← Back
Two family converted from one family
237-34 FAIRBURY AVENUE
QUEENS · Bellerose · BIN 4167781
💬 Discuss this project
1945Year Built
2Stories
B3Building Class
R3AZoning
2,372 sfGross Floor Area
2Units
Rent Stabilized3 Open Violations ▸FDNY Report ↗
Two family converted from one family · Owner of record: LUCKY STAR HOMES LLC · 3,824 sf lot · 0.62 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipment
Floor 217p · 1 filing · 20 docs
Floor 117p · 1 filing · 20 docs
Cellar24p · 1 filing · 20 docs
Site & exterior19p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
10428 MERRICK BLVD INC2107/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/09/2023$1.2M—10428 MERRICK BLVD, INC. → LUCKY STAR HOMES LLC$519/sf building
06/30/2021$380K—1016 JULIA NB LLC → 10428 MERRICK BLVD INC.$160/sf building
07/15/2020$470K—Private party → 1016 JULIA NB LLC$198/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CL ENGINEERING P.C.509/28/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METRO DESIGN CONSULTANTS INC1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PANTANO LANDSCAPING & CONGeneral Contractor803/21/2026
VMC PLUMBING & HEATING INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781409/28/2022
TRIANGLE INSPECTION & TES7495208/09/2022
Building Lifecycle
All (98)Filed (5)Permit Issued (5)Signed Off (2)Violation (39)Inspection (7)Objection (10)Special Inspection (30)
11/25/2025
Violation issued (HPD, open)
I
12/05/2024
Violation issued (HPD, open)
I
11/29/2023
Violation issued (HPD, open)
I
07/17/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
12/06/2022
Signed off — Alteration CO
FILED HEREWITH PLUMBING WORK TYPES IN CONJUNCTION WITH DOB NOW APPLICATIONS # Q00527532-I1.
Q00527532-S1
12/05/2022
Signed off — Alteration
Q00626568-I1
12/05/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/01/2022
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
12/01/2022
Special inspection requirement — Heating Systems
CHRISTIAN LOZADA
12/01/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
12/01/2022
Special inspection requirement — Mechanical Systems
CHRISTIAN LOZADA
12/01/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
CHRISTIAN LOZADA
12/01/2022
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
12/01/2022
Special inspection requirement — Structural Steel - High Strength Bolting
CHRISTIAN LOZADA
12/01/2022
Special inspection requirement — Subgrade Inspections
CHRISTIAN LOZADA
12/01/2022
Special inspection requirement — Masonry
CHRISTIAN LOZADA
12/01/2022
Special inspection requirement — Concrete - Cast-In-Place
CHRISTIAN LOZADA
12/01/2022
Special inspection requirement — Structural Steel - Details
CHRISTIAN LOZADA
12/01/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
CHRISTIAN LOZADA
12/01/2022
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
CHRISTIAN LOZADA
12/01/2022
Special inspection requirement — Footing and Foundation
CHRISTIAN LOZADA
12/01/2022
Special inspection requirement — Structural Wood Frame
CHRISTIAN LOZADA
12/01/2022
Special inspection requirement — Final
CHRISTIAN LOZADA
12/01/2022
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
11/25/2022
Objection resolved — Addressed
11/18/2022
Violation issued (HPD, closed)
I
11/15/2022
Objection resolved — Addressed
10/20/2022
Objection resolved — Addressed
10/20/2022
Objection resolved — Addressed
10/20/2022
Objection resolved — Addressed
10/04/2022
Objection raised — Admin
10/04/2022
Objection raised — Zoning
10/04/2022
Objection raised — Zoning
10/04/2022
Objection raised — Fire_Protection
10/04/2022
Objection raised — Fire_Protection
09/28/2022
Filed — Alteration CO
FILED HEREWITH PLUMBING WORK TYPES IN CONJUNCTION WITH DOB NOW APPLICATIONS # Q00527532-I1.
Q00527532-P3
08/24/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/12/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
CHRISTIAN LOZADA
08/12/2022
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
08/12/2022
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
08/12/2022
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
08/12/2022
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
08/12/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
08/12/2022
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
08/12/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
08/09/2022
Filed — Alteration CO
FILED HEREWITH PLUMBING WORK TYPES IN CONJUNCTION WITH DOB NOW APPLICATIONS # Q00527532-I1.
