← Back
Primarily 2 family with 1 store or office
237 SOUTH AVENUE
STATEN ISLAND · Mariner's Harbor-Arlington-Graniteville · BIN 5028252
💬 Discuss this project
1955Year Built
2Stories
S2Building Class
M2-1Zoning
1,750 sfGross Floor Area
3Units
0 Open ViolationsFDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: AJPB REALTY LLC · 7,150 sf lot · 0.24 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingCivilGeneral
Permit Issued — active, not yet Signed-off
Floor 214p · 4 filings · 20 docs
Floor 1Under Construction15p · 6 filings · 20 docs
Cellar7p · 2 filings · 20 docs
Sub-Basement12p · 1 filing · 13 docs
Site & exterior5p · 2 filings · 3 docs
Filed — no permit issued19p · 4 filings · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STEVEN R. SAVINO ARCHITECT PC812/18/2025
C&P DESIGN CONSULTANTS209/23/2025
SCAGLIONE ARCHITECTS511/16/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A BIANCO LANDSCAPING INCGeneral Contractor807/08/2026
CAPITAL CONTR P&H CORPPlumbing207/08/2026
RELIABLE HEATING AND COOLGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
C&P DESIGN CONSULTANT8472209/23/2025
STEVEN R. SAVINO ARCHIT1216207/09/2025
Building Lifecycle
All (96)Filed (15)Permit Issued (7)Signed Off (6)Violation (19)Inspection (6)Objection (13)Special Inspection (30)
05/20/2026
Inspection — Pass-Final Curb Cut Withdrawal
Pass
View inspection ↗
05/15/2026
Signed off — Alteration
Install new steel deck & steel pan stairs, new storefront, new windows and interior alterations to the first and second floors.
S01139294-I1
04/16/2026
Signed off — Alteration
INSTALLATION OF GAS AND SANITARY PLUMBING WORK IN THE CELLAR SPACE AND ON THE FIRST AND SECOND FLOORS.
S01251187-I1
03/11/2026
Signed off — Alteration
Installation of New VRF System, ERV, & Replacement of Existing Boiler in Conjunction with S00961234-I1 filing
S00961234-S1
02/05/2026
Permit issued — Curb Cut
S01337076-I1-CC
12/19/2025
Special inspection requirement — HVAC-R and service water heating system controls
Steven Savino
12/19/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Savino
12/19/2025
Special inspection requirement — HVAC-R and service water heating equipment
Steven Savino
12/18/2025
Filed — Alteration
INSTALLATION OF GAS AND SANITARY PLUMBING WORK IN THE CELLAR SPACE AND ON THE FIRST AND SECOND FLOORS.
S01251187-P2
12/18/2025
Filed — Alteration
S01337076-I1
11/13/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/24/2025
Filed — Alteration
INSTALLATION OF GAS AND SANITARY PLUMBING WORK IN THE CELLAR SPACE AND ON THE FIRST AND SECOND FLOORS.
