← Back
BuildNYC
Condo, retail space
236 BUTLER STREET
BROOKLYN · BIN 3006603
💬 Discuss this project
1931Year Built
4Stories
RKBuilding Class
M1-4/R7XZoning
46,545 sfGross Floor Area
4Units
LL97 Covered3 Active Violations 7 likely answered 2 old, status unconfirmed ▸
Condo, retail space · Owner of record: 233 Nevins Street · 14,000 sf lot · 3.32 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Roofunion MarketUnder Construction97p · 7 filings · 20 docs
Floor 4Mike Wolfert the Cliffs97p · 6 filings · 20 docs
Floor 3Mike Wolfert the Cliffs100p · 7 filings · 20 docs
Floor 2Mike Wolfert the Cliffs99p · 6 filings · 20 docs
Floor 1union Market, Butler Street Cafe159p · 15 filings · 20 docs
CellarButler Street Cafe97p · 8 filings · 20 docs
Site & exteriorGold Hat International LLC33p · 6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
233 Nevins3203/22/2026
239 Nevins Street203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Skyline Rigging106/02/2026
Anz Consulting Engineering701/20/2026
EP Engineering2503/17/2025
RSVP Architecture Studio703/06/2025
Zenith Home Inspections308/15/2024
Hustvedt Cutler Architects503/06/2023
Jag Engineering211/12/2021
Richard Wainer Architect311/09/2021
Asif Jamil, RA401/21/2020
Joel Phagoo P.E103/26/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
D R Brown603/21/2026
JM Zoning2003/21/2026
Anzalone Architecture1403/21/2026
Clarke Construction Consultants2003/21/2026
Green Studio803/21/2026
Joel Phagoo P.E103/21/2026
Hustvedt Cutler Architects403/21/2026
JP Expedite603/21/2026
Joel Phagoo P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Rock Group NYScaffold707/08/2026
M&D Fire SprinklerFire Protection707/08/2026
Mmi Plumbing & HeatingPlumbing507/08/2026
Park East ConstructionGeneral Contractor403/22/2026
Wesbuilt Construction ManGeneral Contractor403/21/2026
Comalla ConstructionGeneral Contractor407/08/2026
N.Y. Sign ArtSign hanger307/08/2026
Spectrum on Broadway-ElectricElectrical303/22/2026
Vallesigns & AwningsSign hanger307/08/2026
Alltype Fire ProtectPlumbing203/22/2026
Pipe Solutions AdvisPlumbing206/28/2026
Dma ContractingGeneral Contractor203/21/2026
Parsons ConstructionScaffold107/08/2026
Done Right Hood & Fire SAGeneral Contractor107/08/2026
Knockout ConstructionGeneral Contractor107/08/2026
Doria ScaffoldingScaffold107/08/2026
GMC ElectricalElectrical103/22/2026
AJC Plumbing & HeatingPlumbing107/08/2026
AJC SprinklerFire Protection107/08/2026
Alltype Fire ProtectionFire Protection107/08/2026
Lloyd G Drummond Plumbing & GenPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Skyline Rigging7880106/02/2026
Anz Consulting Engineering3946701/20/2026
MT Group7982103/17/2025
EP Inspections and Commis7079702/08/2022
Delta Testing Labs687311/12/2021
Building Lifecycle
All (268)Filed (58)Permit Issued (35)Signed Off (18)Violation (35)Inspection (12)Objection (80)Special Inspection (30)
09/15/2026
Signed off — Alteration
PLUMBING WORK FILED IN CONJUNCTION WITH INTERIOR TENANT RENOVATION OF FIRST FLOOR FOR COMMISSARY KITCHEN. RELATED UNDER SLAB PIPING PREVIOUSLY FILED UNDER DOB # 321927322. GENERAL CONSTRUCTION FILED UNDER SEPARATE APPLICATION.
B00271504-I1
06/02/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLDS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION.
B01410517-I1
06/02/2026
Permit issued — Suspended Scaffold
B01410517-I1-SC
06/02/2026
Special inspection requirement — Post-installed Anchors
ZELJKO STEVANOVIC
06/02/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
ZELJKO STEVANOVIC
04/06/2026
Signed off — Alteration
B00463510-I1
03/31/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
01/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALBERT ZIRINO
01/20/2026
Filed — Alteration
PLUMBING WORK FILED IN CONJUNCTION WITH INTERIOR TENANT RENOVATION OF FIRST FLOOR FOR COMMISSARY KITCHEN. RELATED UNDER SLAB PIPING PREVIOUSLY FILED UNDER DOB # 321927322. GENERAL CONSTRUCTION FILED UNDER SEPARATE APPLICATION.
