Four families
2379 84 STREET
BROOKLYN · BIN 3185154
💬 Discuss this project
1924Year Built
3Stories
C3Building Class
R5Zoning
2,880 sfGross Floor Area
4Units
Rent Stabilized20 Open Violations ▸FDNY Report ↗
Four families · Owner of record: 8324 24TH AVE LLC · 6,000 sf lot · 0.48 FAR built · Flood zone X500
Locations of Work
ArchitectureElectricalPlumbingFire ProtectionGeneral
Roof12p · 1 filing · 20 docs
Floor 312p · 1 filing · 20 docs
Floor 212p · 1 filing · 20 docs
Floor 112p · 1 filing · 20 docs
Cellar12p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
STELLAR CONTRACTING5307/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/14/2024$1.9M—— → —$653/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DESIGN STUDIO ASSOCIATES1306/11/2026
COPE CONSULTING SERVICES GROUP LLC210/11/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DESIGN STUDIO ASSOCIATES1303/21/2026
LARGIME MUJOVIC103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STELLAR CONTRACTING LLCGeneral Contractor1007/08/2026
A.G.M. PLBG & HTG, INCFire Protection107/08/2026
PAUL TOTH EXCAVATION INCGeneral Contractor104/09/2026
A.G.M. P & H INCPlumbing107/08/2026
WATER WORKS PIPING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
REGIONAL TESTING CORP.3941006/11/2026
COPE CONSULTING SERVICES7959210/11/2024
HRF SERVICES CORP5616106/18/2024
Building Lifecycle
All (155)Filed (16)Permit Issued (13)Signed Off (8)Violation (34)Inspection (17)Objection (34)Special Inspection (30)Tax Incentive (3)
08/12/2026
Signed off — New Building
INSTALLATION OF PLUMBING SYSTEMS AS PER PLANS FILED HEREWITH
B01008532-I1
08/06/2026
Special inspection requirement — Masonry
Paul Raymond
08/06/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Paul Raymond
08/06/2026
Special inspection requirement — Fenestration areas
Paul Raymond
08/06/2026
Special inspection requirement — Fenestration air leakage
Paul Raymond
08/06/2026
Special inspection requirement — Insulation placement and R values
Paul Raymond
08/06/2026
Special inspection requirement — Maintenance information
Paul Raymond
08/06/2026
Special inspection requirement — Permanent certificate
Paul Raymond
08/06/2026
Special inspection requirement — Interior lighting power
Paul Raymond
08/06/2026
Special inspection requirement — Electric vehicle service equipment requirements
Paul Raymond
08/06/2026
Special inspection requirement — Air barrier — testing
Paul Raymond
08/06/2026
Special inspection requirement — Protection of exposed foundation insulation
Paul Raymond
08/06/2026
Special inspection requirement — Air barrier - visual inspection
Paul Raymond
08/06/2026
Special inspection requirement — Metering
Paul Raymond
08/06/2026
Special inspection requirement — Fire-Resistance Rated Construction
Paul Raymond
08/06/2026
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
08/06/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Paul Raymond
08/06/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
BRIAN FLYNN
08/06/2026
Special inspection requirement — Subgrade Inspections
Paul Raymond
08/06/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Paul Raymond
08/06/2026
Special inspection requirement — Concrete - Cast-In-Place
Paul Raymond
08/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
07/20/2026
Objection resolved — Addressed
06/30/2026
Objection raised — Scope
06/11/2026
Filed — New Building
INSTALLATION OF PLUMBING SYSTEMS AS PER PLANS FILED HEREWITH
B01008532-P8
06/11/2026
Special inspection requirement — Air barrier — testing
Paul Raymond
06/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
06/11/2026
Special inspection requirement — Masonry
Paul Raymond
06/11/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Paul Raymond
06/11/2026
Special inspection requirement — Subgrade Inspections
Paul Raymond
06/11/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
BRIAN FLYNN
06/11/2026
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
06/11/2026
Special inspection requirement — Fire-Resistance Rated Construction
Paul Raymond
06/11/2026
Special inspection requirement — Air barrier - visual inspection
Paul Raymond
05/14/2026
Signed off — New Building
INSTALLATION OF PLUMBING SYSTEMS AS PER PLANS FILED HEREWITH
B01008532-S1
04/17/2026
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
04/16/2026
Signed off — New Building
INSTALLATION OF PLUMBING SYSTEMS AS PER PLANS FILED HEREWITH
B01008532-S2
04/08/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/24/2026
Signed off — New Building
INSTALLATION OF PLUMBING SYSTEMS AS PER PLANS FILED HEREWITH
B01008532-S5
03/23/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
03/02/2026
Signed off — New Building
INSTALLATION OF PLUMBING SYSTEMS AS PER PLANS FILED HEREWITH
B01008532-S4
02/27/2026
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
02/27/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
02/25/2026
Permit issued — Curb Cut
B01008532-S5-CC
02/25/2026
Permit issued — Curb Cut
B01008532-S4-CC
02/12/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/05/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/28/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/28/2026
