Roof101p · 3 filings · 20 docs
ArchitectureDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Antenna
Decommission of existing Sprint/Clearwire site. Remove antennas and equipment from the roof and equipment room in the basement. Initial installation approved under applications # 300981542 and 310061544. No change in use, egress, or occupancy.
On file for this project
4 documents
Replacement of existing telecommunications antennas and RRH units on roof. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.
On file for this project
7 documents · 1 drawing sheet
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 100 drawing sheets
Bulkhead13p · 1 filing · 12 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 13 drawing sheets
Penthouse3p · 1 filing · 12 docs
Fire ProtectionPlumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 3 drawing sheets
Floor 811p · 1 filing · 12 docs
Fire Protection
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 1 drawing sheet
Floor 80
Floor 79
Floor 78
Floor 77
Floor 76
Floor 75
Floor 74
Floor 73
Floor 72
Floor 71
Floor 70
Floor 69
Floor 681p · 1 filing · 12 docs
Plumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 1 drawing sheet
Floor 671p · 1 filing · 12 docs
Plumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 1 drawing sheet
Floor 661p · 1 filing · 12 docs
Plumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 1 drawing sheet
Floor 651p · 1 filing · 12 docs
Plumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 1 drawing sheet
Floor 641p · 1 filing · 12 docs
Plumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 1 drawing sheet
Floor 631p · 1 filing · 12 docs
Plumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 1 drawing sheet
Floor 621p · 1 filing · 12 docs
Plumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 1 drawing sheet
Floor 611p · 1 filing · 12 docs
Plumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 1 drawing sheet
Floor 601p · 1 filing · 12 docs
Plumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 1 drawing sheet
Floor 591p · 1 filing · 12 docs
Plumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 1 drawing sheet
Floor 581p · 1 filing · 12 docs
Plumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 1 drawing sheet
Floor 571p · 1 filing · 12 docs
Plumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 1 drawing sheet
Floor 561p · 1 filing · 12 docs
Plumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 1 drawing sheet
Floor 551p · 1 filing · 12 docs
Plumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 1 drawing sheet
Floor 541p · 1 filing · 12 docs
Plumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 1 drawing sheet
Floor 531p · 1 filing · 12 docs
Plumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 1 drawing sheet
Floor 521p · 1 filing · 12 docs
Plumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 1 drawing sheet
Floor 511p · 1 filing · 12 docs
Plumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 1 drawing sheet
Floor 501p · 1 filing · 12 docs
Plumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 1 drawing sheet
Floor 491p · 1 filing · 12 docs
Plumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 1 drawing sheet
Floor 483p · 1 filing · 12 docs
Fire ProtectionPlumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 3 drawing sheets
Floor 471p · 1 filing · 12 docs
Plumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 1 drawing sheet
Floor 461p · 1 filing · 12 docs
Plumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 1 drawing sheet
Floor 451p · 1 filing · 12 docs
Plumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 1 drawing sheet
Floor 441p · 1 filing · 12 docs
Plumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 1 drawing sheet
Floor 431p · 1 filing · 12 docs
Plumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 1 drawing sheet
Floor 421p · 1 filing · 12 docs
Plumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 1 drawing sheet
Floor 411p · 1 filing · 12 docs
Plumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 1 drawing sheet
Floor 401p · 1 filing · 12 docs
Plumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 1 drawing sheet
Floor 393p · 1 filing · 12 docs
DMPlumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 3 drawing sheets
Floor 381p · 1 filing · 12 docs
Plumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 1 drawing sheet
Floor 373p · 1 filing · 12 docs
MechanicalPlumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 3 drawing sheets
Floor 364p · 1 filing · 12 docs
MechanicalPlumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 4 drawing sheets
Floor 351p · 1 filing · 12 docs
Plumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 1 drawing sheet
Floor 341p · 1 filing · 12 docs
Plumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 1 drawing sheet
Floor 331p · 1 filing · 12 docs
Plumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 1 drawing sheet
Floor 321p · 1 filing · 12 docs
Plumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 1 drawing sheet
Floor 311p · 1 filing · 12 docs
Plumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 1 drawing sheet
Floor 302p · 1 filing · 12 docs
MechanicalPlumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 2 drawing sheets
Floor 293p · 1 filing · 12 docs
Fire ProtectionMechanicalPlumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 3 drawing sheets
Floor 283p · 1 filing · 12 docs
ArchitectureMechanicalPlumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 3 drawing sheets
Floor 273p · 1 filing · 12 docs
ArchitectureMechanicalPlumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 3 drawing sheets
Floor 264p · 1 filing · 12 docs
ArchitectureMechanicalPlumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 4 drawing sheets
Floor 254p · 1 filing · 12 docs
ArchitectureMechanicalPlumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 4 drawing sheets
Floor 244p · 1 filing · 12 docs
ArchitectureMechanicalPlumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 4 drawing sheets
Floor 235p · 1 filing · 12 docs
ArchitectureMechanicalPlumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 5 drawing sheets
Floor 223p · 1 filing · 12 docs
ArchitectureMechanicalPlumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 3 drawing sheets
Floor 213p · 1 filing · 12 docs
ArchitecturePlumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 3 drawing sheets
Floor 203p · 1 filing · 12 docs
ArchitecturePlumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 3 drawing sheets
Floor 194p · 1 filing · 12 docs
ArchitecturePlumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 4 drawing sheets
Floor 185p · 1 filing · 12 docs
ArchitectureGeneralPlumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 5 drawing sheets
Floor 175p · 1 filing · 12 docs
ArchitectureMechanicalPlumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 5 drawing sheets
Floor 164p · 1 filing · 12 docs
ArchitectureMechanicalPlumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 4 drawing sheets
Floor 155p · 1 filing · 12 docs
ArchitectureMechanicalPlumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 5 drawing sheets
Floor 144p · 1 filing · 12 docs
ArchitectureFire ProtectionMechanicalPlumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 4 drawing sheets
Floor 134p · 1 filing · 12 docs
ArchitectureMechanicalPlumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 4 drawing sheets
Floor 125p · 1 filing · 12 docs
ArchitectureMechanicalPlumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 5 drawing sheets
Floor 114p · 1 filing · 12 docs
ArchitectureMechanicalPlumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 4 drawing sheets
Floor 106p · 1 filing · 12 docs
ArchitectureFire ProtectionMechanicalPlumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 6 drawing sheets
Floor 94p · 1 filing · 12 docs
ArchitectureMechanicalPlumbing
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 4 drawing sheets
Floor 812p · 1 filing · 12 docs
ArchitectureMechanicalPlumbingStructural
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 12 drawing sheets
Floor 713p · 1 filing · 12 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 13 drawing sheets
Floor 617p · 1 filing · 12 docs
ArchitectureFire ProtectionMechanicalPlumbingStructuralZ
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 17 drawing sheets
Floor 519p · 1 filing · 12 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbingStructural
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 19 drawing sheets
Floor 420p · 1 filing · 12 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 20 drawing sheets
Floor 342p · 2 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Seven (7) existing gas fired unit heaters on third (3) floor connected to existing gas service, existing OSP gas meter on ground outside building with existing gas riser from outside space to third (3) floor and new gas piping on 3rd floor. Exsiting Gas equipment: seven (7) Modine HD 125 unit heaters MEA# 25-99E with rated input of 125,000 BTUH each. Gas Meter: 1 existing meter OSP Gas Riser - 1 riser OSP to third (3) floor. Gas usage: Heating
On file for this project
20 documents · 3 drawing sheets
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 39 drawing sheets
Floor 267p · 1 filing · 12 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructuralOther
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 67 drawing sheets
Floor 188p · 2 filings · 20 docs
ArchitectureDMEquipmentFire ProtectionGeneralMechanicalPlumbingStructuralOtherZ
Issued Permit Scope
Plumbing
Gas piping and installation of three pieces of gas fired equipment
On file for this project
9 documents
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 78 drawing sheets
Mezzanine12p · 1 filing · 12 docs
ArchitecturePlumbingStructural
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 12 drawing sheets
Cellar109p · 1 filing · 12 docs
ArchitectureDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 109 drawing sheets
Sub-Cellar5p · 1 filing · 12 docs
ArchitectureFire ProtectionGeneralPlumbingStructural
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 5 drawing sheets
Basement30p · 1 filing · 12 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Installation of ten (10) gas fired unit heaters on sixth (6) floor connected to existing service and gas piping with new gas meter on ground outside of building with existing gas riser from outside space to sixth floor. Fixtures: 1- new gas meter; 10 - gas furnaces on sixth (6th) floor. Gas equipment installed: ten (10) Modine HD125 unit heaters MEA# 25-99E Rated input of 125,000 BTUH. Gas Riser - 1 Riser OSP to 6th Floor. Gas Usage - Heat
On file for this project
12 documents · 30 drawing sheets
Sub-Basement1p · 1 filing · 4 docs
Electrical
Issued Permit Scope
Antenna
Decommission of existing Sprint/Clearwire site. Remove antennas and equipment from the roof and equipment room in the basement. Initial installation approved under applications # 300981542 and 310061544. No change in use, egress, or occupancy.
On file for this project
4 documents