← Back
BuildNYC
Two stories - detached, small or mid-size
238 EDINBORO ROAD
STATEN ISLAND · BIN 5037126
💬 Discuss this project
1915Year Built
2.5Stories
A1Building Class
R1-2Zoning
3,220 sfGross Floor Area
1Units
1 Active Violation ▸FDNY Report ↗
Two stories - detached, small or mid-size · 8,121 sf lot · 0.4 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Attic6p · 1 filing · 11 docs
Floor 29p · 1 filing · 11 docs
Floor 16p · 1 filing · 11 docs
Cellar7p · 1 filing · 11 docs
Site & exterior35p · 1 filing · 11 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Rogers Calvanico Group410/05/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Titanium Construction ServicesScaffold1307/08/2026
Titanium Construction Servicesspecialty_contractor903/21/2026
Titanium Construction ServicesGeneral Contractor303/21/2026
Plumbing NYCPlumbing107/08/2026
Solar Energy NYGeneral Contractor108/13/2015
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Rogers Calvanico Group1324109/01/2021
Building Lifecycle
09/13/2025
Permit expired, never signed off — Construction Fence
The city's record still shows this permit as issued, with no sign-off on its filing
S00576000-I1-FN
04/04/2025
ECB issue for rca not corrected .rca issued on 10/2/24 by badge# 3678 noted :at time of inspection, observed 2ND floor vertical/horizontal addition…
ECB violation · open
09/19/2024
Permit expired, never signed off — Mechanical Systems
The city's record still shows this permit as issued, with no sign-off on its filing
S00576000-S1-GC
09/13/2024
Permit renewed — Construction Fence
Renewed without changes
S00576000-I1-FN
09/20/2023
Permit renewed — Construction Fence
Renewed without changes
S00576000-I1-FN
37 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedTitanium Construction Services09/13/2024
DOB NOWConstruction FencePermit IssuedTitanium Construction Services09/20/2023
DOB NOWMechanical SystemsPermit IssuedTitanium Construction Services09/19/2023
DOB NOWMechanical SystemsPermit IssuedTitanium Construction Services10/01/2022
DOB NOWConstruction FencePermit IssuedTitanium Construction Services09/30/2022
DOB NOWPlumbingPermit IssuedPlumbing Works NYC12/20/2021
DOB NOWConstruction FencePermit IssuedTitanium Construction Services10/07/2021
DOB NOWMechanical SystemsPermit IssuedTitanium Construction Services10/07/2021
DOB NOWStructuralPermit IssuedTitanium Construction Services10/06/2021
DOB NOWConstruction FencePermit IssuedTitanium Construction Services09/03/2021
BISOTISSUEDSolar Energy NY08/13/2015
1 project · most recent 07/21/2026
General Wiring
FiledStatusContractorScope
07/21/2026CompleteMack ElectricalGeneral Wiring
1 project · most recent 10/05/2021
Fence
FiledStatusContractorScope
10/05/2021Permit IssuedTitanium Construction ServicesFence
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
09/09/2021Fenestration and door U-factor and product ratings—energy_progress
09/09/2021Fenestration air leakage—energy_progress
09/09/2021Ventilation and air distribution system—energy_progress
09/09/2021Fenestration areas—energy_progress
09/09/2021Insulation placement and R values—energy_progress
09/09/2021Maintenance information—energy_progress
09/09/2021Mechanical Systems—special
09/09/2021Structural Stability – Alterations of existing buildings—special
09/09/2021Energy Code Compliance Inspections—progress
09/09/2021Final—progress
09/09/2021Structural Wood Frame—progress
09/09/2021Duct leakage testing, insulation and design—energy_progress
09/09/2021Air barrier - visual inspection—energy_progress
09/09/2021Fireplaces—energy_progress
09/09/2021HVAC-R and service water piping design and insulation—energy_progress
09/09/2021HVAC-R and service water heating equipment—energy_progress
09/09/2021Interior lighting power—energy_progress
09/09/2021HVAC-R and service water heating system controls—energy_progress
09/09/2021Permanent certificate—energy_progress
48 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account