B00271504-P3
01/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALBERT ZIRINO
01/02/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/10/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/19/2025
Permit issued — Plumbing
B00271504-I1-PL
11/18/2025
Signed off — Alteration
MODIFICATION TO EXISTING SPRINKLER SYSTEM FILED IN CONJUNCTION WITH INTERIOR TENANT RENOVATION OF FIRST FLOOR FOR COMMISSARY KITCHEN, ALT-II # 340736617.
B00323425-I1
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/12/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/30/2025
Signed off — Alteration
Install HVAC equipment sand ductwork in conjunction with buildout of Eating and Drinking Establishment.
B00751190-I1
05/21/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/16/2025
Special inspection requirement — Sprinkler Systems
ALBERT ZIRINO
03/25/2025
Special inspection requirement — Mechanical Systems
CHRISTOPHER BEHLE
03/25/2025
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTOPHER BEHLE
03/25/2025
Special inspection requirement — Final
MICHAEL KALINOWSKI
03/25/2025
Special inspection requirement — Shutoff dampers
CHRISTOPHER BEHLE
03/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTOPHER BEHLE
03/25/2025
Special inspection requirement — Maintenance information
CHRISTOPHER BEHLE
03/25/2025
Special inspection requirement — Post-installed Anchors
CHRISTOPHER BEHLE
03/25/2025
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTOPHER BEHLE
03/25/2025
Special inspection requirement — Duct leakage testing, insulation and design
CHRISTOPHER BEHLE
03/17/2025
Filed — Alteration
Install HVAC equipment sand ductwork in conjunction with buildout of Eating and Drinking Establishment.
B00751190-P2
03/14/2025
Special inspection requirement — Shutoff dampers
CHRISTOPHER BEHLE
03/14/2025
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTOPHER BEHLE
03/14/2025
Special inspection requirement — Final
MICHAEL KALINOWSKI
03/14/2025
Special inspection requirement — Mechanical Systems
CHRISTOPHER BEHLE
03/14/2025
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTOPHER BEHLE
03/14/2025
Special inspection requirement — Maintenance information
CHRISTOPHER BEHLE
03/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTOPHER BEHLE
03/14/2025
Special inspection requirement — Duct leakage testing, insulation and design
CHRISTOPHER BEHLE
03/14/2025
Special inspection requirement — Post-installed Anchors
CHRISTOPHER BEHLE
03/13/2025
Special inspection requirement — Public Assembly Emergency Lighting
RICHARD GREENWALD
03/13/2025
Special inspection requirement — Public Assembly Emergency Lighting
RICHARD GREENWALD
03/06/2025
Filed — No Work
B00349973-P2
03/06/2025
Filed — No Work
B00349965-P1
03/06/2025
Filed — No Work
B00349681-P1
02/25/2025
Filed — Alteration
Install HVAC equipment sand ductwork in conjunction with buildout of Eating and Drinking Establishment.
B00751190-P1
02/21/2025
Signed off — Alteration
Build out eating and drinking establishment at part of first floor and cellar
B00699431-I1
02/21/2025
Signed off — Alteration
Plumbing work in conjunction with build-out of Eating and Drinking Establishment
B00763755-I1
02/20/2025
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTOPHER BEHLE
02/20/2025
Special inspection requirement — Shutoff dampers
CHRISTOPHER BEHLE
02/20/2025
Special inspection requirement — Final
MICHAEL KALINOWSKI
02/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTOPHER BEHLE
02/20/2025
Special inspection requirement — Mechanical Systems
CHRISTOPHER BEHLE
02/12/2025
Filed — Alteration
MODIFICATION TO EXISTING SPRINKLER SYSTEM FILED IN CONJUNCTION WITH INTERIOR TENANT RENOVATION OF FIRST FLOOR FOR COMMISSARY KITCHEN, ALT-II # 340736617.