S01251187-P1
10/20/2025
Special inspection requirement — HVAC-R and service water heating equipment
Stanislav Pilipenko
10/20/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Stanislav Pilipenko
10/20/2025
Special inspection requirement — Maintenance information
Stanislav Pilipenko
10/20/2025
Special inspection requirement — Permanent certificate
Stanislav Pilipenko
10/20/2025
Special inspection requirement — HVAC-R and service water heating system controls
Stanislav Pilipenko
10/20/2025
Special inspection requirement — Ventilation and air distribution system
Stanislav Pilipenko
10/20/2025
Special inspection requirement — Final
Stanislav Pilipenko
10/20/2025
Special inspection requirement — Energy Code Compliance Inspections
Stanislav Pilipenko
10/20/2025
Special inspection requirement — Chimneys and vents
Stanislav Pilipenko
10/20/2025
Special inspection requirement — Heating Systems
Stanislav Pilipenko
10/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
10/20/2025
Special inspection requirement — Mechanical Systems
Stanislav Pilipenko
10/17/2025
Special inspection requirement — HVAC-R and service water heating system controls
Steven Savino
10/17/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Savino
10/17/2025
Special inspection requirement — HVAC-R and service water heating equipment
Steven Savino
10/16/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/23/2025
Filed — Alteration
Installation of New VRF System, ERV, & Replacement of Existing Boiler in Conjunction with S00961234-I1 filing
S00961234-P1
09/12/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/03/2025
Special inspection requirement — Chimneys and vents
Stanislav Pilipenko
09/03/2025
Special inspection requirement — HVAC-R and service water heating equipment
Stanislav Pilipenko
09/03/2025
Special inspection requirement — Final
Stanislav Pilipenko
09/03/2025
Special inspection requirement — Energy Code Compliance Inspections
Stanislav Pilipenko
09/03/2025
Special inspection requirement — Mechanical Systems
Stanislav Pilipenko
09/03/2025
Special inspection requirement — Heating Systems
Stanislav Pilipenko
09/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
09/03/2025
Special inspection requirement — Ventilation and air distribution system
Stanislav Pilipenko
09/03/2025
Special inspection requirement — HVAC-R and service water heating system controls
Stanislav Pilipenko
09/03/2025
Special inspection requirement — Permanent certificate
Stanislav Pilipenko
09/03/2025
Special inspection requirement — Maintenance information
Stanislav Pilipenko
09/03/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Stanislav Pilipenko
08/20/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/28/2025
Permit issued — Mechanical Systems
S00961234-S1-MS
07/18/2025
Permit issued — Plumbing
S01251187-I1-PL
07/16/2025
Permit issued — General Construction
S01139294-I1-GC
07/09/2025
Filed — Alteration
Install new steel deck & steel pan stairs, new storefront, new windows and interior alterations to the first and second floors.
S01139294-I1
07/09/2025
Filed — Alteration
INSTALLATION OF GAS AND SANITARY PLUMBING WORK IN THE CELLAR SPACE AND ON THE FIRST AND SECOND FLOORS.
S01251187-I1
06/30/2025
Signed off — Alteration
APPLICATION FILED TO ERECT AN 8.0 FOOT HIGH PLYWOOD CONSTRUCTION FENCE AROUND PERIMETER OF PROPERTY IN CONJUNCTION WITH DEMOLISHON APPLICATION # S00847364-I1
S00961102-I1
05/12/2025
Signed off — Alteration
S01173482-I1
05/08/2025
Signed off — Alteration
S01195333-I1
05/08/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/10/2025
Permit issued — Plumbing
S01173482-I1-PL
04/09/2025
Permit issued — General Construction
S01195333-I1-GC-CX
03/18/2025
Filed — Alteration
S01195333-I1
01/29/2025
Filed — Alteration
S01173482-I1
12/13/2024
Permit issued — Construction Fence
S00961102-I1-FN
02/22/2024
Objection resolved — Addressed
02/14/2024
Objection raised — Scope
01/29/2024
Filed — Alteration
Installation of New VRF System, ERV, & Replacement of Existing Boiler in Conjunction with S00961234-I1 filing
S00961234-S1
Latest 60 of 96 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutPermit IssuedA BIANCO LANDSCAPING INC02/05/2026
DOB NOWMechanical SystemsSigned-offRELIABLE HEATING AND COOL07/28/2025
DOB NOWPlumbingSigned-offCAPITAL CONTR P&H CORP07/18/2025
