← Back
Two stories - detached, small or mid-size
236-11 88 AVENUE
QUEENS · BIN 4166605
💬 Discuss this project
1925Year Built
2.5Stories
A1Building Class
R2AZoning
1,983 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 5,301 sf lot · 0.37 FAR built · Flood zone X
Locations of Work
ElectricalPlumbing
Roof1 filing · 4 docs
Floor 11p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR101/11/2024
ARCHITECTURAL CONCEPT408/05/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCHITECTUAL CONCEPT803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
OSIRIS CONSTRUCTION, LLCGeneral Contractor303/21/2026
ISLAND ELECTRIC CORPElectrical103/22/2026
BT'S PLUMBING AND HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281101/11/2024
ARCHITECTURAL CONCEPT3642308/05/2022
TRIANGLE INSPECTION & TES7495208/05/2022
Building Lifecycle
All (36)Filed (5)Permit Issued (3)Signed Off (3)Violation (1)Inspection (3)Objection (10)Special Inspection (11)
04/04/2024
Signed off — Alteration
Q00978458-I1
03/22/2024
Permit issued — Solar
Q00978458-I1-SL
01/11/2024
Filed — Alteration
Q00978458-I1
05/05/2023
Signed off — Alteration
REPLACE FIRST FLOOR PLUMBING AND GAS FIXTURES AND INSTALL FULL BATHROOM AT FIRST FLOOR.
Q00505906-I1
05/05/2023
Signed off — Alteration
Construction of new fence as per drawing.
Q00505912-I1
08/16/2022
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
08/16/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
MUZAFFAR JAMAL
08/16/2022
Special inspection requirement — Energy Code Compliance Inspections
MUZAFFAR JAMAL
08/16/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
MUZAFFAR JAMAL
08/05/2022
Filed — Alteration
REPLACE FIRST FLOOR PLUMBING AND GAS FIXTURES AND INSTALL FULL BATHROOM AT FIRST FLOOR.
Q00505906-P2
08/05/2022
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
08/05/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
MUZAFFAR JAMAL
08/05/2022
Special inspection requirement — Energy Code Compliance Inspections
MUZAFFAR JAMAL
08/05/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
MUZAFFAR JAMAL
08/01/2022
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
08/01/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/25/2022
Objection resolved — Addressed
07/18/2022
Objection raised — Scope
07/11/2022
Filed — Alteration
REPLACE FIRST FLOOR PLUMBING AND GAS FIXTURES AND INSTALL FULL BATHROOM AT FIRST FLOOR.
Q00505906-P1
06/30/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
MUZAFFAR JAMAL
06/30/2022
Special inspection requirement — Energy Code Compliance Inspections
MUZAFFAR JAMAL
06/30/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
MUZAFFAR JAMAL
05/20/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/25/2022
Permit issued — Plumbing
Q00505906-I1-PL
03/10/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/03/2021
Objection raised — Inspections
12/03/2021
Objection resolved — Addressed
12/03/2021
Objection raised — Scope
12/03/2021
Objection resolved — Addressed
12/03/2021
Objection raised — Other
12/03/2021
Objection resolved — Addressed
12/03/2021
Objection raised — Energy
12/03/2021
Objection resolved — Addressed
11/30/2021
Filed — Alteration
REPLACE FIRST FLOOR PLUMBING AND GAS FIXTURES AND INSTALL FULL BATHROOM AT FIRST FLOOR.
Q00505906-I1
08/20/2021
Permit issued — Construction Fence
Q00505912-I1-FN
08/06/2021
Filed — Alteration
Construction of new fence as per drawing.
