← Back
Elevator apt, semi-fireproof with stores
238 FT WASHINGTON AVENUE
MANHATTAN · BIN 1063386
💬 Discuss this project
1920Year Built
6Stories
D7Building Class
R8Zoning
56,246 sfGross Floor Area
43Units
LL97 CoveredRent Stabilized47 Open Violations ▸FDNY Report ↗
Elevator apt, semi-fireproof with stores · Owner of record: FT WASHINGTON EQUITIES · 12,018 sf lot · 4.68 FAR built · Flood zone X
Locations of Work
Architecture
Roof5p · 2 filings · 19 docs
Basement1p · 1 filing · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SPRINT407/08/2026
FT WASHINGTON EQUITIES8703/22/2026
FT WASHINGTON EQUITS LTO103/22/2026
NY SKYLINE GENERAL CO103/22/2026
FORT WASHINGTON EQUITIES LTD703/22/2026
METRO CONTRACTING NY303/21/2026
HEIGHTS REALTY ESTATE803/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NY BUILDING ASSOCIATES INC205/12/2026
MICHAEL L. PINSKE102/13/2018
COM-EX ENGINEERING OF NY, PLLC110/12/2017
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
S R SOLAR DESIGN203/21/2026
CONSTRUCTION PERMIT SERVICES303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MOSHE ROTHElectrical303/21/2026
AMC PLBG, HTG & CLNG, INCPlumbing303/22/2026
LEONE CONSTRUCTION, INCGeneral Contractor207/08/2026
TELCOM ENGINEERING GP INCGeneral Contractor203/21/2026
LAURENCE ROBINElectrical103/21/2026
ABBOT, AARONElectrical103/21/2026
ROBERT CHIMENTIElectrical103/21/2026
VOLTAIR SOLAR LLCGeneral Contractor107/08/2026
NELSON & TOM MAINT INC DBElectrical103/22/2026
B.P. ELECTRIC CORPElectrical103/22/2026
HUGHES, CHARLESElectrical103/21/2026
IRVING BAPTISTEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM ENGINEERING PLLC6244205/12/2026
ELEVATED ENGINEERING PLLC3692202/13/2018
Building Lifecycle
All (91)Filed (4)Permit Issued (4)Signed Off (3)Violation (60)Objection (10)Special Inspection (10)
08/23/2026
Violation issued (HPD, open)
C
08/23/2026
Violation issued (HPD, open)
A
08/23/2026
Violation issued (HPD, open)
B
08/23/2026
Violation issued (HPD, open)
B
08/23/2026
Violation issued (HPD, open)
A
08/23/2026
Violation issued (HPD, open)
B
08/23/2026
Violation issued (HPD, open)
C
08/19/2026
Violation issued (HPD, open)
B
08/19/2026
Violation issued (HPD, open)
B
08/19/2026
Violation issued (HPD, open)
B
08/19/2026
Violation issued (HPD, open)
B
08/19/2026
Violation issued (HPD, open)
C
08/19/2026
Violation issued (HPD, open)
B
08/19/2026
Violation issued (HPD, open)
C
08/19/2026
Violation issued (HPD, open)
B
08/19/2026
Violation issued (HPD, open)
B
08/18/2026
Violation issued (HPD, open)
B
07/11/2026
Violation issued (HPD, open)
B
07/11/2026
Violation issued (HPD, open)
A
07/11/2026
Violation issued (HPD, open)
A
07/11/2026
Violation issued (HPD, open)
B
07/11/2026
Violation issued (HPD, open)
A
06/01/2026
Signed off — Alteration
M01125070-I1
05/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
05/15/2026
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
05/15/2026
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
05/15/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARESH MAHANGU
05/15/2026
Special inspection requirement — Final
NARESH MAHANGU
05/12/2026
Filed — Alteration
M01125070-P1
05/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
05/08/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARESH MAHANGU
05/08/2026
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
05/08/2026
Special inspection requirement — Final
NARESH MAHANGU
05/08/2026
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
04/28/2026
Violation issued (HPD, closed)
A
11/30/2025
Violation issued (HPD, closed)
B
11/30/2025
Violation issued (HPD, closed)
B
11/23/2025
Violation issued (HPD, closed)
B
11/23/2025
Violation issued (HPD, closed)
C
11/17/2025
Violation issued (HPD, closed)
C
07/12/2025
Violation issued (HPD, closed)
C
06/25/2025
Violation issued (ECB, closed)
Elevators
06/04/2025
Violation issued (HPD, closed)
A
03/31/2025
Violation issued (HPD, closed)
B
