DOB11/08/2019VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
DOB04/06/2018VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
DOB02/24/2017VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
DOB10/01/2015VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
DOB03/03/2015VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
DOB05/15/2014VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
DOB03/01/2013VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
DOB12/31/2009V-DOB VIOLATION - ACTIVE
DOB01/01/2009V-DOB VIOLATION - ACTIVE
DOB01/03/2008V-DOB VIOLATION - ACTIVE
DOB01/19/2007V-DOB VIOLATION - ACTIVE
DOB02/13/2004V-DOB VIOLATION - ACTIVE
DOB04/23/1993V-DOB VIOLATION - ACTIVE
ECB02/09/2003FAILURE TO PROVIDE FIRE STOPPING WHERE NEEDED NOTED BASEMENT CEILING JOISTS AT 80% ARE EXPOSED WITH NO FIRE STOPPING REMEDY; PROIVDE FIRE STOPPING WHERE NEEDED.Nothing owed — awaiting certificate of correction
ECB02/09/2003FAILURE TO MAINTAIN NOTED: ON FIRST FLOOR JOISTS DANAGED BY PREVIOUS FIRE HAVE BEEN REPAIRED INADEQUATELY THE TECO'S USED ARE NOT THE RIGHTIS AND CRIBBING IN NEMBEROUS AREA TOTALLY INADEQUATE ALSO FLOORING ROTTNothing owed — awaiting certificate of correction