Miscellaneous warehouse
238 CONOVER STREET
BROOKLYN · BIN 3008773
💬 Discuss this project
1960Year Built
2Stories
E9Building Class
M2-1Zoning
17,900 sfGross Floor Area
2Units
1 Open Violation ▸
Miscellaneous warehouse · Owner of record: 238 CONOVER STREET, LLC · 12,800 sf lot · 1.4 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalFire Protection
Roof7p · 1 filing · 20 docs
Floor 29p · 2 filings · 20 docs
Floor 15p · 1 filing · 20 docs
Mezzanine5p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
238 CONOVER STREET1203/21/2026
ICB ENTERPRISE103/21/2026
POSHTOMATO103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/15/2022$8.0M—BUTTERMILK WAREHOUSE, LLC → 238 CONOVER STREET, LLC$447/sf building
11/20/2014$4.3M—— → —$243/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STUDIO WL ARCHITECTURE PLLC410/01/2024
SH ENGINEERING PLLC210/01/2024
ABS ENGINEERING, PLLC210/01/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC PERMITTING1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GLENWOOD CONSTRUCTION CORGeneral Contractor407/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AK ENGINEERING PC678510/01/2024
SH ENGINEERING PLLC7024310/01/2024
Building Lifecycle
All (58)Filed (8)Permit Issued (2)Signed Off (2)Violation (15)Inspection (1)Objection (4)Special Inspection (26)
08/14/2026
Signed off — Alteration
PROPOSED 'INTERIOR' DEMOLITION OF AN EXT'G MASONRY WAREHOUSE BLDG. WORK INVOLVES DEMOLITION OF AN EXT'G 1ST FLOOR MEZZANINE, INTERIOR PARTITIONS & PLUMBING FIXTURES. NO EXTERIOR WORK & NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00800888-S1
07/08/2026
Signed off — Alteration
PROPOSED 'INTERIOR' DEMOLITION OF AN EXT'G MASONRY WAREHOUSE BLDG. WORK INVOLVES DEMOLITION OF AN EXT'G 1ST FLOOR MEZZANINE, INTERIOR PARTITIONS & PLUMBING FIXTURES. NO EXTERIOR WORK & NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00800888-I1
10/10/2024
Special inspection requirement — HVAC-R and service water heating equipment
Ari Kamo
10/10/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Ari Kamo
10/10/2024
Special inspection requirement — HVAC-R and service water heating system controls
Ari Kamo
10/01/2024
Filed — Alteration CO
MECHANICAL MODIFICATIONS AND INSTALL OF EM GENERATOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00984119-S5
10/01/2024
Filed — Alteration CO
MECHANICAL MODIFICATIONS AND INSTALL OF EM GENERATOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00984119-S2
10/01/2024
Filed — Alteration CO
MECHANICAL MODIFICATIONS AND INSTALL OF EM GENERATOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00984119-S1
09/30/2024
Filed — Alteration CO
MECHANICAL MODIFICATIONS AND INSTALL OF EM GENERATOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00984119-S3
09/30/2024
Filed — Alteration CO
MECHANICAL MODIFICATIONS AND INSTALL OF EM GENERATOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00984119-S4
09/24/2024
Special inspection requirement — Structural Steel - High Strength Bolting
Shahriar Rafi
09/24/2024
Special inspection requirement — Structural Steel - Welding
Shahriar Rafi
09/24/2024
Special inspection requirement — Final
Shahriar Rafi
09/24/2024
Special inspection requirement — Maintenance information
Ari Kamo
09/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
09/24/2024
Special inspection requirement — Post-installed Anchors
Ari Kamo
09/24/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Shahriar Rafi
09/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
09/24/2024
Special inspection requirement — Structural Steel - Details
Shahriar Rafi
09/24/2024
Special inspection requirement — Post-installed Anchors
Shahriar Rafi
09/13/2024
Special inspection requirement — Post-installed Anchors
Ari Kamo
09/13/2024
Special inspection requirement — Energy Code Compliance Inspections
Ari Kamo
01/21/2024
Filed — Alteration CO
MECHANICAL MODIFICATIONS AND INSTALL OF EM GENERATOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00984119-I1
01/19/2024
Special inspection requirement — Interior lighting power
Ari Kamo
01/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
01/19/2024
Special inspection requirement — Energy Code Compliance Inspections
Ari Kamo
01/19/2024
Special inspection requirement — Fire-Resistance Rated Construction
Ari Kamo
01/19/2024
Special inspection requirement — Lighting controls
Ari Kamo
01/02/2024
Special inspection requirement — Sprinkler Systems
Ari Kamo
01/02/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Ari Kamo
08/10/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Permit issued — General Construction
B00800888-I1-GC
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/19/2023
Permit issued — Structural
