← Back
Four families
2366 DAVIDSON AVENUE
BRONX · BIN 2014289
💬 Discuss this project
1933Year Built
2Stories
C3Building Class
R7-1Zoning
4,080 sfGross Floor Area
4Units
Rent Stabilized18 Open Violations ▸
Four families · 3,113 sf lot · 1.31 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Permit Issued — active, not yet Signed-off
Floor 2Under Construction6p · 1 filing · 20 docs
Floor 1Under Construction5p · 1 filing · 20 docs
BasementUnder Construction8p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
408 HAWTHORN1607/08/2026
OWNERS GC NY303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/19/2025$1.1M—Private party → 2366 DAVIDSON LLC$270/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LESTER KATZ, NCARB211/26/2025
CHOSEN MEP, CORP.307/08/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BUILDINGS REPRISENTATIVE LLC1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
OWNERS GC NY LLCGeneral Contractor307/08/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
PRIME PIPING & HEATING INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SHAHRISH SHUVO ENGINEERIN8524111/26/2025
HRF SERVICES CORP5616407/08/2025
Building Lifecycle
All (115)Filed (5)Permit Issued (5)Signed Off (4)Violation (60)Inspection (11)Special Inspection (30)
08/09/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/09/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/11/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/05/2026
Signed off — Alteration CO
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01222014-I1
X01222014-S2
03/24/2026
Signed off — Alteration CO
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01222014-I1
X01222014-S3
03/02/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/05/2026
Signed off — Alteration CO
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01222014-I1
X01222014-S1
02/05/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/03/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/02/2026
Signed off — Alteration CO
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01222014-I1
X01222014-S4
01/30/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/14/2026
Permit issued — Sprinklers
X01222014-S3-EW-SP
12/31/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/05/2025
Permit issued — Structural
X01222014-S4-ST
12/02/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
12/01/2025
Violation issued (ECB, closed)
Construction
11/26/2025
Filed — Alteration CO
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01222014-I1
X01222014-S4
11/26/2025
Special inspection requirement — Structural Cold-Formed Steel
Shahrish Shuvo
11/26/2025
Special inspection requirement — Structural Steel - Details
Shahrish Shuvo
11/26/2025
Special inspection requirement — Final
Shahrish Shuvo
11/26/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Shahrish Shuvo
11/25/2025
Violation issued (ECB, closed)
Construction
11/25/2025
Violation issued (ECB, closed)
Construction
11/17/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
11/17/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/07/2025
Permit issued — Plumbing
X01222014-S2-PL
10/31/2025
Permit issued — General Construction
X01222014-I1-GC
10/31/2025
Permit issued — Mechanical Systems
X01222014-S1-MS
07/16/2025
Special inspection requirement — HVAC-R and service water heating equipment
SHAHRIAR QUAYYUM
07/16/2025
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
07/16/2025
Special inspection requirement — Ventilation and air distribution system
SHAHRIAR QUAYYUM
07/16/2025
Special inspection requirement — HVAC-R and service water heating system controls
SHAHRIAR QUAYYUM
07/08/2025
Filed — Alteration CO
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01222014-I1
X01222014-S2
07/08/2025
Filed — Alteration CO
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01222014-I1
X01222014-S3
07/08/2025
Filed — Alteration CO
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01222014-I1
X01222014-S1
07/08/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
SHAHRIAR QUAYYUM
07/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
07/08/2025
Special inspection requirement — Energy Code Compliance Inspections
SHAHRIAR QUAYYUM
07/08/2025
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
07/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
07/08/2025
Special inspection requirement — Post-installed Anchors
SHAHRIAR QUAYYUM
07/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
07/08/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
SHAHRIAR QUAYYUM
07/08/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SHAHRIAR QUAYYUM
07/07/2025
Special inspection requirement — HVAC-R and service water heating system controls
SHAHRIAR QUAYYUM
07/07/2025
Special inspection requirement — HVAC-R and service water heating equipment
SHAHRIAR QUAYYUM
07/07/2025
Special inspection requirement — Sprinkler Systems
SHAHRIAR QUAYYUM
07/07/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SHAHRIAR QUAYYUM
07/03/2025
Special inspection requirement — Final
SHAHRIAR QUAYYUM
07/03/2025
Special inspection requirement — Mechanical Systems
SHAHRIAR QUAYYUM
06/05/2025
Violation issued (HPD, closed)
A
06/04/2025