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
01/12/2026
Signed off — Alteration
Temporary Construction Fence
B00996663-I1
12/05/2025
Objection raised — Scope
12/05/2025
Objection resolved — Addressed
11/25/2025
Filed — New Building
INSTALLATION OF PLUMBING SYSTEMS AS PER PLANS FILED HEREWITH
B01008532-P5
11/18/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/04/2025
Filed — New Building
INSTALLATION OF PLUMBING SYSTEMS AS PER PLANS FILED HEREWITH
B01008532-P7
11/04/2025
Filed — New Building
INSTALLATION OF PLUMBING SYSTEMS AS PER PLANS FILED HEREWITH
B01008532-P6
11/01/2025
485-x construction completed
09/16/2025
Signed off — New Building
INSTALLATION OF PLUMBING SYSTEMS AS PER PLANS FILED HEREWITH
B01008532-S3
08/29/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/14/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
Latest 60 of 155 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offSTELLAR CONTRACTING LLC02/25/2026
DOB NOWCurb CutSigned-offSTELLAR CONTRACTING LLC02/25/2026
DOB NOWGeneral ConstructionPermit IssuedSTELLAR CONTRACTING LLC06/26/2025
DOB NOWGeneral ConstructionPermit IssuedSTELLAR CONTRACTING LLC05/07/2025
DOB NOWSprinklersSigned-offA.G.M. PLBG & HTG, INC05/05/2025
DOB NOWConstruction FenceSigned-offSTELLAR CONTRACTING LLC03/24/2025
DOB NOWPlumbingSigned-offSUPERIOR PIPING&MECH CORP02/06/2025
DOB NOWPlumbingSigned-offA.G.M. P & H INC11/20/2024
DOB NOWSupport of ExcavationSigned-offSTELLAR CONTRACTING LLC10/08/2024
DOB NOWGeneral ConstructionPermit IssuedSTELLAR CONTRACTING LLC08/23/2024
DOB NOWGeneral ConstructionPermit IssuedSTELLAR CONTRACTING LLC07/09/2024
DOB NOWFull DemolitionSigned-offPAUL TOTH EXCAVATION INC04/03/2024
DOB NOWConstruction FenceSigned-offSTELLAR CONTRACTING LLC03/26/2024
1 project · most recent 06/11/2026
Sprinkler System
FiledStatusContractorScope
06/11/2026Signed-offA.G.M. PLBG & HTG, INCSprinkler System
1 project · most recent 06/11/2026
Storm Water/Sanitary
FiledStatusContractorScope
06/11/2026Signed-offA.G.M. P & H INCStorm, Water/Sanitary
2 projects · most recent 12/18/2025
General Wiring
FiledStatusContractorScope
12/18/2025CompleteAROUND ELECTRIC CORP.General Wiring
08/02/2024CompleteAROUND ELECTRIC CORP.General Wiring
1 project · most recent 06/11/2026
FiledStatusContractorScope
06/11/2026Signed-offSTELLAR CONTRACTING LLC2 scope_items
▾Field Inspections (DOB CAP) — 17
DateTypeResultReport
04/17/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
04/08/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/23/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
02/27/2026Fail-Final Curb Cut Non-Directive 14FailView ↗
02/27/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
02/12/2026Pass-Final CND-Occupancy InspectionPassView ↗
02/05/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/28/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/28/2026Certified Sprinkler - SP - RoughingCertifiedView ↗
11/18/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/29/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/14/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
07/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/11/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/28/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/28/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/28/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 60
DateRequirementInspectorRole
08/06/2026MasonryPaul Raymondspecial
08/06/2026Fenestration and door U-factor and product ratingsPaul Raymondenergy_progress
08/06/2026Fenestration areasPaul Raymondenergy_progress
08/06/2026Fenestration air leakagePaul Raymondenergy_progress
08/06/2026Insulation placement and R valuesPaul Raymondenergy_progress
08/06/2026Maintenance informationPaul Raymondenergy_progress
08/06/2026Permanent certificatePaul Raymondenergy_progress
08/06/2026Interior lighting powerPaul Raymondenergy_progress
08/06/2026Electric vehicle service equipment requirementsPaul Raymondenergy_progress
08/06/2026Air barrier — testing Paul Raymondenergy_progress
08/06/2026Protection of exposed foundation insulationPaul Raymondenergy_progress
08/06/2026Air barrier - visual inspectionPaul Raymondenergy_progress
08/06/2026MeteringPaul Raymondenergy_progress
08/06/2026Fire-Resistance Rated ConstructionPaul Raymondprogress
08/06/2026Energy Code Compliance InspectionsPaul Raymondprogress
08/06/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPaul Raymondspecial
08/06/2026Subsurface Investigations (Borings/Test Pits)BRIAN FLYNNspecial
08/06/2026Subgrade InspectionsPaul Raymondspecial
08/06/2026Exterior Insulation and Finish Systems (EIFS)Paul Raymondspecial
08/06/2026Concrete - Cast-In-PlacePaul Raymondspecial
08/06/2026Fire-Resistant Penetrations and JointsPaul Raymondspecial
06/11/2026Air barrier — testing Paul Raymondenergy_progress
06/11/2026Fire-Resistant Penetrations and JointsPaul Raymondspecial
06/11/2026MasonryPaul Raymondspecial
06/11/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPaul Raymondspecial
Latest 25 of 60.