03/31/2025
Violation issued (HPD, closed)
B
03/31/2025
Violation issued (HPD, closed)
B
03/31/2025
Violation issued (HPD, open)
B
03/31/2025
Violation issued (HPD, closed)
B
03/31/2025
Violation issued (HPD, closed)
B
03/05/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/12/2025
Violation issued (HPD, closed)
A
02/12/2025
Violation issued (HPD, closed)
B
02/12/2025
Violation issued (HPD, closed)
B
02/12/2025
Violation issued (HPD, closed)
C
02/12/2025
Violation issued (HPD, closed)
B
02/12/2025
Violation issued (HPD, closed)
B
02/12/2025
Violation issued (HPD, closed)
C
02/12/2025
Violation issued (HPD, closed)
C
02/12/2025
Violation issued (HPD, closed)
B
02/12/2025
Violation issued (HPD, closed)
B
Latest 60 of 91 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offVOLTAIR SOLAR LLC12/13/2024
DOB NOWAntennaSigned-offLINED UP CONSTRUCTION03/22/2018
DOB NOWAntennaSigned-offHI-TECH C.O.M. CO01/16/2018
DOB NOWAntennaSigned-offHI-TECH C.O.M. CO11/15/2017
BISOTISSUEDCDC HOUSING INC05/20/2019
BISPLISSUEDAMC PLBG, HTG & CLNG, INC02/22/2019
BISOTISSUEDCDC HOUSING INC02/22/2019
BISPLISSUEDA.R.L. PLUMBING & HTG LLC06/05/2017
BISOTISSUEDHERITAGE CHIMNEY SERVICE05/16/2016
BISFBISSUEDSPRAGUE OPERNG RESOURCES10/07/2015
BISEQISSUEDNY SKYLINE GENERAL CONSTR04/24/2015
BISPLISSUEDA.R.L. PLUMBING & HTG LLC11/04/2014
BISOTISSUEDNY SKYLINE GENERAL CONSTR09/08/2014
BISOTISSUEDNY SKYLINE GENERAL CONSTR04/25/2014
BISEQISSUEDMETRO CONTRACTING NY, INC.04/24/2014
BISEQISSUEDNY SKYLINE GENERAL CONSTR04/04/2014
BISPLISSUEDA.R.L. PLUMBING & HTG LLC10/18/2013
BISOTISSUEDSQUAN CONSTRUCTION SERVIC04/22/2013
BISEQISSUEDNY SKYLINE GENERAL CONSTR11/29/2012
BISOTISSUEDTELCOM ENGINEERING GP INC11/09/2011
BISEQISSUEDNY SKYLINE GENERAL CONSTR11/04/2011
BISOTISSUEDPETER & MONTY CONTRS CORP06/14/2011
BISEQISSUEDPETER & MONTY CONTRS CORP06/02/2011
BISOTISSUEDBCI COMMUNICATIONS INC09/25/2008
BISOTISSUEDARETE DEVELOPMENT, INC.11/21/2005
BISOTISSUEDPETER & B CONSTRUCTION INC04/14/2005
BISFBISSUEDC C CONTROLLED COMBUSTION03/14/1995
5 projects · most recent 02/19/2026
General Wiring
FiledStatusContractorScope
02/19/2026CompleteB.P. ELECTRIC CORP—
02/28/2022Permit IssuedROBERT CHIMENTI20 meters, 1 new_meters
07/15/2020CompleteROBIN ELECTRICAL CO., INCGeneral Wiring
04/16/2019CompleteNASH ELECTRIC SERVICES IN—
04/01/2019Permit IssuedNELSON & TOM MAINT INC DBGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
05/15/2026Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
05/15/2026Energy Code Compliance InspectionsNARESH MAHANGUprogress
05/15/2026Air barrier - visual inspectionNARESH MAHANGUenergy_progress
05/15/2026Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
05/15/2026FinalNARESH MAHANGUprogress
05/08/2026Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
05/08/2026Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
05/08/2026Energy Code Compliance InspectionsNARESH MAHANGUprogress
05/08/2026FinalNARESH MAHANGUprogress
05/08/2026Air barrier - visual inspectionNARESH MAHANGUenergy_progress
▾Documents — 267 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
09/06/2026M00000385-I1Request digital key ↗
08/17/2026M01125070-I1Request digital key ↗
08/17/2026M01125070-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits42
▸BISWORK PERMIT APPLICATION21
02/25/2019123469326Open ↗
02/25/2019123469326Open ↗
06/13/2017121814368Open ↗
Showing 3 of 21 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION21
11/27/2019123469326Open ↗
11/26/2019123469326Open ↗
05/31/2019123469326Open ↗
Showing 3 of 21 on file for this type
▸Seals & Professional Certifications74
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION34
12/31/2019123469326Open ↗
12/31/2019123469326Open ↗
12/18/2019123469326Open ↗
Showing 3 of 34 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
08/15/2018123469326Open ↗
10/22/2013121814368Open ↗
06/07/2011120709448Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM7