B00323425-P2
02/10/2025
Signed off — Alteration
Sprinkler work in conjunction with build-out of Eating and Drinking Establishment
B08001613-I1
01/22/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/21/2025
Permit issued — Sprinklers
B00323425-I1-EW-SP
11/07/2024
Signed off — Alteration
REPLACE ILLUMINATED ACCESSORY BUSINESS D/F BLADE WALL SIGN-B, REMOVE A PREVIOUS SIGN# B00609711-I1, NO CHANGE TO USE, EGRESS OR OCCUPATION
B01090441-I1
11/07/2024
Signed off — Alteration
REPLACE ILLUMINATED ACCESSORY BUSINESS D/F BLADE WALL SIGN-B, REMOVE A PREVIOUS SIGN# B00609711-I1, NO CHANGE TO USE, EGRESS OR OCCUPATION
B01090441-S2
11/07/2024
Signed off — Alteration
REPLACE ILLUMINATED ACCESSORY BUSINESS D/F BLADE WALL SIGN-B, REMOVE A PREVIOUS SIGN# B00609711-I1, NO CHANGE TO USE, EGRESS OR OCCUPATION
B01090441-S1
10/01/2024
Violation issued (ECB, closed)
Construction
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 268 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedDoria Scaffolding06/02/2026
DOB NOWPlumbingSigned-offPipe Solutions Advis11/19/2025
DOB NOWSprinklersSigned-offAlltype Fire Protection01/21/2025
DOB NOWSignSigned-offVallesigns & Awnings08/15/2024
DOB NOWSignSigned-offVallesigns & Awnings08/15/2024
DOB NOWSignSigned-offVallesigns & Awnings08/15/2024
DOB NOWPlumbingSigned-offLloyd G Drummond Plumbing & Gen06/16/2023
DOB NOWMechanical SystemsPermit IssuedKnockout Construction06/09/2023
DOB NOWSprinklersSigned-offAJC Sprinkler12/02/2022
DOB NOWGeneral ConstructionSigned-offDma Contracting10/17/2022
DOB NOWMechanical SystemsSigned-offDone Right Hood & Fire SA08/17/2022
DOB NOWPlumbingSigned-offAJC Plumbing & Heating08/16/2022
DOB NOWPlumbingSigned-offMichael Itskovich01/27/2022
DOB NOWStructuralSigned-offWesbuilt Construction Man11/23/2021
DOB NOWSignSigned-offSkanska Building11/12/2021
DOB NOWSignSigned-offSkanska Building11/12/2021
DOB NOWSignSigned-offSkanska Building11/12/2021
DOB NOWSprinklersSigned-offM&D Fire Sprinkler09/21/2021
DOB NOWStandpipeSigned-offM&D Fire Sprinkler08/06/2021
DOB NOWPlumbingSigned-offMichael Itskovich07/22/2021
DOB NOWCurb CutSigned-offComalla Construction06/29/2021
DOB NOWMechanical SystemsSigned-offWesbuilt Construction Man06/16/2021
DOB NOWSprinklersSigned-offM&D Fire Sprinkler06/15/2021
DOB NOWSprinklersSigned-offM&D Fire Sprinkler06/14/2021
DOB NOWStandpipeSigned-offM&D Fire Sprinkler06/14/2021
DOB NOWSidewalk ShedSigned-offRock Group NY09/29/2020
DOB NOWStandpipeSigned-offM&D Fire Sprinkler06/11/2020
DOB NOWPlumbingSigned-offMichael Itskovich06/11/2020
DOB NOWSprinklersSigned-offM&D Fire Sprinkler06/11/2020
DOB NOWMechanical SystemsPermit IssuedComalla Construction06/10/2020
DOB NOWPlumbingSigned-offMichael Itskovich05/21/2020
DOB NOWPlumbingSigned-offMichael Itskovich01/03/2020
DOB NOWSidewalk ShedSigned-offRock Group NY10/11/2019
DOB NOWSidewalk ShedSigned-offRock Group NY03/29/2019
DOB NOWSupported ScaffoldPermit IssuedParsons Construction03/27/2019
BISOTISSUEDKnockout Construction06/22/2023
BIS—ISSUEDPark East Construction12/27/2021
BISOTISSUEDWesbuilt Construction Man03/18/2021
BISOTISSUEDWesbuilt Construction Man01/14/2021
BIS—ISSUEDComalla Construction01/08/2021
+ 19 more permits on file
1 project · most recent 02/08/2022
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/08/2022Permit IssuedComalla ConstructionAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Daikin MPS035F 35 tons · Rooftop Unit ×3
MPS020G 20 tons ×1
MPS030F 30 tons ×1
Heating
— F3FUH07C03 25,600 BTU · Unit Heater ×45
ACBH0581CT 17,000 BTU · Unit Heater ×16
Ventilation
— BSQ-160-160-30 4,950 CFM · Exhaust Fan ×1
Greenheck G-123-VG 1,050 CFM · Exhaust Fan ×1
1 project · most recent 06/14/2022
FiledStatusContractorScope
06/14/2022———
2 projects · most recent 01/20/2026
Gas Water/Sanitary
FiledStatusContractorScope
01/20/2026Signed-offPipe Solutions AdvisGas, Water/Sanitary
06/14/2022——Gas, Water/Sanitary
10 projects · most recent 12/05/2025
General Wiring Lighting
FiledStatusContractorScope
