← Back
Factory, light manufacturing
2369 LORILLARD PLACE
BRONX · BIN 2011692
💬 Discuss this project
1931Year Built
2Stories
F5Building Class
R6Zoning
5,000 sfGross Floor Area
1Units
3 Open Violations 2 unresolved · 1 paperwork only ▸
Factory, light manufacturing · 4,500 sf lot · 1.11 FAR built · Flood zone X
Locations of Work
Architecture
Permit Issued — active, not yet Signed-off
Roof2p · 1 filing · 9 docs
Floor 61p · 1 filing · 9 docs
Floor 5
Floor 4
Floor 3
Floor 2Under Construction2p · 1 filing · 14 docs
Floor 1Under Construction1 filing · 14 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/05/2025$1.4M—Private party → Private party$270/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HENNAN GROUP INCGeneral Contractor408/26/2026
N.B.A CONSTRUCTION INCGeneral Contractor107/15/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ADROIT ENGINEERING PLLC8885101/27/2026
Building Lifecycle
All (37)Filed (6)Permit Issued (5)Violation (3)Objection (4)Special Inspection (19)
08/07/2026
Permit issued — Full Demolition
X01346233-I1-FD
07/31/2026
Violation issued (ECB, open)
Construction
07/29/2026
Special inspection requirement — Air barrier - visual inspection
07/14/2026
Permit issued — Sidewalk Shed
X01426859-I1-SH
07/13/2026
Filed — Alteration
Filing is for temporary sidewalk. No change in use, occupancy or egress.
X01426859-I1
07/07/2026
Objection resolved — Addressed
06/05/2026
Violation issued (ECB, open)
Unknown
06/02/2026
Violation issued (ECB, open)
Construction
05/22/2026
Objection raised — Other
04/29/2026
Permit issued — Protection and Mechanical Methods
X01346233-S1-PMM
04/28/2026
Permit issued — Full Demolition
X01346233-I1-FD
04/27/2026
Special inspection requirement — Air barrier continuity plan testing
04/24/2026
Permit issued — Construction Fence
X01385717-I1-FN
04/19/2026
Filed — Alteration
PROPOSED 8FT CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X01385717-I1
04/07/2026
Filed — New Building
X01372889-I1
03/24/2026
Filed — Alteration
Construction Fence filed in conjunction with NB Application # X01372889-I1
X01372440-I1
03/24/2026
Special inspection requirement — Energy Code Compliance Inspections
03/24/2026
Special inspection requirement — Fire-Resistance Rated Construction
03/24/2026
Special inspection requirement — Fenestration areas
03/24/2026
Special inspection requirement — Lighting controls
03/24/2026
Special inspection requirement — Insulation placement and R values
03/24/2026
Special inspection requirement — Air barrier — testing
03/24/2026
Special inspection requirement — Interior lighting power
03/24/2026
Special inspection requirement — Electrical motors and elevators
03/24/2026
Special inspection requirement — Lighting in dwelling units
03/24/2026
Special inspection requirement — Metering
03/24/2026
Special inspection requirement — Fenestration air leakage
03/24/2026
Special inspection requirement — Protection of exposed foundation insulation
03/24/2026
Special inspection requirement — Maintenance information
03/24/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
03/24/2026
Special inspection requirement — Combustible Exterior Wall Coverings
03/24/2026
Special inspection requirement — Exterior lighting power
03/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/05/2026
Filed — Full Demolition
MECHANICAL MEANS SUBMITTED FOR USE OF MECHANICAL EQUIPMENT ON GRADE AT THE TIME OF DEMOLITION
X01346233-S1
02/17/2026
Objection resolved — Addressed
02/09/2026
Objection raised — Admin
01/27/2026
Filed — Full Demolition
MECHANICAL MEANS SUBMITTED FOR USE OF MECHANICAL EQUIPMENT ON GRADE AT THE TIME OF DEMOLITION
X01346233-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFull DemolitionPermit IssuedHENNAN GROUP INC08/07/2026
DOB NOWSidewalk ShedPermit IssuedN.B.A CONSTRUCTION INC07/14/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedHENNAN GROUP INC04/29/2026
DOB NOWFull DemolitionPermit IssuedHENNAN GROUP INC04/28/2026
DOB NOWConstruction FencePermit IssuedHENNAN GROUP INC04/24/2026
1 project · most recent 07/13/2026
FiledStatusContractorScope
07/13/2026Permit IssuedAUJLA ELECTRIC CORP—
3 projects · most recent 07/13/2026
Fence Sidewalk Shed
FiledStatusContractorScope
07/13/2026Permit IssuedN.B.A CONSTRUCTION INCSidewalk Shed
04/19/2026Permit IssuedHENNAN GROUP INCFence
03/24/2026——Fence
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
07/29/2026Air barrier - visual inspection—energy_progress
04/27/2026Air barrier continuity plan testing—energy_progress
03/24/2026Energy Code Compliance Inspections—progress
03/24/2026Fire-Resistance Rated Construction—progress
03/24/2026Fenestration areas—energy_progress
03/24/2026Lighting controls—energy_progress
03/24/2026Insulation placement and R values—energy_progress
03/24/2026Air barrier — testing —energy_progress
03/24/2026Interior lighting power—energy_progress
03/24/2026Electrical motors and elevators—energy_progress
03/24/2026Lighting in dwelling units—energy_progress
03/24/2026Metering—energy_progress
03/24/2026Fenestration air leakage—energy_progress
03/24/2026Protection of exposed foundation insulation—energy_progress
03/24/2026Maintenance information—energy_progress
03/24/2026Fenestration and door U-factor and product ratings—energy_progress
03/24/2026Combustible Exterior Wall Coverings—special
03/24/2026Exterior lighting power—energy_progress
03/24/2026Fire-Resistant Penetrations and Joints—special
▾Documents — 27 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/17/2026X01346233-S1Request digital key ↗
08/17/2026X01346233-I1Request digital key ↗
08/17/2026X01372440-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/17/2026X01372889-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/17/2026X01372889-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/17/2026X01372889-I1Open ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/17/2026X01346233-S1Open ↗
08/17/2026X01346233-I1Open ↗
08/17/2026X01372440-I1Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment4
▸DOB NOWElectric Cut-Off1
08/17/2026X01346233-I1Open ↗
▸DOB NOWWater Cut-Off1
08/17/2026X01346233-I1Open ↗
▸DOB NOWGas Cut-Off1
08/17/2026X01346233-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/17/2026X01346233-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/17/2026X01372889-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026X01346233-I1Open ↗
▸DOB NOWRodent Control1
08/17/2026X01346233-I1Open ↗
▸Other Documents7
▸DOB NOWProperty Ownership Certification2
08/17/2026X01346233-I1Open ↗
08/17/2026X01372889-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/17/2026X01372889-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/17/2026X01346233-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/17/2026X01346233-I1Open ↗
▸DOB NOWStructure Photographs1
08/17/2026X01346233-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/17/2026X01372889-I1Open ↗