← Back
City residence, one family
237 WYCKOFF STREET
BROOKLYN · BIN 3005940
💬 Discuss this project
1872Year Built
2Stories
A4Building Class
R6BZoning
2,125 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
City residence, one family · Owner of record: THE WYCKOFF TRUST BY ANTHONY BONSIGNORE AS CO-TRU · 1,667 sf lot · 1.27 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbing
Roof8p · 3 filings · 20 docs
Floor 51p · 1 filing · 20 docs
Floor 4
Floor 3
Floor 28p · 3 filings · 20 docs
Floor 13p · 2 filings · 20 docs
Cellar14p · 3 filings · 20 docs
Basement6p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
THE WYCKOFF TRUST803/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ANZALONE ARCHITECTURE2203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUPREME GEN.CONTR INCGeneral Contractor1407/08/2026
SAIT XHELILIElectrical603/21/2026
A R ELECL CONTRG INC 003357General Contractor603/22/2026
EH PLUMBING & HEATING CORPlumbing607/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ADJ ENGINEERING PLLC7640412/23/2022
BEN HERZOG ARCHITECT, PC1544312/22/2022
CELIN MUNOZ CONSULTING EN1064612/22/2022
Building Lifecycle
All (82)Filed (11)Permit Issued (12)Signed Off (6)Violation (1)Inspection (6)Objection (16)Special Inspection (30)
11/17/2025
Signed off — Alteration
Relocate boiler and hot water heater and install new plumbing fixtures in conjunction with renovation of 1 family residence. No change in use, occupancy or egress.
B00517032-I1
01/31/2024
Signed off — Alteration
CONSTRUCT NEW BENCH FOOTING AND SLAB ON GRADE.
B00517029-I1
01/31/2024
Signed off — Alteration
B00517031-I1
01/25/2024
Signed off — Alteration
INTERIOR RENOVATION TO INCLUDE REMOVAL & INSTALLATION OF LOAD AND NON-LOAD BEARING PARTITIONS RELATING TO INTERIOR LAYOUT CHANGES. REPLACE DOORS AND WINDOWS. CELLAR EXCAVATION. NEW DECK ON ROOF AND RAISED REAR PATIO.
B00470051-I1
01/16/2024
Signed off — Alteration
B00517039-I1
01/12/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/14/2023
Signed off — Alteration
B00517035-I1
03/28/2023
Permit issued — Plumbing
B00517032-I1-PL
02/09/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
02/06/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/27/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Celin Munoz
12/27/2022
Special inspection requirement — Fire-Resistance Rated Construction
Benjamin Herzog
12/27/2022
Special inspection requirement — Energy Code Compliance Inspections
Benjamin Herzog
12/27/2022
Special inspection requirement — Final
Benjamin Herzog
12/27/2022
Special inspection requirement — Interior lighting power
Benjamin Herzog
12/27/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Benjamin Herzog
12/27/2022
Special inspection requirement — Insulation placement and R values
Benjamin Herzog
12/27/2022
Special inspection requirement — Air barrier - visual inspection
Benjamin Herzog
12/27/2022
Special inspection requirement — Permanent certificate
Benjamin Herzog
12/27/2022
Special inspection requirement — Protection of exposed foundation insulation
Benjamin Herzog
12/27/2022
Special inspection requirement — Fenestration air leakage
Benjamin Herzog
12/27/2022
Special inspection requirement — Fenestration areas
Benjamin Herzog
12/27/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Dwayne Williams
12/27/2022
Special inspection requirement — Maintenance information
Dwayne Williams
12/27/2022
Special inspection requirement — Permanent certificate
Dwayne Williams
12/27/2022
Special inspection requirement — HVAC-R and service water heating system controls
Dwayne Williams
12/27/2022
Special inspection requirement — HVAC-R and service water heating equipment
Dwayne Williams
12/27/2022
Special inspection requirement — Energy Code Compliance Inspections
Oswin Fairweather
12/27/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Benjamin Herzog
12/23/2022
Filed — Alteration
Relocate boiler and hot water heater and install new plumbing fixtures in conjunction with renovation of 1 family residence. No change in use, occupancy or egress.
B00517032-P2
12/22/2022
Filed — Alteration
INTERIOR RENOVATION TO INCLUDE REMOVAL & INSTALLATION OF LOAD AND NON-LOAD BEARING PARTITIONS RELATING TO INTERIOR LAYOUT CHANGES. REPLACE DOORS AND WINDOWS. CELLAR EXCAVATION. NEW DECK ON ROOF AND RAISED REAR PATIO.
B00470051-P2
12/20/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Celin Munoz
12/20/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Benjamin Herzog
12/20/2022
Special inspection requirement — Energy Code Compliance Inspections
Benjamin Herzog
12/20/2022
Special inspection requirement — Final
Benjamin Herzog
12/20/2022
Special inspection requirement — Fire-Resistance Rated Construction
Benjamin Herzog
12/20/2022
Special inspection requirement — Permanent certificate
Benjamin Herzog
12/20/2022
Special inspection requirement — Fenestration areas
Benjamin Herzog
12/20/2022
Special inspection requirement — Fenestration air leakage
Benjamin Herzog
12/20/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Benjamin Herzog
12/20/2022
Special inspection requirement — Insulation placement and R values
Benjamin Herzog
12/20/2022
Special inspection requirement — Interior lighting power
Benjamin Herzog
10/31/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/31/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/04/2022
Filed — Alteration
Relocate boiler and hot water heater and install new plumbing fixtures in conjunction with renovation of 1 family residence. No change in use, occupancy or egress.
B00517032-P1
09/26/2022
Objection resolved — Addressed
09/25/2022
Objection raised — Other
09/22/2022
Filed — Alteration
INTERIOR RENOVATION TO INCLUDE REMOVAL & INSTALLATION OF LOAD AND NON-LOAD BEARING PARTITIONS RELATING TO INTERIOR LAYOUT CHANGES. REPLACE DOORS AND WINDOWS. CELLAR EXCAVATION. NEW DECK ON ROOF AND RAISED REAR PATIO.
B00470051-P1
08/11/2022
Permit issued — Structural
B00517031-I1-ST
08/11/2022
Permit issued — Mechanical Systems
B00517035-I1-MS
08/11/2022
Permit issued — General Construction
B00470051-I1-GC
08/11/2022
Permit issued — Earth Work
B00517029-I1-FO-EA
08/11/2022
Permit issued — Construction Fence
B00517039-I1-FN
07/06/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/30/2022
Violation issued (ECB, closed)
Construction
03/11/2022
Permit issued — Plumbing
B00517032-I1-PL
01/24/2022
Permit issued — Foundation
B00517029-I1-FO-EA
01/13/2022
Objection resolved — Addressed
01/11/2022
Objection raised — Inspections
01/04/2022
Filed — Alteration
CONSTRUCT NEW BENCH FOOTING AND SLAB ON GRADE.
B00517029-P1
Latest 60 of 82 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offEH PLUMBING & HEATING COR03/28/2023
DOB NOWStructuralSigned-offSUPREME GEN.CONTR INC08/11/2022
DOB NOWMechanical SystemsSigned-offSUPREME GEN.CONTR INC08/11/2022
DOB NOWGeneral ConstructionSigned-offSUPREME GEN.CONTR INC08/11/2022
DOB NOWEarth WorkSigned-offSUPREME GEN.CONTR INC08/11/2022
DOB NOWConstruction FenceSigned-offSUPREME GEN.CONTR INC08/11/2022
DOB NOWPlumbingSigned-offEH PLUMBING & HEATING COR03/11/2022
DOB NOWFoundationSigned-offSUPREME GEN.CONTR INC01/24/2022
DOB NOWConstruction FenceSigned-offSUPREME GEN.CONTR INC01/04/2022
DOB NOWGeneral ConstructionSigned-offSUPREME GEN.CONTR INC01/04/2022
DOB NOWStructuralSigned-offSUPREME GEN.CONTR INC01/04/2022
DOB NOWMechanical SystemsSigned-offSUPREME GEN.CONTR INC01/04/2022
1 project · most recent 08/09/2023
General Wiring
FiledStatusContractorScope
08/09/2023CompleteA & R ELEC'L CONTR'G INC.General Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
01/12/2024Pass-Final General Construction Non-Directive 14PassView ↗
02/09/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/06/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/31/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/31/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/06/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 50
DateRequirementInspectorRole
12/27/2022Structural Stability – Alterations of existing buildingsCelin Munozspecial
12/27/2022Fire-Resistance Rated ConstructionBenjamin Herzogprogress