12/05/2025Permit IssuedMetropolis Electric1 meters, 1 new_meters
11/15/2024CompleteSpectrum on Broadway-Electric—
05/18/2023Permit IssuedWelsbach Electric—
05/18/2023Permit IssuedWelsbach Electric—
04/08/2022CompleteDifalzo Electric NYGeneral Wiring
01/22/2021CompleteNewbridge Electl Contng—
01/11/2021CompleteGMC ElectricalGeneral Wiring, Lighting
11/16/2020CompleteGMC Electrical—
09/24/2019CompleteMetropolis ElectricGeneral Wiring
03/12/2019CompleteTop Shelf Electric—
1 project · most recent 06/02/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
06/02/2026Permit IssuedDoria ScaffoldingSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
03/31/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
01/02/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/12/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/21/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/20/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/07/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/10/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/16/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/23/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/13/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/23/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 135
DateRequirementInspectorRole
06/02/2026Structural Stability – Alterations of existing buildingsZELJKO STEVANOVICspecial
06/02/2026Post-installed AnchorsZELJKO STEVANOVICspecial
01/29/2026Fire-Resistant Penetrations and JointsALBERT ZIRINOspecial
01/05/2026Fire-Resistant Penetrations and JointsALBERT ZIRINOspecial
05/16/2025Sprinkler SystemsALBERT ZIRINOspecial
03/25/2025FinalMICHAEL KALINOWSKIprogress
03/25/2025Maintenance informationCHRISTOPHER BEHLEenergy_progress
03/25/2025HVAC-R and service water heating equipmentCHRISTOPHER BEHLEenergy_progress
03/25/2025Duct leakage testing, insulation and designCHRISTOPHER BEHLEenergy_progress
03/25/2025HVAC-R and service water heating system controlsCHRISTOPHER BEHLEenergy_progress
03/25/2025Shutoff dampersCHRISTOPHER BEHLEenergy_progress
03/25/2025Post-installed AnchorsCHRISTOPHER BEHLEspecial
03/25/2025Mechanical SystemsCHRISTOPHER BEHLEspecial
03/25/2025Fire-Resistant Penetrations and JointsCHRISTOPHER BEHLEspecial
03/14/2025FinalMICHAEL KALINOWSKIprogress
03/14/2025Mechanical SystemsCHRISTOPHER BEHLEspecial
03/14/2025Post-installed AnchorsCHRISTOPHER BEHLEspecial
03/14/2025Duct leakage testing, insulation and designCHRISTOPHER BEHLEenergy_progress
03/14/2025Shutoff dampersCHRISTOPHER BEHLEenergy_progress
03/14/2025HVAC-R and service water heating equipmentCHRISTOPHER BEHLEenergy_progress
03/14/2025HVAC-R and service water heating system controlsCHRISTOPHER BEHLEenergy_progress
03/14/2025Maintenance informationCHRISTOPHER BEHLEenergy_progress
03/14/2025Fire-Resistant Penetrations and JointsCHRISTOPHER BEHLEspecial
03/13/2025Public Assembly Emergency LightingRICHARD GREENWALDprogress
03/13/2025Public Assembly Emergency LightingRICHARD GREENWALDprogress
Latest 25 of 135.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Butler Street CafeRestaurant / Food ServiceCellar, Floor 1
Project B08001613 Alteration · LOC Issued · 09/23/2022
Project B00751190 Alteration · LOC Issued · 06/14/2022
Project B00751203 Alteration · Incomplete · 06/14/2022
Project B00699431 Alteration · LOC Issued · 05/23/2022
Mike Wolfert the CliffsFitness / RecreationFloors 2–4
Project B00450741 Alteration · LOC Issued · 02/26/2021
union MarketRetailFloor 1, Roof
Project B00323425 Alteration · LOC Issued · 07/20/2020
Project B00224591 Alteration · Permit Entire · 07/19/2020
Project B00271504 Alteration · LOC Issued · 07/19/2020
Project B00356555 Alteration · Approved · 07/19/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 548 on file (BIS + DOB NOW)
▸Plans & Drawings65
▸DOB NOWPlans/Sketch19
08/31/2026B00609686-I1Request digital key ↗
08/31/2026B00609711-I1Request digital key ↗
08/31/2026B00609696-I1Request digital key ↗
Showing 3 of 19 on file for this type
▸DOB NOWPlans/Sketch - Plumbing13