DOB NOWGeneral ConstructionSigned-offA BIANCO LANDSCAPING INC07/16/2025
DOB NOWPlumbingSigned-offCAPITAL CONTR P&H CORP04/10/2025
DOB NOWGeneral ConstructionSigned-offA BIANCO LANDSCAPING INC04/09/2025
DOB NOWConstruction FenceSigned-offA BIANCO LANDSCAPING INC12/13/2024
1 project · most recent 09/23/2025
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/23/2025Signed-offRELIABLE HEATING AND COOLAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Goodman GOODMAN GLXS3BN4810 43,900 BTU · Split System ×4
GOODMAN GLXS3BN3610 33,000 BTU · Split System ×2
Heating
Goodman GOODMAN CAPTA6030C3 100,000 BTU · Furnace ×2
GOODMAN CAPTA3626B3 80,000 BTU · Furnace ×1
Ventilation
N/A N/A 265 CFM · Ductwork ×3
1 project · most recent 11/16/2023
Gas Water/Sanitary
FiledStatusContractorScope
11/16/2023——Gas, Water/Sanitary
5 projects · most recent 12/06/2024
General Wiring
FiledStatusContractorScope
12/06/2024CompleteMANGI ELECTRICAL CORPGeneral Wiring
12/05/2024CancelledMANGI ELECTRICAL CORPGeneral Wiring
04/24/2024CompleteMANGI ELECTRICAL CORPGeneral Wiring
04/19/2023CompleteANCO ELECTL CONTCTNG INCGeneral Wiring
04/04/2023CompleteANCO ELECTL CONTCTNG INCGeneral Wiring
2 projects · most recent 11/16/2023
Fence
FiledStatusContractorScope
11/16/2023——Fence
06/09/2023——Fence
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
05/20/2026Pass-Final Curb Cut WithdrawalPassView ↗
11/13/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/16/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/12/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/20/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/08/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
12/19/2025HVAC-R and service water heating system controlsSteven Savinoenergy_progress
12/19/2025HVAC-R and service water piping design and insulationSteven Savinoenergy_progress
12/19/2025HVAC-R and service water heating equipmentSteven Savinoenergy_progress
10/20/2025HVAC-R and service water heating equipmentStanislav Pilipenkoenergy_progress
10/20/2025HVAC-R and service water piping design and insulationStanislav Pilipenkoenergy_progress
10/20/2025Maintenance informationStanislav Pilipenkoenergy_progress
10/20/2025Permanent certificateStanislav Pilipenkoenergy_progress
10/20/2025HVAC-R and service water heating system controlsStanislav Pilipenkoenergy_progress
10/20/2025Ventilation and air distribution systemStanislav Pilipenkoenergy_progress
10/20/2025FinalStanislav Pilipenkoprogress
10/20/2025Energy Code Compliance InspectionsStanislav Pilipenkoprogress
10/20/2025Chimneys and ventsStanislav Pilipenkospecial
10/20/2025Heating SystemsStanislav Pilipenkospecial
10/20/2025Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
10/20/2025Mechanical SystemsStanislav Pilipenkospecial
10/17/2025HVAC-R and service water heating system controlsSteven Savinoenergy_progress
10/17/2025HVAC-R and service water piping design and insulationSteven Savinoenergy_progress
10/17/2025HVAC-R and service water heating equipmentSteven Savinoenergy_progress
09/03/2025Chimneys and ventsStanislav Pilipenkospecial
09/03/2025HVAC-R and service water heating equipmentStanislav Pilipenkoenergy_progress
09/03/2025FinalStanislav Pilipenkoprogress
09/03/2025Energy Code Compliance InspectionsStanislav Pilipenkoprogress
09/03/2025Mechanical SystemsStanislav Pilipenkospecial
09/03/2025Heating SystemsStanislav Pilipenkospecial
09/03/2025Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
Latest 25 of 36.
▾Documents — 46 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/23/2026S00878897-I1Request digital key ↗
08/20/2026S01173482-I1Request digital key ↗
08/19/2026S01195333-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications29
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/17/2026S01251187-I1Open ↗
08/17/2026S01251187-P1Open ↗
08/17/2026S01337076-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
09/01/2026S00961234-P1Open ↗
09/01/2026S00961234-P1Open ↗
09/01/2026S00961234-S1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026S00961234-P1Open ↗
09/01/2026S00961234-S1Open ↗
08/28/2026S01195333-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/17/2026S01251187-P1Open ↗
08/17/2026S01251187-I1Open ↗
08/13/2026S01251187-P2Open ↗
Showing 3 of 6 on file for this type
▸Other Documents1
▸DOB NOWPro Cert Restriction Exception (LL158/17)1
08/13/2026S00878897-I1Open ↗