▾Documents — 159 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
08/26/2026B00976902-I1Request digital key ↗
08/25/2026B00996663-I1Request digital key ↗
08/20/2026B01008532-P7Request digital key ↗
Showing 3 of 16 on file for this type
▸Applications & Permits1
▸BISBPP-5 - Authorization to the Department of Transportation1
02/07/2025340909379Open ↗
▸Zoning, Tax Lot & Property Records11
▸DOB NOWZD1: DOB Zoning Diagram5
08/14/2026B01008532-P8Open ↗
08/13/2026B01008532-P5Open ↗
08/13/2026B01008532-P3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/14/2026B01008532-P8Open ↗
08/13/2026B01008532-P5Open ↗
08/13/2026B01008532-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01008532-I1Open ↗
▸Seals & Professional Certifications78
▸DOB NOWProgress Inspector Seal & Signature31
09/02/2026B01008532-P7Open ↗
09/01/2026B01008532-S1Open ↗
09/01/2026B01008532-I1Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature29
09/02/2026B01008532-P7Open ↗
09/02/2026B01008532-P7Open ↗
09/02/2026B01008532-P7Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/20/2026B01008532-P7Open ↗
08/20/2026B01008532-S3Open ↗
08/20/2026B01008532-P1Open ↗
Showing 3 of 15 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
02/07/2025340909379Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
02/07/2025340909379Open ↗
▸DOB NOWCONTRACTOR SEAL & SIGNATURE1
08/13/2026B00976902-I1Open ↗
▸Trade Schedules & Equipment8
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/13/2026B01008532-P2Open ↗
08/13/2026B01008532-P5Open ↗
08/13/2026B01008532-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWElectric Cut-Off1
08/13/2026B00976902-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026B00976902-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026B00976902-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026B00976902-I1Open ↗
▸Safety & Tenant Protection11
▸DOB NOWStreet Tree Checklist5
08/14/2026B01008532-P8Open ↗
08/13/2026B01008532-P3Open ↗
08/13/2026B01008532-P2Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
02/07/2025340909379Open ↗
▸BISBPP: STREET TREES SITE PLAN1
02/07/2025340909379Open ↗
▸BISSTREET TREE CHECKLIST1
02/07/2025340909379Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B01008532-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B01008532-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/20/2026B01008532-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/26/2026B00976902-I1Open ↗
▸DOB NOWRodent Control1
08/13/2026B00976902-I1Open ↗
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT5
08/14/2026B01008532-P8Open ↗
08/13/2026B01008532-P3Open ↗
08/13/2026B01008532-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B01008532-I1Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
01/30/2025340909379Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
02/07/2025340909379Open ↗
▸Other Documents24
▸DOB NOWProperty Ownership Certification6
08/26/2026B00976902-I1Open ↗
08/20/2026B01008532-I1Open ↗
08/20/2026B01008532-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSite Survey: Initial5
08/14/2026B01008532-P8Open ↗
08/13/2026B01008532-P5Open ↗
08/13/2026B01008532-P3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/14/2026B01008532-P8Open ↗
08/13/2026B01008532-I1Open ↗
08/13/2026B01008532-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWFinal Survey2
08/20/2026B01008532-I1Open ↗
08/13/2026B01008532-I1Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
02/07/2025340909379Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
02/07/2025340909379Open ↗
▸DOB NOWStructure Photographs1
08/13/2026B00976902-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026B00976902-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B01008532-S3Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026B00976902-I1Open ↗