09/02/2026B00225370-P2Request digital key ↗
09/02/2026B00225370-I1Request digital key ↗
09/02/2026B00255756-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly9
09/02/2026B00349681-P1Request digital key ↗
09/02/2026B00349965-P1Request digital key ↗
09/02/2026B00349973-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems7
09/02/2026B00224591-I1Request digital key ↗
09/01/2026B00460473-I1Request digital key ↗
08/31/2026B00218816-P2Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler5
09/02/2026B00225370-I1Request digital key ↗
08/22/2026B00323425-I1Request digital key ↗
08/15/2026B00323425-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed4
09/02/2026B00140817-I1Request digital key ↗
08/15/2026B00140817-P3Request digital key ↗
08/15/2026B00140817-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Standpipe3
09/02/2026B00225370-I1Request digital key ↗
08/15/2026B00225370-P2Request digital key ↗
08/15/2026B00225370-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
09/01/2026B00450741-I1Request digital key ↗
08/15/2026B00450741-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment1
09/02/2026B00356555-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
09/01/2026B00463510-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/02/2026B00146679-I1Request digital key ↗
▸Applications & Permits75
▸BISPLAN / WORK APPROVAL APPLICATION45
12/05/2025321927322Open ↗
11/26/2025340736617Open ↗
02/21/2025321773121Open ↗
Showing 3 of 45 on file for this type
▸BISWORK PERMIT APPLICATION18
06/28/2023340736617Open ↗
01/03/2022321773121Open ↗
12/16/2021321773121Open ↗
Showing 3 of 18 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION9
05/20/2022322162896Open ↗
03/05/2021340804160Open ↗
03/05/2021340804160Open ↗
Showing 3 of 9 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
03/08/2021340804160Open ↗
02/08/2021340804160Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
07/29/2021321773121Open ↗
▸Zoning, Tax Lot & Property Records9
▸BISZONING APPEAL2
04/11/2019321773121Open ↗
04/11/2019321773121Open ↗
▸BISZONING DIAGRAM2
12/04/2020321773121Open ↗
06/10/2019321773121Open ↗
▸BISFLOOD ZONE DESIGN CERTIFICATION1
07/14/2020340736617Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
09/01/2020321773121Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISZONING EXHIBIT II: CERTIFICATION1
09/01/2020321773121Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
05/19/2022322162896Open ↗
▸Seals & Professional Certifications193
▸DOB NOWProgress Inspector Seal & Signature60
10/02/2026B00349973-I1Open ↗
09/02/2026B00224591-I1Open ↗
09/02/2026B00224591-I1Open ↗
Showing 3 of 60 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature59
09/02/2026B00146679-I1Open ↗
09/02/2026B00140817-I1Open ↗
09/02/2026B00140817-P3Open ↗
Showing 3 of 59 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature45
10/02/2026B08001613-I1Open ↗
09/17/2026B00271504-P2Open ↗
09/02/2026B00224591-I1Open ↗
Showing 3 of 45 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION15
12/13/2019321798854Open ↗
12/04/2019321798854Open ↗
12/04/2019321798854Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
02/07/2021340804160Open ↗
07/14/2020340736617Open ↗
Showing 2 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
02/07/2021340804160Open ↗
06/30/2020340736617Open ↗
01/03/2020340709095Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
03/15/2019321927322Open ↗
Showing 1 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
03/15/2019321927322Open ↗
Showing 1 of 2 on file for this type
▸Trade Schedules & Equipment6
▸BISSCHEDULE B - PLUMBING2
02/24/2020340598507Open ↗
Showing 1 of 2 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
03/16/2020340598507Open ↗
03/15/2019321927322Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
05/23/2022321773121Open ↗
▸Safety & Tenant Protection9
▸BISSTREET TREE CHECKLIST3
05/18/2021321773121Open ↗
03/05/2021340804160Open ↗
Showing 2 of 3 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
12/17/2018321773121Open ↗
