved · 1 paperwork only ▸FDNY Report ↗
Primarily 1 family with 1 store or office · 1,900 sf lot · 1.29 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanicalPlumbing
Floor 13p · 1 filing · 20 docs
Cellar3p · 1 filing · 20 docs
1 job · most recent 06/30/2026
Air Conditioning Systems Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/30/2026Signed-offDYKER SOLUTIONS INCAir Conditioning Systems, Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Tuttokool AAC5061E1000A 60,000 BTU · Condensing Unit ×2
Heat / Cool
Kinghome KW09XQ19SDO 9,100 BTU · Condensing Unit ×2
KW12XQ19SDO 12,000 BTU · Condensing Unit ×2
Heating
Tuttokool TGF96U120D5C 120,000 BTU · Furnace ×2
Ventilation
Broan AE50110DC 50 CFM · Exhaust Fan ×6
1 job · most recent 06/30/2026
Gas Water/Sanitary
FiledStatusContractorScope
06/30/2026Signed-offCROSSFIELD PLBG.&HTGGas, Water/Sanitary
2 jobs · most recent 03/18/2026
General Wiring
FiledStatusContractorScope
03/18/2026Permit IssuedW 8 ELECTRIC CORPGeneral Wiring
03/05/2026CompleteW 8 ELECTRIC CORPGeneral Wiring
1 job · most recent 06/30/2026
Fence
FiledStatusContractorScope
06/30/2026Signed-offDYKER SOLUTIONS INCFence
Building Lifecycle
All (65)Filed (7)Permit Issued (4)Signed Off (3)Violation (27)Inspection (8)Special Inspection (16)
07/22/2026
Signed off — Alteration
JOB FILED INTERIOR RENOVATION OF COMMERCIAL SPACE INCLUDING NEW COUNTER AND NEW NON-BEARING PARTITION, NEW FLOOR TILE AND NEW PAINT, NEW FRONT AWNING AS PER PLAN. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01363808-I1
07/14/2026
Signed off — Alteration
INSTALL NEW AWNING WITH CANVAS COVER AT STOREFRONT READING "ENG PRIMARY CARE PLLC" AS PER PLAN. NO CHANGE IN USE, EGRESS,AND OCCUPANCY.
B01411535-I1
07/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Pablo Ayala
07/01/2026
Special inspection requirement — Mechanical Systems
Pablo Ayala
07/01/2026
Special inspection requirement — Final
Pablo Ayala
07/01/2026
Special inspection requirement — Energy Code Compliance Inspections
Pablo Ayala
07/01/2026
Special inspection requirement — Fire-Resistance Rated Construction
Pablo Ayala
07/01/2026
Special inspection requirement — Fenestration air leakage
Pablo Ayala
07/01/2026
Special inspection requirement — Air barrier - visual inspection
Pablo Ayala
07/01/2026
Special inspection requirement — Fenestration areas
Pablo Ayala
07/01/2026
Special inspection requirement — Maintenance information
Pablo Ayala
07/01/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Pablo Ayala
07/01/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Pablo Ayala
07/01/2026
Special inspection requirement — HVAC-R and service water heating system controls
Pablo Ayala
07/01/2026
Special inspection requirement — HVAC-R and service water heating equipment
Pablo Ayala
07/01/2026
Special inspection requirement — Lighting controls
Pablo Ayala
06/30/2026
Filed — Alteration
JOB FILED INTERIOR RENOVATION OF COMMERCIAL SPACE INCLUDING NEW COUNTER AND NEW NON-BEARING PARTITION, NEW FLOOR TILE AND NEW PAINT, NEW FRONT AWNING AS PER PLAN. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01363808-P4
06/26/2026
Signed off — Alteration
JOB FILED INTERIOR RENOVATION OF COMMERCIAL SPACE INCLUDING NEW COUNTER AND NEW NON-BEARING PARTITION, NEW FLOOR TILE AND NEW PAINT, NEW FRONT AWNING AS PER PLAN. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01363808-S2
06/08/2026
Filed — Alteration
JOB FILED INTERIOR RENOVATION OF COMMERCIAL SPACE INCLUDING NEW COUNTER AND NEW NON-BEARING PARTITION, NEW FLOOR TILE AND NEW PAINT, NEW FRONT AWNING AS PER PLAN. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01363808-P2
06/08/2026
Permit issued — General Construction
B01411535-I1-GC
06/03/2026
Filed — Alteration
INSTALL NEW AWNING WITH CANVAS COVER AT STOREFRONT READING "ENG PRIMARY CARE PLLC" AS PER PLAN. NO CHANGE IN USE, EGRESS,AND OCCUPANCY.
