← Back
One story - permanent living quarter
237 THORNYCROFT AVENUE
STATEN ISLAND · BIN 5067922
💬 Discuss this project
1955Year Built
1Stories
A2Building Class
R3AZoning
900 sfGross Floor Area
1Units
One story - permanent living quarter · 4,500 sf lot · 0.2 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JAMES A CLANCY204/25/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARC DESIGN CONSULTING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AMBER ELECTL CONTNG INCElectrical103/22/2026
FICAZZOLA CONSULTING LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ETRECTE LLC8116204/25/2024
Building Lifecycle
All (14)Filed (2)Permit Issued (1)Signed Off (1)Special Inspection (10)
04/29/2024
Signed off — Alteration
INSTALLATION OF SOLAR PV SYSTEM ON THE EXISITING ROOFTOP. NO CHANGES TO THE EGRESS, USE OR OCCUPANCY.
S01012437-I1
04/26/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
VYACHESLAV NECHAYEV
04/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
VYACHESLAV NECHAYEV
04/26/2024
Special inspection requirement — Energy Code Compliance Inspections
James Clancy
04/26/2024
Special inspection requirement — Final
James Clancy
04/26/2024
Special inspection requirement — Air barrier - visual inspection
James Clancy
04/25/2024
Filed — Alteration
INSTALLATION OF SOLAR PV SYSTEM ON THE EXISITING ROOFTOP. NO CHANGES TO THE EGRESS, USE OR OCCUPANCY.
S01012437-P1
04/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
VYACHESLAV NECHAYEV
04/25/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
VYACHESLAV NECHAYEV
04/25/2024
Special inspection requirement — Energy Code Compliance Inspections
James Clancy
04/25/2024
Special inspection requirement — Final
James Clancy
04/25/2024
Special inspection requirement — Air barrier - visual inspection
James Clancy
03/07/2024
Permit issued — Solar
S01012437-I1-SL
02/29/2024
Filed — Alteration
INSTALLATION OF SOLAR PV SYSTEM ON THE EXISITING ROOFTOP. NO CHANGES TO THE EGRESS, USE OR OCCUPANCY.
S01012437-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offFICAZZOLA CONSULTING03/07/2024
2 projects · most recent 05/04/2024
FiledStatusContractorScope
05/04/2024CompleteAMBER ELECTL CONTNG INC1 meters
02/27/2024CompleteAMBER ELECTL CONTNG INC—
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
04/26/2024Structural Stability – Alterations of existing buildingsVYACHESLAV NECHAYEVspecial
04/26/2024Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
04/26/2024Energy Code Compliance InspectionsJames Clancyprogress
04/26/2024FinalJames Clancyprogress
04/26/2024Air barrier - visual inspectionJames Clancyenergy_progress
04/25/2024Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
04/25/2024Structural Stability – Alterations of existing buildingsVYACHESLAV NECHAYEVspecial
04/25/2024Energy Code Compliance InspectionsJames Clancyprogress
04/25/2024FinalJames Clancyprogress
04/25/2024Air barrier - visual inspectionJames Clancyenergy_progress
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/21/2026S01012437-P1Request digital key ↗
08/21/2026S01012437-I1Request digital key ↗
▸Seals & Professional Certifications10
▸DOB NOWProgress Inspector Seal & Signature6
09/30/2026S01012437-I1Open ↗
09/30/2026S01012437-I1Open ↗
09/30/2026S01012437-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/21/2026S01012437-I1Open ↗
08/13/2026S01012437-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/30/2026S01012437-I1Open ↗
08/27/2026S01012437-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/21/2026S01012437-I1Open ↗
08/13/2026S01012437-P1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01012437-I1Open ↗