Q00505912-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedMOMENTUM SOLAR03/22/2024
DOB NOWPlumbingSigned-offBT'S PLUMBING AND HEATING03/25/2022
DOB NOWConstruction FenceSigned-offOSIRIS CONSTRUCTION, LLC08/20/2021
BISOTISSUEDANNMARIE KHAN & ANDRE KHA04/22/2022
BISOTISSUEDOSIRIS CONSTRUCTION, LLC09/28/2021
2 projects · most recent 02/28/2024
General Wiring
FiledStatusContractorScope
02/28/2024CompleteISLAND ELECTRIC CORP—
08/12/2022CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
08/01/2022Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
08/01/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/20/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
08/16/2022Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
08/16/2022Fire-Resistant Penetrations and JointsMUZAFFAR JAMALspecial
08/16/2022Energy Code Compliance InspectionsMUZAFFAR JAMALprogress
08/16/2022HVAC-R and service water piping design and insulationMUZAFFAR JAMALenergy_progress
08/05/2022Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
08/05/2022Fire-Resistant Penetrations and JointsMUZAFFAR JAMALspecial
08/05/2022Energy Code Compliance InspectionsMUZAFFAR JAMALprogress
08/05/2022HVAC-R and service water piping design and insulationMUZAFFAR JAMALenergy_progress
06/30/2022Fire-Resistant Penetrations and JointsMUZAFFAR JAMALspecial
06/30/2022Energy Code Compliance InspectionsMUZAFFAR JAMALprogress
06/30/2022HVAC-R and service water piping design and insulationMUZAFFAR JAMALenergy_progress
▾Documents — 73 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/27/2026Q00505912-I1Request digital key ↗
08/27/2026Q00505906-P2Request digital key ↗
08/23/2026Q00978458-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION3
09/14/2022440629777Open ↗
05/10/2021440629777Open ↗
05/05/2021440629777Open ↗
▸BISWORK PERMIT APPLICATION2
06/10/2022440629777Open ↗
09/28/2021440629777Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISZONING DIAGRAM1
05/05/2021440629777Open ↗
▸Seals & Professional Certifications16
▸DOB NOWProgress Inspector Seal & Signature6
08/29/2026Q00505906-I1Open ↗
08/29/2026Q00505906-I1Open ↗
08/24/2026Q00505906-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/23/2026Q00978458-I1Open ↗
08/13/2026Q00505906-I1Open ↗
08/13/2026Q00505906-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/29/2026Q00505906-I1Open ↗
08/29/2026Q00505906-I1Open ↗
08/24/2026Q00505906-P1Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
10/07/2020440629777Open ↗
▸Trade Schedules & Equipment2
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
03/22/2023440629777Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
03/22/2023440629777Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREES SITE PLAN1
05/05/2023440629777Open ↗
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING1
03/22/2023440629777Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
09/17/2021440629777Open ↗
▸BISSTREET TREE SIGNOFF1
05/05/2023440629777Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/23/2026Q00978458-I1Open ↗
08/13/2026Q00505906-P1Open ↗
08/13/2026Q00505906-P2Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance11
▸BISAIR SEALING AND INSULATION - VISUAL1
03/22/2023440629777Open ↗
▸BISINTERIOR LIGHTING POWER1
03/22/2023440629777Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
03/22/2023440629777Open ↗
▸BISFENESTRATION AREAS1
03/22/2023440629777Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
09/20/2021440629777Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
03/22/2023440629777Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
03/22/2023440629777Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/22/2023440629777Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
04/06/2023440629777Open ↗
▸BISFENESTRATION AIR LEAKAGE1
03/22/2023440629777Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00505906-I1Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY4
09/15/2021440629777Open ↗
05/03/2021440629777Open ↗
05/03/2021440629777Open ↗
Showing 3 of 4 on file for this type
▸BISCONCRETE - CAST-IN-PLACE1
04/06/2023440629777Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
03/22/2023440629777Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
03/22/2023440629777Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
03/22/2023440629777Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
03/22/2023440629777Open ↗
▸BISMASONRY1
04/06/2023440629777Open ↗
▸BISSOIL REPORT1
05/03/2021440629777Open ↗
▸BISFRAME (2008)/STRUCTURAL WOOD FRAME (2014) INSPECTION1
03/22/2023440629777Open ↗
▸Approvals, Objections & Sign-offs4
▸BISLETTERS - SUPPORTING DOCUMENTATION2
09/17/2021440629777Open ↗
05/03/2021440629777Open ↗
▸BISSUPERSEDING LETTER1
06/10/2022440629777Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q00978458-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT (FINAL): PW31
05/05/2023440629777Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION2
11/10/2022440629777Open ↗
09/17/2021440629777Open ↗
▸BISBOROUGH INTAKE FORM1
05/20/2022440629777Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/07/2020440629777Open ↗
▸Other Documents4
▸BISSHUTOFF DAMPERS1
03/22/2023440629777Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
10/07/2020440629777Open ↗
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION1
03/22/2023440629777Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
03/22/2023440629777Open ↗