06/07/2011120709448Open ↗
06/07/2011120709457Open ↗
Showing 2 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
08/15/2018123469326Open ↗
05/13/2016140495051Open ↗
04/24/2014140189944Open ↗
Showing 3 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
05/13/2016140495051Open ↗
04/24/2014140189944Open ↗
04/23/2014140188847Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
05/13/2016140495051Open ↗
04/24/2014140189944Open ↗
04/23/2014140188847Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/17/2026M01125070-P1Open ↗
08/17/2026M01125070-I1Open ↗
08/13/2026M00009657-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026M01125070-I1Open ↗
09/01/2026M01125070-I1Open ↗
08/31/2026M01125070-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026M01125070-I1Open ↗
09/01/2026M01125070-I1Open ↗
08/31/2026M01125070-P1Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment10
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE6
11/27/2019123469326Open ↗
11/26/2019123469326Open ↗
05/31/2019123469326Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
10/20/2016121814368Open ↗
10/22/2013121814368Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
06/27/2013121391984Open ↗
▸BISSCHEDULE B - PLUMBING1
10/22/2013121814368Open ↗
▸Safety & Tenant Protection2
▸BISTENANT PROTECTION PLAN AND NOTES2
05/13/2016140495051Open ↗
08/15/2018123469326Open ↗
▸Environmental & Asbestos23
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'10
10/17/2011120855583Open ↗
06/17/2011120709448Open ↗
06/17/2011120709448Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
08/15/2018123469326Open ↗
05/13/2016140495051Open ↗
04/24/2014140189944Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/17/2026M01125070-I1Open ↗
08/17/2026M01125070-P1Open ↗
08/13/2026M00000385-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
06/07/2011120709457Open ↗
Showing 1 of 2 on file for this type
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
12/31/2019123469326Open ↗
12/18/2019123469326Open ↗
08/15/2018123469326Open ↗
Showing 3 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
12/18/2019123469326Open ↗
06/07/2018121814368Open ↗
12/12/2017121391984Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
05/13/2016140495051Open ↗
04/24/2014140189944Open ↗
▸BISTECHNICAL REPORT: ENERGY1
10/17/2011120855583Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
05/13/2016140495051Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY3
04/24/2014140189944Open ↗
04/23/2014140188847Open ↗
03/27/2014140178117Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING1
06/07/2018121814368Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
01/10/2019110400110Open ↗
▸Approvals, Objections & Sign-offs36
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST19
12/31/2019123469326Open ↗
12/18/2019123469326Open ↗
03/05/2019110400110Open ↗
Showing 3 of 19 on file for this type
▸BISADMINISTRATIVE OBJECTIONS7
10/26/2012121391984Open ↗
10/17/2011120855583Open ↗
06/07/2011120709448Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
03/05/2019110400110Open ↗
07/09/2018140188847Open ↗
07/09/2018140178117Open ↗
Showing 3 of 6 on file for this type
▸BISSHED LETTER2
05/06/2015140178117Open ↗
11/18/2011120709457Open ↗
▸BISSUPERSEDING LETTER1
11/18/2011120709457Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/17/2026M01125070-I1Open ↗
▸Cost, Insurance & Ownership20
▸BISCOST AFFIDAVIT19
12/18/2019123469326Open ↗
01/10/2019110400110Open ↗
08/15/2018123469326Open ↗
Showing 3 of 19 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms33
▸BISBOROUGH INTAKE FORM13
12/31/2019123469326Open ↗
12/18/2019123469326Open ↗
11/26/2019123469326Open ↗
Showing 3 of 13 on file for this type
▸BISADDITIONAL INFORMATION9
04/24/2019123469326Open ↗
04/02/2019123469326Open ↗
01/03/2019110400110Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING COVER SHEET7
08/15/2018123469326Open ↗
10/22/2013121814368Open ