Large suburban residence
237-05 38 ROAD
QUEENS · Douglaston-Little Neck · BIN 4168515
💬 Discuss this project
1961Year Built
2.5Stories
A3Building Class
R1-2Zoning
—Gross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Large suburban residence · 0.32 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR106/25/2024
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281106/25/2024
Building Lifecycle
All (9)Filed (1)Permit Issued (1)Signed Off (1)Violation (1)Special Inspection (5)
03/06/2025
Signed off — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 21 Panels, 8.61 kW
Q01045252-I1
07/02/2024
Permit issued — Solar
Q01045252-I1-SL
06/25/2024
Filed — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 21 Panels, 8.61 kW
Q01045252-I1
05/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
05/02/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
05/02/2024
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
05/02/2024
Special inspection requirement — Final
Mina Makar
05/02/2024
Special inspection requirement — Air barrier - visual inspection
Mina Makar
02/21/1997
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR07/02/2024
BISPLISSUEDMAINLAND PLG04/01/1997
BIS—ISSUEDLST CONST INC01/13/1997
2 projects · most recent 05/02/2024
General Wiring
FiledStatusContractorScope
05/02/2024CompleteISLAND ELECTRIC CORP—
04/17/2018CancelledNTS ELECTRICAL, INCGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
05/02/2024Fire-Resistant Penetrations and JointsMina Makarspecial
05/02/2024Structural Stability – Alterations of existing buildingsMina Makarspecial
05/02/2024Energy Code Compliance InspectionsMina Makarprogress
05/02/2024FinalMina Makarprogress
05/02/2024Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/22/2026Q01045252-I1Request digital key ↗
▸Applications & Permits1
▸DOB NOWLPC Approval/Permit1
08/13/2026Q01045252-I1Open ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/31/2026Q01045252-I1Open ↗
08/31/2026Q01045252-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026Q01045252-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/31/2026Q01045252-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q01045252-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01045252-I1Open ↗