12/27/2022Energy Code Compliance InspectionsBenjamin Herzogprogress
12/27/2022FinalBenjamin Herzogprogress
12/27/2022Interior lighting powerBenjamin Herzogenergy_progress
12/27/2022Fenestration and door U-factor and product ratingsBenjamin Herzogenergy_progress
12/27/2022Insulation placement and R valuesBenjamin Herzogenergy_progress
12/27/2022Air barrier - visual inspectionBenjamin Herzogenergy_progress
12/27/2022Permanent certificateBenjamin Herzogenergy_progress
12/27/2022Protection of exposed foundation insulationBenjamin Herzogenergy_progress
12/27/2022Fenestration air leakageBenjamin Herzogenergy_progress
12/27/2022Fenestration areasBenjamin Herzogenergy_progress
12/27/2022Fire-Resistant Penetrations and JointsDwayne Williamsspecial
12/27/2022Maintenance informationDwayne Williamsenergy_progress
12/27/2022Permanent certificateDwayne Williamsenergy_progress
12/27/2022HVAC-R and service water heating system controlsDwayne Williamsenergy_progress
12/27/2022HVAC-R and service water heating equipmentDwayne Williamsenergy_progress
12/27/2022Energy Code Compliance InspectionsOswin Fairweatherprogress
12/27/2022Fire-Resistant Penetrations and JointsBenjamin Herzogspecial
12/20/2022Structural Stability – Alterations of existing buildingsCelin Munozspecial
12/20/2022Fire-Resistant Penetrations and JointsBenjamin Herzogspecial
12/20/2022Energy Code Compliance InspectionsBenjamin Herzogprogress
12/20/2022FinalBenjamin Herzogprogress
12/20/2022Fire-Resistance Rated ConstructionBenjamin Herzogprogress
12/20/2022Permanent certificateBenjamin Herzogenergy_progress
Latest 25 of 50.
▾Documents — 110 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch8
09/01/2026B00517035-I1Request digital key ↗
09/01/2026B00517031-I1Request digital key ↗
09/01/2026B00517039-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - General Construction3
09/01/2026B00470051-P1Request digital key ↗
09/01/2026B00470051-P2Request digital key ↗
08/14/2026B00470051-I1Request digital key ↗
▸Applications & Permits10
▸DOB NOWLPC Approval/Permit8
08/13/2026B00517031-I1Open ↗
08/13/2026B00470051-P2Open ↗
08/13/2026B00517032-I1Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION2
12/05/2014321036730Open ↗
11/28/2014321036730Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWRestrictive Declaration/Easement 16
08/13/2026B00517032-P2Open ↗
08/13/2026B00517032-I1Open ↗
08/13/2026B00517032-P1Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications63
▸DOB NOWProgress Inspector Seal & Signature40
08/27/2026B00517032-I1Open ↗
08/27/2026B00517032-I1Open ↗
08/27/2026B00517032-I1Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/01/2026B00470051-P2Open ↗
09/01/2026B00470051-I1Open ↗
09/01/2026B00470051-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
08/27/2026B00517032-I1Open ↗
08/27/2026B00517029-I1Open ↗
08/27/2026B00517029-I1Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
11/28/2014321036730Open ↗
11/28/2014321036730Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
11/28/2014321036730Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
11/28/2014321036730Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
09/01/2026B00517035-I1Open ↗
09/01/2026B00517031-I1Open ↗
08/28/2026B00517032-I1Open ↗
Showing 3 of 5 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
01/20/2015321036730Open ↗
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026B00517035-I1Open ↗
08/13/2026B00517032-I1Open ↗
08/13/2026B00470051-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/15/2026B00517029-I1Open ↗
08/13/2026B00517029-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00517029-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026B00517029-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
11/28/2014321036730Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
11/28/2014321036730Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET1
11/28/2014321036730Open ↗
▸BISeFiling Job Application Cover Sheet1
12/05/2014321036730Open ↗
▸Other Documents1
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00517029-I1Open ↗