← Back
Two stories - detached, small or mid-size
2363 56 DRIVE
BROOKLYN · BIN 3242903
💬 Discuss this project
1970Year Built
1Stories
A1Building Class
R2Zoning
2,166 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 9,500 sf lot · 0.23 FAR built · Flood zone VE
Locations of Work
ArchitectureStructuralPlumbing
Permit Issued — active, not yet Signed-off
Floor 2Under Construction4p · 3 filings · 13 docs
Floor 1Under Construction7p · 3 filings · 13 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/10/2025$2.3M—— → —$1,053/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MEY ASSOCIATES310/01/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
M W EXPEDITING603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KMM IMPROVEMENTS CORPGeneral Contractor407/08/2026
SMART PLBG & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TRIANGLE INSPECTION & TES7495210/01/2025
Building Lifecycle
All (22)Filed (3)Permit Issued (5)Inspection (10)Special Inspection (4)
05/05/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/15/2026
Permit issued — Structural
B01294775-I1-ST
04/15/2026
Permit issued — General Construction
B01294762-I1-GC
01/30/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/23/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/23/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/30/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/23/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/23/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/23/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/25/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/25/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/06/2025
Permit issued — General Construction
B01294762-I1-GC
11/06/2025
Permit issued — Structural
B01294775-I1-ST
10/29/2025
Permit issued — Plumbing
B01294769-I1-PL
10/01/2025
Filed — Alteration
Interior and exterior renovation work being done on the first and second floors. No change in use, egress, or occupancy.
B01294762-I1
10/01/2025
Filed — Alteration
New metal deck at second floor rear yard. New window installation at the first and second floors. New canopy over the front entrance steps and platform. Proposed interior renovation at the first and second floors.
B01294775-I1
10/01/2025
Filed — Alteration
Install new plumbing fixtures on the first and second floors. No change in use, egress, or occupancy.
B01294769-I1
10/01/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Rajasekhar Sakhamuri
10/01/2025
Special inspection requirement — Structural Cold-Formed Steel
Rajasekhar Sakhamuri
10/01/2025
Special inspection requirement — Structural Steel - Details
Rajasekhar Sakhamuri
09/29/2025
Special inspection requirement — Final
Rajasekhar Sakhamuri
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedKMM IMPROVEMENTS CORP04/15/2026
DOB NOWGeneral ConstructionPermit IssuedKMM IMPROVEMENTS CORP04/15/2026
DOB NOWGeneral ConstructionPermit IssuedKMM IMPROVEMENTS CORP11/06/2025
DOB NOWStructuralPermit IssuedKMM IMPROVEMENTS CORP11/06/2025
DOB NOWPlumbingPermit IssuedSMART PLBG & HTG CORP10/29/2025
1 project · most recent 10/01/2025
Water/Sanitary
FiledStatusContractorScope
10/01/2025Permit IssuedSMART PLBG & HTG CORPWater/Sanitary
1 project · most recent 09/23/2026
General Wiring
FiledStatusContractorScope
09/23/2026Permit IssuedCMY ELECTRICAL CORPGeneral Wiring
1 project · most recent 10/01/2025
Steel Concrete
FiledStatusContractorScope
10/01/2025Permit IssuedKMM IMPROVEMENTS CORPSteel, Concrete
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
05/05/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/30/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/23/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/23/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/30/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/23/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/23/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/23/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/25/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/25/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
10/01/2025Structural Stability – Alterations of existing buildingsRajasekhar Sakhamurispecial
10/01/2025Structural Cold-Formed SteelRajasekhar Sakhamurispecial
10/01/2025Structural Steel - DetailsRajasekhar Sakhamurispecial
09/29/2025FinalRajasekhar Sakhamuriprogress
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/20/2026B01294769-I1Request digital key ↗
08/20/2026B01294775-I1Request digital key ↗
08/20/2026B01294762-I1Request digital key ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/20/2026B01294762-I1Open ↗
08/13/2026B01294775-I1Open ↗
08/13/2026B01294769-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/29/2026B01294775-I1Open ↗
08/29/2026B01294775-I1Open ↗
08/29/2026B01294775-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/29/2026B01294775-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/20/2026B01294762-I1Open ↗
08/13/2026B01294775-I1Open ↗
08/13/2026B01294769-I1Open ↗