Special inspection requirement — Permanent certificate
SHAHRIAR QUAYYUM
05/09/2025
Filed — Alteration CO
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01222014-I1
X01222014-I1
05/07/2025
Special inspection requirement — Metering
SHAHRIAR QUAYYUM
05/07/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
SHAHRIAR QUAYYUM
05/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
05/07/2025
Special inspection requirement — Insulation placement and R values
SHAHRIAR QUAYYUM
05/07/2025
Special inspection requirement — Energy Code Compliance Inspections
SHAHRIAR QUAYYUM
05/07/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
SHAHRIAR QUAYYUM
02/11/2025
Violation issued (HPD, closed)
B
Latest 60 of 115 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offA M B MECHANICAL INC01/14/2026
DOB NOWStructuralSigned-offOWNERS GC NY LLC12/05/2025
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN11/07/2025
DOB NOWGeneral ConstructionPermit IssuedOWNERS GC NY LLC10/31/2025
DOB NOWMechanical SystemsSigned-offOWNERS GC NY LLC10/31/2025
1 project · most recent 11/26/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
11/26/2025Signed-offOWNERS GC NY LLCHeating and Air Conditioning Systems
Heat / Cool
Daikin 2MXS18NMVJUV7 18,900 BTU · Heat Pump Outdoor ×10
1 project · most recent 11/26/2025
Sprinkler System
FiledStatusContractorScope
11/26/2025Signed-offPRIME PIPING & HEATING INSprinkler System
3 projects · most recent 08/17/2026
General Wiring
FiledStatusContractorScope
08/17/2026CompleteHIVOLTS ELECTRICAL INC1 meters, 1 new_meters
03/24/2026CompleteHIVOLTS ELECTRICAL INCGeneral Wiring
09/15/2020Permit IssuedPK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
08/09/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/09/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/11/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/02/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/05/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/03/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/30/2026Pass-Final CND-Occupancy InspectionPassView ↗
12/31/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/02/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
11/17/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/17/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
11/26/2025Structural Cold-Formed SteelShahrish Shuvospecial
11/26/2025Structural Steel - DetailsShahrish Shuvospecial
11/26/2025FinalShahrish Shuvoprogress
11/26/2025Structural Stability – Alterations of existing buildingsShahrish Shuvospecial
07/16/2025HVAC-R and service water heating equipmentSHAHRIAR QUAYYUMenergy_progress
07/16/2025Maintenance informationSHAHRIAR QUAYYUMenergy_progress
07/16/2025Ventilation and air distribution systemSHAHRIAR QUAYYUMenergy_progress
07/16/2025HVAC-R and service water heating system controlsSHAHRIAR QUAYYUMenergy_progress
07/08/2025Structural Stability – Alterations of existing buildingsSHAHRIAR QUAYYUMspecial
07/08/2025Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
07/08/2025Energy Code Compliance InspectionsSHAHRIAR QUAYYUMprogress
07/08/2025Maintenance informationSHAHRIAR QUAYYUMenergy_progress
07/08/2025Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
07/08/2025Post-installed AnchorsSHAHRIAR QUAYYUMspecial
07/08/2025Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
07/08/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSHAHRIAR QUAYYUMspecial
07/08/2025HVAC-R and service water piping design and insulationSHAHRIAR QUAYYUMenergy_progress
07/07/2025HVAC-R and service water heating system controlsSHAHRIAR QUAYYUMenergy_progress
07/07/2025HVAC-R and service water heating equipmentSHAHRIAR QUAYYUMenergy_progress
07/07/2025Sprinkler SystemsSHAHRIAR QUAYYUMspecial
07/07/2025HVAC-R and service water piping design and insulationSHAHRIAR QUAYYUMenergy_progress
07/03/2025FinalSHAHRIAR QUAYYUMprogress
07/03/2025Mechanical SystemsSHAHRIAR QUAYYUMspecial
06/04/2025Permanent certificateSHAHRIAR QUAYYUMenergy_progress
05/07/2025MeteringSHAHRIAR QUAYYUMenergy_progress
Latest 25 of 35.
▾Documents — 31 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/19/2026X01222014-S1Request digital key ↗
08/19/2026X01222014-I1Request digital key ↗
08/19/2026X01222014-S4Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications16
▸DOB NOWProgress Inspector Seal & Signature6
09/02/2026X01222014-S1Open ↗
09/02/2026X01222014-S1Open ↗
09/01/2026X01222014-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/02/2026X01222014-S3Open ↗
09/02/2026X01222014-S1Open ↗
09/01/2026X01222014-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/19/2026X01222014-I1Open ↗
08/19/2026X01222014-S4Open ↗
08/19/2026X01222014-S3Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X01222014-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/19/2026X01222014-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/19/2026X01222014-I1Open ↗
08/19/2026X01222014-S4Open ↗
08/19/2026X01222014-S3Open ↗
Showing 3 of 5 on file for this type
▸Other Documents3
▸DOB NOWFinal Survey2
08/19/2026X01222014-I1Open ↗
08/13/2026X01222014-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/19/2026X01222014-I1Open ↗