← Back
Three families
237 EAST 93 STREET
BROOKLYN · BIN 3100585
💬 Discuss this project
1930Year Built
2Stories
C0Building Class
R6Zoning
3,270 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Three families · Owner of record: 237 EAST 93 LLC · 2,500 sf lot · 1.31 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Floor 219p · 1 filing · 20 docs
Floor 121p · 1 filing · 20 docs
Basement21p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
855 MORRIS PARK2307/08/2026
A D GENERAL CONTRACTORS404/09/2026
PARK REALTY NY103/22/2026
QNS 007 LLC203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/18/2025$895K—QNS 007 LLC → 237 EAST 93 LLC$274/sf building
03/12/2025$400K—Private party → QNS 007 LLC$122/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LEANDRO NILS DICKSON ARCHITECT, LLC402/12/2026
MOHAMMAD HAQUE107/28/2025
VASILIOS ARTEMIOU PE306/23/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPRESS FILING INC1203/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PARK REALTY NY INCGeneral Contractor507/08/2026
LENS ELECTRIC, INCElectrical103/22/2026
DYNAMIC PLBNG & SPRKR CORFire Protection107/08/2026
A & D GENERAL CONTR INCGeneral Contractor104/09/2026
KISHAN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ENGINEERING CONSULTING SE2050202/12/2026
HRF SERVICES CORP5616502/12/2026
Building Lifecycle
All (116)Filed (7)Permit Issued (6)Signed Off (6)Violation (15)Inspection (8)Objection (44)Special Inspection (30)
05/11/2026
Violation issued (HPD, closed)
A
04/01/2026
Signed off — Alteration CO
PROPOSED INTERIOR AND EXTERIOR RENOVATION CONVERTING EXISTING 2 STORY AND BASEMENT, INTO A 8 UNIT RESIDENTIAL BUILDING.
B01218405-I1
03/04/2026
Signed off — Alteration CO
PROPOSED INTERIOR AND EXTERIOR RENOVATION CONVERTING EXISTING 2 STORY AND BASEMENT, INTO A 8 UNIT RESIDENTIAL BUILDING.
B01218405-S3
03/04/2026
Signed off — Alteration CO
PROPOSED INTERIOR AND EXTERIOR RENOVATION CONVERTING EXISTING 2 STORY AND BASEMENT, INTO A 8 UNIT RESIDENTIAL BUILDING.
B01218405-S1
03/04/2026
Signed off — Alteration CO
PROPOSED INTERIOR AND EXTERIOR RENOVATION CONVERTING EXISTING 2 STORY AND BASEMENT, INTO A 8 UNIT RESIDENTIAL BUILDING.
B01218405-S2
02/12/2026
Filed — Alteration CO
PROPOSED INTERIOR AND EXTERIOR RENOVATION CONVERTING EXISTING 2 STORY AND BASEMENT, INTO A 8 UNIT RESIDENTIAL BUILDING.
B01218405-P2
02/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL MARINO
02/10/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
SHAHRIAR QUAYYUM
02/10/2026
Special inspection requirement — Energy Code Compliance Inspections
SHAHRIAR QUAYYUM
02/10/2026
Special inspection requirement — Fire-Resistance Rated Construction
SHAHRIAR QUAYYUM
02/10/2026
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
02/10/2026
Special inspection requirement — Insulation placement and R values
SHAHRIAR QUAYYUM
02/10/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SHAHRIAR QUAYYUM
02/10/2026
Special inspection requirement — Air barrier - visual inspection
SHAHRIAR QUAYYUM
02/10/2026
Special inspection requirement — Metering
SHAHRIAR QUAYYUM
02/10/2026
Special inspection requirement — Interior lighting power
SHAHRIAR QUAYYUM
02/10/2026
Special inspection requirement — Fenestration areas
SHAHRIAR QUAYYUM
02/10/2026
Special inspection requirement — Permanent certificate
SHAHRIAR QUAYYUM
02/10/2026
Special inspection requirement — Electric vehicle service equipment requirements
SHAHRIAR QUAYYUM
02/10/2026
Special inspection requirement — Fenestration air leakage
SHAHRIAR QUAYYUM
01/07/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/06/2026
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
12/29/2025
Signed off — Alteration
B01261862-I1
12/29/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/26/2025
Signed off — Alteration CO
PROPOSED INTERIOR AND EXTERIOR RENOVATION CONVERTING EXISTING 2 STORY AND BASEMENT, INTO A 8 UNIT RESIDENTIAL BUILDING.