B00800888-S1-ST
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/09/2023
Objection resolved — Addressed
02/09/2023
Objection resolved — Addressed
02/03/2023
Objection raised — Other
02/02/2023
Filed — Alteration
PROPOSED 'INTERIOR' DEMOLITION OF AN EXT'G MASONRY WAREHOUSE BLDG. WORK INVOLVES DEMOLITION OF AN EXT'G 1ST FLOOR MEZZANINE, INTERIOR PARTITIONS & PLUMBING FIXTURES. NO EXTERIOR WORK & NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00800888-S1
01/23/2023
Objection raised — Other
01/17/2023
Special inspection requirement — Final
Shahriar Rafi
01/17/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Shahriar Rafi
01/17/2023
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Shahriar Rafi
01/16/2023
Filed — Alteration
PROPOSED 'INTERIOR' DEMOLITION OF AN EXT'G MASONRY WAREHOUSE BLDG. WORK INVOLVES DEMOLITION OF AN EXT'G 1ST FLOOR MEZZANINE, INTERIOR PARTITIONS & PLUMBING FIXTURES. NO EXTERIOR WORK & NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00800888-I1
12/27/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Shahriar Rafi
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/28/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/27/2017
Violation issued (ECB, closed)
Construction
03/27/2017
Violation issued (ECB, closed)
Boilers
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/17/2014
Violation issued (ECB, closed)
Unknown
02/12/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/13/2013
Violation issued (ECB, closed)
Unknown
11/13/2013
Violation issued (ECB, closed)
Construction
06/01/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/16/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/01/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offGLENWOOD CONSTRUCTION COR06/20/2023
DOB NOWStructuralSigned-offGLENWOOD CONSTRUCTION COR06/19/2023
BISPLISSUEDCOLBREN PLBG & HTG INC05/15/2017
BISBLISSUEDCOLBREN PLBG & HTG INC05/15/2017
BISMHISSUEDV.C. VITANZA SONS INC10/21/2014
BISMHISSUEDR & L HTG. & AIR COND INC12/13/2011
BISMHISSUEDV.C VITANZA SONS INC11/09/2007
BISMHISSUEDTHERMO DYNAMICS12/08/1994
1 project · most recent 10/01/2024
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
10/01/2024——Heating and Air Conditioning Systems
Heat / Cool
Aaon AAON RN-008-8-0-EB09-3KB 3,600 CFM · Rooftop Unit ×1
AAON RN-010-8-0-K609-000 3,500 CFM · Rooftop Unit ×1
AAON RN-014-8-0-0000-34B 2,100 CFM · Rooftop Unit ×1
AAON RN-020-8-0-HB09-34B 3,700 CFM · Rooftop Unit ×1
Lg LG-VRF ARNU363SVA4 918 CFM · Vrf Indoor ×1
LG-VRF ARUN060GSS4 60,000 BTU · Vrf Outdoor ×1
LG-VRF ARNU243SKA4 537 CFM · Vrf Indoor ×1
Qmark HEX5-208360-10.0 850 CFM · Electric Heater ×1
HEX5-208360-5.0 500 CFM · Electric Heater ×1
HEX5-208360-7.5 850 CFM · Electric Heater ×1
1 project · most recent 10/01/2024
Water/Sanitary
FiledStatusContractorScope
10/01/2024——Water/Sanitary
2 projects · most recent 10/01/2024
Steel
FiledStatusContractorScope
10/01/2024——Steel
02/02/2023Signed-offGLENWOOD CONSTRUCTION COR1 scope_items
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
08/10/2023Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
10/10/2024HVAC-R and service water heating equipmentAri Kamoenergy_progress
10/10/2024HVAC-R and service water piping design and insulationAri Kamoenergy_progress
10/10/2024HVAC-R and service water heating system controlsAri Kamoenergy_progress
09/24/2024Structural Steel - High Strength BoltingShahriar Rafispecial
09/24/2024Structural Steel - WeldingShahriar Rafispecial
09/24/2024FinalShahriar Rafiprogress
09/24/2024Maintenance informationAri Kamoenergy_progress
09/24/2024Fire-Resistant Penetrations and JointsAri Kamospecial
09/24/2024Post-installed AnchorsAri Kamospecial
09/24/2024Structural Stability – Alterations of existing buildingsShahriar Rafispecial
09/24/2024Fire-Resistant Penetrations and JointsAri Kamospecial
09/24/2024Structural Steel - DetailsShahriar Rafispecial
09/24/2024Post-installed AnchorsShahriar Rafispecial
09/13/2024Post-installed AnchorsAri Kamospecial
09/13/2024Energy Code Compliance InspectionsAri Kamoprogress
01/19/2024Interior lighting powerAri Kamoenergy_progress
01/19/2024Fire-Resistant Penetrations and JointsAri Kamospecial
01/19/2024Energy Code Compliance InspectionsAri Kamoprogress
01/19/2024Fire-Resistance Rated ConstructionAri Kamoprogress
01/19/2024Lighting controlsAri Kamoenergy_progress
01/02/2024Sprinkler SystemsAri Kamospecial
01/02/2024Structural Stability – Alterations of existing buildingsAri Kamospecial
01/17/2023FinalShahriar Rafiprogress
01/17/2023Structural Stability – Alterations of existing buildingsShahriar Rafispecial
01/17/2023Construction Operations Influencing Adjacent StructuresShahriar Rafispecial
Latest 25 of 26.