Showing 1 of 2 on file for this type
▸BISTenant Protection Plan and Notes1
03/18/2019321927322Open ↗
▸BISSTREET TREES SITE PLAN1
05/18/2021321773121Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
12/17/2018321773121Open ↗
▸BISBPP: STREET TREES SITE PLAN1
03/05/2021340804160Open ↗
▸Environmental & Asbestos38
▸DOB NOWDEP ACP-5: Asbestos Assessment Report25
09/02/2026B00146679-I1Open ↗
09/01/2026B00460473-I1Open ↗
08/28/2026B08001613-P1Open ↗
Showing 3 of 25 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
06/30/2020340736617Open ↗
04/11/2019321773121Open ↗
03/18/2019321927322Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
01/14/2021340709095Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
07/19/2022321773121Open ↗
▸Energy Compliance26
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY8
02/22/2022321773121Open ↗
08/27/2021321773121Open ↗
08/17/2021321773121Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
03/18/2019321927322Open ↗
12/17/2018321773121Open ↗
Showing 2 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
11/23/2021321798854Open ↗
10/19/2021340709095Open ↗
05/28/2021340598507Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
07/14/2020340736617Open ↗
Showing 1 of 3 on file for this type
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
01/07/2021340709095Open ↗
▸Inspections & Test Reports30
▸BISTECHNICAL REPORT: RESPONSIBILITY23
02/23/2022321798854Open ↗
02/22/2022321773121Open ↗
11/23/2021321773121Open ↗
Showing 3 of 23 on file for this type
▸BISSOIL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPOST-INSTALLED ANCHORS1
02/22/2022321773121Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPILING (TR-5) 27-7211
12/04/2019321798854Open ↗
▸Approvals, Objections & Sign-offs27
▸BISSCHEDULE A - OCCUPANCY / USE12
10/11/2022321773121Open ↗
09/27/2022321773121Open ↗
09/13/2022321773121Open ↗
Showing 3 of 12 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
07/14/2020340736617Open ↗
07/14/2020340736617Open ↗
07/09/2020340736617Open ↗
Showing 3 of 6 on file for this type
▸BISSUPERSEDING LETTER5
01/03/2022321773121Open ↗
12/16/2021321773121Open ↗
01/12/2021321773121Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
10/21/2021340709095Open ↗
05/28/2021340598507Open ↗
Showing 2 of 3 on file for this type
▸BISFINAL1
01/07/2021340709095Open ↗
▸Cost, Insurance & Ownership17
▸BISCOST AFFIDAVIT12
02/23/2022321798854Open ↗
05/28/2021340598507Open ↗
11/10/2020321798854Open ↗
Showing 3 of 12 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE3
01/03/2022321773121Open ↗
03/30/2021321773121Open ↗
01/12/2021321773121Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
10/19/2021340709095Open ↗
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
02/09/2021340709095Open ↗
▸Filing & Intake Forms34
▸BISADDITIONAL INFORMATION25
02/27/2025321773121Open ↗
11/30/2022321773121Open ↗
05/20/2022322162896Open ↗
Showing 3 of 25 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
02/07/2021340804160Open ↗
07/14/2020340736617Open ↗
01/03/2020340709095Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET4
04/01/2022322162896Open ↗
06/17/2019321967109Open ↗
03/15/2019321927322Open ↗
Showing 3 of 4 on file for this type
▸Other Documents19
▸DOB NOWLowest Floor Elevation Plan3
09/02/2026B00225370-I1Open ↗
09/02/2026B00255756-I1Open ↗
08/31/2026B00218816-I1Open ↗
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFEMA ELEVATION CERT (086-0-33)/ FLOODPROOFING CERT (086-0-34)2
03/11/2022321773121Open ↗
03/18/2019321927322Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
04/01/2022322162896Open ↗
01/07/2021340709095Open ↗
▸BISSUBSTANTIAL IMPROVEMENT CALCULATIONS2
07/14/2020340736617Open ↗
Showing 1 of 2 on file for this type
▸BISPLOT DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAdditional Documents (Photos)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBSA VARIANCE1
08/05/2020321773121Open ↗
▸DOB NOWCalculations1
08/16/2026B01410517-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/16/2026B01410517-I1Open ↗