B01218405-S5
12/23/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
12/23/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/17/2025
Permit issued — Construction Fence
B01218405-S5-FN
10/29/2025
Objection resolved — Addressed
10/28/2025
Objection raised — Other
10/23/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/23/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/23/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/05/2025
Filed — Alteration CO
PROPOSED INTERIOR AND EXTERIOR RENOVATION CONVERTING EXISTING 2 STORY AND BASEMENT, INTO A 8 UNIT RESIDENTIAL BUILDING.
B01218405-S5
10/03/2025
Permit issued — Sprinklers
B01218405-S1-EW-SP
09/30/2025
Violation issued (ECB, closed)
Construction
09/17/2025
Permit issued — Plumbing
B01218405-S2-PL
09/03/2025
Permit issued — Mechanical Systems
B01218405-S3-MS
09/02/2025
Permit issued — General Construction
B01218405-I1-GC
08/22/2025
Permit issued — Sidewalk Shed
B01261862-I1-SH
08/05/2025
Objection resolved — Addressed
08/05/2025
Objection resolved — Addressed
07/28/2025
Filed — Alteration
B01261862-I1
07/22/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/21/2025
Violation issued (ECB, closed)
Construction
07/21/2025
Violation issued (ECB, closed)
Construction
07/15/2025
Objection resolved — Addressed
07/09/2025
Objection raised — Other
07/01/2025
Objection raised — Cost
07/01/2025
Objection resolved — Addressed
07/01/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
SHAHRIAR QUAYYUM
06/23/2025
Filed — Alteration CO
PROPOSED INTERIOR AND EXTERIOR RENOVATION CONVERTING EXISTING 2 STORY AND BASEMENT, INTO A 8 UNIT RESIDENTIAL BUILDING.
B01218405-S3
06/23/2025
Special inspection requirement — Ventilation and air distribution system
SHAHRIAR QUAYYUM
06/23/2025
Special inspection requirement — Mechanical Systems
SHAHRIAR QUAYYUM
06/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
06/23/2025
Special inspection requirement — Post-installed Anchors
SHAHRIAR QUAYYUM
06/23/2025
Special inspection requirement — Final
SHAHRIAR QUAYYUM
06/23/2025
Special inspection requirement — Energy Code Compliance Inspections
SHAHRIAR QUAYYUM
06/23/2025
Special inspection requirement — HVAC-R and service water heating system controls
SHAHRIAR QUAYYUM
06/23/2025
Special inspection requirement — Duct leakage testing, insulation and design
SHAHRIAR QUAYYUM
Latest 60 of 116 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offPARK REALTY NY INC11/17/2025
DOB NOWSprinklersSigned-offCITYWIDE PLBG, HTG &SPRKL10/03/2025
DOB NOWPlumbingSigned-offN AND S PLUMBING INC09/17/2025
DOB NOWMechanical SystemsSigned-offPARK REALTY NY INC09/03/2025
DOB NOWGeneral ConstructionPermit IssuedPARK REALTY NY INC09/02/2025
DOB NOWSidewalk ShedSigned-offA & D GENERAL CONTR INC08/22/2025
1 project · most recent 02/12/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
02/12/2026Signed-offPARK REALTY NY INCHeating and Air Conditioning Systems
Heat / Cool
Daikin MXZ-2C20NA4 24,000 BTU · Heat Pump Outdoor ×8
2 projects · most recent 01/14/2026
General Wiring
FiledStatusContractorScope
01/14/2026CompleteLENS ELECTRIC, INCGeneral Wiring
07/28/2025CompleteRICHARD NEU—
1 project · most recent 02/12/2026
Fence
FiledStatusContractorScope
02/12/2026Signed-offPARK REALTY NY INCFence
1 project · most recent 02/12/2026
Construction Fence
FiledStatusContractorScope
02/12/2026Signed-offPARK REALTY NY INCConstruction Fence
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