▾Documents — 136 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/24/2026B00984119-I1Request digital key ↗
08/24/2026B00984119-S7Request digital key ↗
08/24/2026B00984119-S6Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits15
▸BISPLAN / WORK APPROVAL APPLICATION8
05/29/2024320901752Open ↗
07/20/2017321502584Open ↗
05/11/2017321502584Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION5
05/16/2017321502584Open ↗
05/16/2017321502584Open ↗
10/23/2014320984878Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
07/13/2017321502584Open ↗
07/13/2017321502584Open ↗
▸Seals & Professional Certifications44
▸DOB NOWSpecial Inspector Seal & Signature12
09/23/2026B00984119-P2Open ↗
09/06/2026B00800888-I1Open ↗
09/02/2026B00984119-S2Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
12/20/2017321502584Open ↗
12/20/2017321502584Open ↗
04/29/2015320984878Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/27/2026B00800888-I1Open ↗
08/27/2026B00800888-S1Open ↗
08/24/2026B00984119-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/23/2026B00984119-P2Open ↗
09/02/2026B00984119-S2Open ↗
09/02/2026B00984119-S2Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
05/11/2017321502584Open ↗
▸BISProfessional and Owner Certification (POC3)1
10/09/2014320984878Open ↗
▸BISPC FULL REPORT1
11/01/2007310044332Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
05/11/2017321502584Open ↗
▸Trade Schedules & Equipment15
▸BISEQUIPMENT USE APPLICATION/PERMIT6
04/29/2015320984878Open ↗
04/29/2015320984878Open ↗
04/15/2015320984878Open ↗
Showing 3 of 6 on file for this type
▸BISEQUIPMENT USE PERMITS5
04/29/2015320984878Open ↗
04/29/2015320984878Open ↗
04/29/2015320984878Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
07/20/2017321502584Open ↗
05/11/2017321502584Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
05/11/2017321502584Open ↗
▸BISSCHEDULE B - PLUMBING1
09/03/2013320901752Open ↗
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026B00984119-P2Open ↗
08/13/2026B00984119-I1Open ↗
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/24/2026B00984119-S5Open ↗
08/24/2026B00984119-S2Open ↗
08/24/2026B00984119-P2Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
05/11/2017321502584Open ↗
09/03/2013320901752Open ↗
09/03/2013320901752Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
11/15/2011320389888Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
11/02/2007310044332Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
12/20/2017321502584Open ↗
12/20/2017321502584Open ↗
04/29/2015320984878Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
12/20/2017321502584Open ↗
04/29/2015320984878Open ↗
12/14/2012320389888Open ↗
▸BISTECHNICAL REPORT: ENERGY1
11/15/2011320389888Open ↗
▸Approvals, Objections & Sign-offs10
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
12/20/2017321502584Open ↗
04/29/2015320984878Open ↗
01/07/2013320389888Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
09/03/2013320901752Open ↗
11/15/2011320389888Open ↗
11/01/2007310044332Open ↗
▸BISThird Party Electrical Signoff Compliance Report1
01/18/2013320389888Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
09/03/2013320901752Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT8
12/20/2017321502584Open ↗
05/11/2017321502584Open ↗
04/29/2015320984878Open ↗
Showing 3 of 8 on file for this type
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET3
05/15/2017321502584Open ↗
10/09/2014320984878Open ↗
11/15/2011320389888Open ↗
▸BISADDITIONAL INFORMATION2
06/22/2017321502584Open ↗
04/15/2015320984878Open ↗
▸BISBOROUGH INTAKE FORM1
12/20/2017321502584Open ↗
▸Other Documents3
▸DOB NOWProperty Ownership Certification2
08/24/2026B00984119-I1Open ↗
08/24/2026B00984119-P2Open ↗
▸BISPLOT DIAGRAM1
09/03/2013320901752Open ↗