2369 2ND AVENUE
MANHATTAN · BIN 1054610
💬 Discuss this project
1900Year Built
3Stories
I5Building Class
R9AZoning
7,386 sfGross Floor Area
1Units
Health center, child center, clinic · Owner of record: Silphip Realty · 2,592 sf lot · 2.85 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofHarlem East Life Plan13p · 2 filings · 20 docs
Floor 3Harlem East Life Plan20p · 4 filings · 20 docs
Floor 2Silphip Realty CORP15p · 3 filings · 20 docs
Floor 1Silphip Realty CORP16p · 3 filings · 20 docs
CellarSilphip Realty CORP4p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Silphip Realty2007/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Orsar Engineering202/28/2023
Hyman Hayes Associates102/27/2023
JM Consulting Engineers109/30/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
William Vitacco Associates603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Fichera ElectricElectrical603/21/2026
JRB ConstructionGeneral Contractor407/08/2026
IronboGeneral Contractor203/21/2026
Capital Contracting P&HPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Orsar Engineering8338202/27/2023
Pondosa Design5126109/30/2019
Building Lifecycle
All (39)Filed (4)Permit Issued (5)Signed Off (3)Inspection (2)Objection (6)Special Inspection (19)
12/21/2023
Signed off — Alteration
MECHANICAL WORK AS SHOWN ON ATTACHED PLANS.
M00805742-I1
12/19/2023
Signed off — Alteration
Filing for plumbing work on floors cellar & 1 thru 3. No change to use, egress, or occupancy.
M00805750-I1
12/13/2023
Signed off — Alteration
Filing for the renovation of an existing medical offices on floors 1 thru 3. Work includes removal and and installation of interior non load bearing partitions, doors, finish work, infill of exterior opening. No change to use, egress, or occupancy.
M00805483-I1
11/29/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/11/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/06/2023
Permit issued — Plumbing
M00805750-I1-PL
03/09/2023
Permit issued — General Construction
M00805483-I1-GC
03/09/2023
Permit issued — Plumbing
M00805750-I1-PL
03/09/2023
Permit issued — Mechanical Systems
M00805742-I1-MS
02/28/2023
Filed — Alteration
Filing for plumbing work on floors cellar & 1 thru 3. No change to use, egress, or occupancy.
M00805750-I1
02/28/2023
Objection raised — Scope
02/28/2023
Objection resolved — Addressed
02/28/2023
Objection raised — Other
02/28/2023
Objection resolved — Addressed
02/28/2023
Objection raised — Structural
02/28/2023
Objection resolved — Addressed
02/27/2023
Filed — Alteration
Filing for the renovation of an existing medical offices on floors 1 thru 3. Work includes removal and and installation of interior non load bearing partitions, doors, finish work, infill of exterior opening. No change to use, egress, or occupancy.
M00805483-I1
02/26/2023
Filed — Alteration
MECHANICAL WORK AS SHOWN ON ATTACHED PLANS.
M00805742-I1
02/23/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Liad Itzhaky
02/23/2023
Special inspection requirement — Interior lighting power
Liad Itzhaky
02/23/2023
Special inspection requirement — Lighting controls
Liad Itzhaky
02/23/2023
Special inspection requirement — Insulation placement and R values
Liad Itzhaky
02/23/2023
Special inspection requirement — Air barrier - visual inspection
Liad Itzhaky
02/23/2023
Special inspection requirement — Fire-Resistance Rated Construction
Liad Itzhaky
01/05/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Liad Itzhaky
01/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Liad Itzhaky
12/29/2022
Special inspection requirement — Mechanical Systems
Liad Itzhaky
12/29/2022
Special inspection requirement — Final
Liad Itzhaky
12/29/2022
Special inspection requirement — Final
Liad Itzhaky
10/29/2019
Permit issued — Mechanical Systems
M00192363-I1-MS
09/30/2019
Filed — Alteration
HVAC Upgrade at 3rd Flr & Roof
M00192363-I1
07/25/2019
Special inspection requirement — Energy Code Compliance Inspections
MANG WONG
07/23/2019
Special inspection requirement — Fire-Resistant Penetrations and Joints
MANG WONG
07/11/2019
Special inspection requirement — HVAC and service water heating equipment
MANG WONG
07/11/2019
Special inspection requirement — HVAC insulation and sealing
MANG WONG
07/11/2019
Special inspection requirement — Mechanical Systems
MANG WONG
07/11/2019
Special inspection requirement — Maintenance information
MANG WONG
07/11/2019
Special inspection requirement — Final
Jose Martinez
07/11/2019
Special inspection requirement — HVAC and service water heating system controls
MANG WONG
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCapital Contracting P&H10/06/2023
DOB NOWGeneral ConstructionSigned-offJRB Construction03/09/2023
DOB NOWPlumbingSigned-offCapital Contracting P&H03/09/2023
DOB NOWMechanical SystemsSigned-offJRB Construction03/09/2023
DOB NOWMechanical SystemsPermit IssuedIronbo10/29/2019
BISPLISSUEDRocco Fanelli06/13/2002
BIS—ISSUEDN/A12/17/1998
BISPLISSUEDMainland Plumbing & Heating11/02/1998
BISMHISSUEDFarrington Construction10/05/1998
BISOTISSUEDNirco Investors08/18/1998
BISOTISSUEDNirco Investors08/29/1997
1 project · most recent 09/30/2019
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/30/2019Permit IssuedIronboAir Conditioning Systems, Ventilation Systems
Cooling
Mitsubishi Electric MSZ-FH06NA 6,000 BTU · Fan Coil Indoor ×10
MSZ-FH12NA 12,000 BTU · Fan Coil Indoor ×3
SLZ-KF12NA 12,000 BTU · Fan Coil Indoor ×3
MXZ-8C48NAHZ 48,000 BTU · Fan Coil Indoor ×2
MXZ-4C36NAHZ 36,000 BTU · Heat Pump Outdoor ×1
Daikin RXTQ48TAVJU 48,000 BTU · Vrf Outdoor ×1
Ventilation
Daikin FXMQ48MFVJU 560 CFM · Vrf Indoor ×1
2 projects · most recent 05/18/2023
General Wiring
FiledStatusContractorScope
05/18/2023Permit IssuedFichera ElectricGeneral Wiring
12/21/2019Permit IssuedAll Boro ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
11/29/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/11/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
02/23/2023Fire-Resistant Penetrations and JointsLiad Itzhakyspecial
02/23/2023Interior lighting powerLiad Itzhakyenergy_progress
02/23/2023Lighting controlsLiad Itzhakyenergy_progress
02/23/2023Insulation placement and R valuesLiad Itzhakyenergy_progress
02/23/2023Air barrier - visual inspectionLiad Itzhakyenergy_progress
02/23/2023Fire-Resistance Rated ConstructionLiad Itzhakyprogress
01/05/2023HVAC-R and service water piping design and insulationLiad Itzhakyenergy_progress
01/05/2023Fire-Resistant Penetrations and JointsLiad Itzhakyspecial
12/29/2022Mechanical SystemsLiad Itzhakyspecial
12/29/2022FinalLiad Itzhakyprogress
12/29/2022FinalLiad Itzhakyprogress
07/25/2019Energy Code Compliance InspectionsMANG WONGprogress
07/23/2019Fire-Resistant Penetrations and JointsMANG WONGspecial
07/11/2019HVAC and service water heating equipment MANG WONGenergy_progress
07/11/2019HVAC insulation and sealing MANG WONGenergy_progress
07/11/2019Mechanical SystemsMANG WONGspecial
07/11/2019Maintenance informationMANG WONGenergy_progress
07/11/2019FinalJose Martinezprogress
07/11/2019HVAC and service water heating system controls MANG WONGenergy_progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Harlem East Life PlanMedical / HealthcareFloor 3, Roof
Project M00192363 Alteration · Permit Entire · 09/30/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 37 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch3
08/31/2026M00805742-I1Request digital key ↗
08/31/2026M00805750-I1Request digital key ↗
08/15/2026M00805483-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00192363-I1Request digital key ↗
▸Seals & Professional Certifications23
▸DOB NOWProgress Inspector Seal & Signature14
08/31/2026M00192363-I1Open ↗
08/31/2026M00192363-I1Open ↗
08/31/2026M00192363-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/31/2026M00192363-I1Open ↗
08/31/2026M00192363-I1Open ↗
08/28/2026M00805483-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/31/2026M00805483-I1Open ↗
08/31/2026M00805750-I1Open ↗
08/13/2026M00805742-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/31/2026M00805750-I1Open ↗
08/15/2026M00805483-I1Open ↗
08/13/2026M00192363-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWOER: Notice of Satisfaction3
08/13/2026M00805750-I1Open ↗
08/13/2026M00805742-I1Open ↗
08/13/2026M00805483-I1Open ↗
▸DOB NOWOER: Notice to Proceed3
08/13/2026M00805483-I1Open ↗
08/13/2026M00805742-I1Open ↗
08/13/2026M00805750-I1Open ↗