01/07/2026Pass-Final CND-Occupancy InspectionPassView ↗
01/06/2026Pass-Final SP - Up to 3 Requested FloorsPassView ↗
12/29/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/23/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
12/23/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/23/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/23/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/23/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
02/10/2026Fire-Resistant Penetrations and JointsPAUL MARINOspecial
02/10/2026Structural Stability – Alterations of existing buildingsSHAHRIAR QUAYYUMspecial
02/10/2026Energy Code Compliance InspectionsSHAHRIAR QUAYYUMprogress
02/10/2026Fire-Resistance Rated ConstructionSHAHRIAR QUAYYUMprogress
02/10/2026Maintenance informationSHAHRIAR QUAYYUMenergy_progress
02/10/2026Insulation placement and R valuesSHAHRIAR QUAYYUMenergy_progress
02/10/2026Fenestration and door U-factor and product ratingsSHAHRIAR QUAYYUMenergy_progress
02/10/2026Air barrier - visual inspectionSHAHRIAR QUAYYUMenergy_progress
02/10/2026MeteringSHAHRIAR QUAYYUMenergy_progress
02/10/2026Interior lighting powerSHAHRIAR QUAYYUMenergy_progress
02/10/2026Fenestration areasSHAHRIAR QUAYYUMenergy_progress
02/10/2026Permanent certificateSHAHRIAR QUAYYUMenergy_progress
02/10/2026Electric vehicle service equipment requirementsSHAHRIAR QUAYYUMenergy_progress
02/10/2026Fenestration air leakageSHAHRIAR QUAYYUMenergy_progress
07/01/2025Structural Stability – Alterations of existing buildingsSHAHRIAR QUAYYUMspecial
06/23/2025Ventilation and air distribution systemSHAHRIAR QUAYYUMenergy_progress
06/23/2025Mechanical SystemsSHAHRIAR QUAYYUMspecial
06/23/2025Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
06/23/2025Post-installed AnchorsSHAHRIAR QUAYYUMspecial
06/23/2025FinalSHAHRIAR QUAYYUMprogress
06/23/2025Energy Code Compliance InspectionsSHAHRIAR QUAYYUMprogress
06/23/2025HVAC-R and service water heating system controlsSHAHRIAR QUAYYUMenergy_progress
06/23/2025Duct leakage testing, insulation and designSHAHRIAR QUAYYUMenergy_progress
06/23/2025Permanent certificateSHAHRIAR QUAYYUMenergy_progress
06/23/2025Maintenance informationSHAHRIAR QUAYYUMenergy_progress
Latest 25 of 43.
▾Documents — 36 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/21/2026B01261862-I1Request digital key ↗
08/18/2026B01218405-S2Request digital key ↗
08/18/2026B01218405-P2Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications16
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/21/2026B01261862-I1Open ↗
08/18/2026B01218405-S1Open ↗
08/18/2026B01218405-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/23/2026B01218405-S3Open ↗
09/23/2026B01218405-S3Open ↗
08/28/2026B01218405-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026B01218405-S3Open ↗
08/28/2026B01218405-P2Open ↗
08/28/2026B01218405-P2Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/13/2026B01218405-P2Open ↗
08/13/2026B01218405-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B01218405-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B01218405-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B01218405-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/18/2026B01218405-S1Open ↗
08/18/2026B01218405-P2Open ↗
08/18/2026B01218405-I1Open ↗
Showing 3 of 5 on file for this type
▸Other Documents3
▸DOB NOWProperty Ownership Certification2
08/18/2026B01218405-I1Open ↗
08/18/2026B01218405-P2Open ↗
▸DOB NOWFinal Survey1
08/13/2026B01218405-I1Open ↗