Q00527532-P2
07/22/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
CHRISTIAN LOZADA
07/22/2022
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
07/22/2022
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
07/22/2022
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
07/22/2022
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
07/11/2022
Permit issued — Construction Fence
Q00626568-I1-FN
07/11/2022
Permit issued — General Construction
Q00527532-I1-GC-CX
06/02/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/02/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/02/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/02/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/30/2022
Permit issued — Plumbing
Q00527532-S1-PL
02/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/25/2022
Violation issued (ECB, closed)
Construction
Latest 60 of 98 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offPANTANO LANDSCAPING CON07/11/2022
DOB NOWGeneral ConstructionPermit IssuedPANTANO LANDSCAPING CON07/11/2022
DOB NOWPlumbingSigned-offM. SPINELLI PLB & HTG INC03/30/2022
DOB NOWMechanical SystemsPermit IssuedPANTANO LANDSCAPING CON01/19/2022
DOB NOWConstruction FenceSigned-offPANTANO LANDSCAPING CON12/15/2021
1 project · most recent 09/28/2022
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/28/2022Permit IssuedPANTANO LANDSCAPING & CONVentilation Systems
Ventilation
Hampton Bay 7114-01 50 CFM · Exhaust Fan ×5
Delta Breeze SMT150 150 CFM · Exhaust Fan ×2
1 project · most recent 09/28/2022
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/28/2022Signed-offVMC PLUMBING & HEATING INGas, Storm, Water/Sanitary
1 project · most recent 03/24/2022
General Wiring Lighting
FiledStatusContractorScope
03/24/2022CompleteBDS ELECTRIC CORP.General Wiring, Lighting
1 project · most recent 09/28/2022
Steel Wood
FiledStatusContractorScope
09/28/2022Permit IssuedPANTANO LANDSCAPING & CONSteel, Wood
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
07/17/2023Fail-Final General Construction Non-Directive 14FailView ↗
12/05/2022Pass-Final CND-Occupancy InspectionPassView ↗
08/24/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/02/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/02/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/02/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/02/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
12/01/2022Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
12/01/2022Heating SystemsCHRISTIAN LOZADAspecial
12/01/2022Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
12/01/2022Mechanical SystemsCHRISTIAN LOZADAspecial
12/01/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationCHRISTIAN LOZADAspecial
12/01/2022Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
12/01/2022Structural Steel - High Strength BoltingCHRISTIAN LOZADAspecial
12/01/2022Subgrade InspectionsCHRISTIAN LOZADAspecial
12/01/2022MasonryCHRISTIAN LOZADAspecial
12/01/2022Concrete - Cast-In-PlaceCHRISTIAN LOZADAspecial
12/01/2022Structural Steel - DetailsCHRISTIAN LOZADAspecial
12/01/2022Structural Stability – Alterations of existing buildingsCHRISTIAN LOZADAspecial
12/01/2022Excavations - Sheeting, Shoring, and BracingCHRISTIAN LOZADAspecial
12/01/2022Footing and FoundationCHRISTIAN LOZADAprogress
12/01/2022Structural Wood FrameCHRISTIAN LOZADAprogress
12/01/2022FinalCHRISTIAN LOZADAprogress
12/01/2022Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
08/12/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationCHRISTIAN LOZADAspecial
08/12/2022Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
08/12/2022Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
08/12/2022HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
08/12/2022HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
08/12/2022HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
08/12/2022Maintenance informationCHRISTIAN LOZADAenergy_progress
08/12/2022Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
Latest 25 of 33.
▾Documents — 50 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/27/2026Q00626568-I1Request digital key ↗
08/26/2026Q00527532-P2Request digital key ↗
08/26/2026Q00527532-S1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q00527532-I1Open ↗
08/13/2026Q00527532-P3Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00527532-I1Open ↗
▸Seals & Professional Certifications21
▸DOB NOWSpecial Inspector Seal & Signature11
09/02/2026Q00527532-I1Open ↗
09/02/2026Q00527532-I1Open ↗
09/02/2026Q00527532-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/02/2026Q00527532-I1Open ↗
08/30/2026Q00527532-P2Open ↗
08/30/2026Q00527532-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/27/2026Q00626568-I1Open ↗
08/26/2026Q00527532-S1Open ↗
08/26/2026Q00527532-I1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
08/13/2026Q00527532-I1Open ↗
08/13/2026Q00527532-P3Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00527532-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/26/2026Q00527532-I1Open ↗
08/26/2026Q00527532-P2Open ↗
08/26/2026Q00527532-S1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00527532-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/13/2026Q00527532-P3Open ↗
08/13/2026Q00527532-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00527532-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026Q00527532-I1Open ↗
▸Other Documents9
▸DOB NOWSite Survey: Initial2
08/13/2026Q00527532-I1Open ↗
08/13/2026Q00527532-P3Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q00527532-P3Open ↗
08/13/2026Q00527532-I1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026Q00527532-I1Open ↗
08/13/2026Q00527532-P3Open ↗
▸DOB NOWProperty Ownership Certification1
08/26/2026Q00527532-P2Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00527532-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00527532-I1Open ↗