B01411535-I1
06/03/2026
Special inspection requirement — Tenant Protection Plan Compliance
FARHAD BASSIRI-TEHRANI
06/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Pablo Ayala
05/20/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/12/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/23/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/23/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/21/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/20/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/15/2026
Filed — Alteration
JOB FILED INTERIOR RENOVATION OF COMMERCIAL SPACE INCLUDING NEW COUNTER AND NEW NON-BEARING PARTITION, NEW FLOOR TILE AND NEW PAINT, NEW FRONT AWNING AS PER PLAN. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01363808-P1
04/14/2026
Inspection — Certified StandPipe - SD - Alarm Sys 64/09 - Finish
Certified
View inspection ↗
04/14/2026
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)
Certified
View inspection ↗
03/16/2026
Permit issued — Mechanical Systems
B01363808-I1-GC-CX
03/13/2026
Permit issued — Plumbing
B01363808-S1-PL
03/13/2026
Permit issued — Construction Fence
B01363808-S2-FN
03/12/2026
Filed — Alteration
JOB FILED INTERIOR RENOVATION OF COMMERCIAL SPACE INCLUDING NEW COUNTER AND NEW NON-BEARING PARTITION, NEW FLOOR TILE AND NEW PAINT, NEW FRONT AWNING AS PER PLAN. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01363808-S2
03/05/2026
Filed — Alteration
JOB FILED INTERIOR RENOVATION OF COMMERCIAL SPACE INCLUDING NEW COUNTER AND NEW NON-BEARING PARTITION, NEW FLOOR TILE AND NEW PAINT, NEW FRONT AWNING AS PER PLAN. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01363808-I1
03/05/2026
Filed — Alteration
JOB FILED INTERIOR RENOVATION OF COMMERCIAL SPACE INCLUDING NEW COUNTER AND NEW NON-BEARING PARTITION, NEW FLOOR TILE AND NEW PAINT, NEW FRONT AWNING AS PER PLAN. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01363808-S1
02/24/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/01/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/01/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/31/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/05/2008
Violation issued (ECB, open)
Plumbing
03/27/2002
Violation issued (DOB, closed)
VW*-VIOLATION - WORK W/O PERMIT DISMISSED
02/10/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/07/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/07/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/16/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/01/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 65 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
XINCHENG REALTY1104/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/16/2026$1.7M—Private party → XINCHENG REALTY LLC$694/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AYALA ENGINEERING PC606/30/2026
FARHAD BASSIRI-TEHRANI106/03/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
YBL NY403/21/2026
CNY ENGINEERING PC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DYKER SOLUTIONS INCGeneral Contractor204/09/2026
ABDUL AZIZElectrical103/21/2026
AZIZ ABDULElectrical103/21/2026
KALE CONSTRUCTION INCGeneral Contractor107/08/2026
CROSSFIELD PLBG.&HTGPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AYALA ENGINEERING P.C.9207506/30/2026
BASSIRI8394106/03/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offKALE CONSTRUCTION INC06/08/2026
DOB NOWMechanical SystemsSigned-offDYKER SOLUTIONS03/16/2026
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG03/13/2026
DOB NOWConstruction FenceSigned-offDYKER SOLUTIONS03/13/2026
BISPLISSUEDR&M PIPING & HTG INC09/11/2014
BISBLISSUEDR&M PIPING & HTG INC09/09/2014
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
05/20/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/12/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/23/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/23/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/21/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/20/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/14/2026Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
04/14/2026Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
07/01/2026Fire-Resistant Penetrations and JointsPablo Ayalaspecial
07/01/2026Mechanical SystemsPablo Ayalaspecial
07/01/2026FinalPablo Ayalaprogress
07/01/2026Energy Code Compliance InspectionsPablo Ayalaprogress
07/01/2026Fire-Resistance Rated ConstructionPablo Ayalaprogress
07/01/2026Fenestration air leakagePablo Ayalaenergy_progress
07/01/2026Air barrier - visual inspectionPablo Ayalaenergy_progress
07/01/2026Fenestration areasPablo Ayalaenergy_progress
07/01/2026Maintenance informationPablo Ayalaenergy_progress
07/01/2026HVAC-R and service water piping design and insulationPablo Ayalaenergy_progress
07/01/2026Fenestration and door U-factor and product ratingsPablo Ayalaenergy_progress
07/01/2026HVAC-R and service water heating system controlsPablo Ayalaenergy_progress
07/01/2026HVAC-R and service water heating equipmentPablo Ayalaenergy_progress
07/01/2026Lighting controlsPablo Ayalaenergy_progress
06/03/2026Tenant Protection Plan ComplianceFARHAD BASSIRI-TEHRANIspecial
06/03/2026Fire-Resistant Penetrations and JointsPablo Ayalaspecial
▾Documents — 36 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/16/2026B01411535-I1Request digital key ↗
08/16/2026B01363808-P1Request digital key ↗
08/16/2026B01363808-S2Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
08/12/2014320936608Open ↗
▸BISWORK PERMIT APPLICATION1
09/17/2014320936608Open ↗
▸Seals & Professional Certifications15
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/16/2026B01411535-I1Open ↗
08/16/2026B01363808-P1Open ↗
08/16/2026B01363808-S1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/23/2026B01363808-I1Open ↗
08/29/2026B01363808-P2Open ↗
08/28/2026B01411535-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/23/2026B01363808-I1Open ↗
09/23/2026B01363808-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/12/2014320936608Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
08/12/2014320936608Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
08/12/2014320936608Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
08/12/2014320936608Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
08/12/2014320936608Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/16/2026B01363808-P4Open ↗
08/16/2026B01363808-S1Open ↗
08/16/2026B01363808-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/12/2014320936608Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
08/12/2014320936608Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
08/12/2014320936608Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
08/12/2014320936608Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
08/12/2014320936608Open ↗