Two stories - detached, small or mid-size
237-01 88 AVENUE
QUEENS · BIN 4166599
💬 Discuss this project
1925Year Built
2.5Stories
A1Building Class
R2AZoning
1,580 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 5,270 sf lot · 0.3 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR109/08/2025
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281109/08/2025
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
01/02/2026
Signed off — Alteration
INSTALLATION OF SOLAR PANELS, ROOFTOP,RAILED, GRID-TIED, 10 MODULES, 4.3KW
Q01283303-I1
09/15/2025
Permit issued — Solar
Q01283303-I1-SL
09/08/2025
Filed — Alteration
INSTALLATION OF SOLAR PANELS, ROOFTOP,RAILED, GRID-TIED, 10 MODULES, 4.3KW
Q01283303-I1
09/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
09/08/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
09/08/2025
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
09/08/2025
Special inspection requirement — Final
Mina Makar
09/08/2025
Special inspection requirement — Air barrier - visual inspection
Mina Makar
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR09/15/2025
1 project · most recent 09/08/2025
FiledStatusContractorScope
09/08/2025CompleteISLAND ELECTRIC CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
09/08/2025Fire-Resistant Penetrations and JointsMina Makarspecial
09/08/2025Structural Stability – Alterations of existing buildingsMina Makarspecial
09/08/2025Energy Code Compliance InspectionsMina Makarprogress
09/08/2025FinalMina Makarprogress
09/08/2025Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/19/2026Q01283303-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/23/2026Q01283303-I1Open ↗
08/23/2026Q01283303-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/19/2026Q01283303-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026Q01283303-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/19/2026Q01283303-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01283303-I1Open ↗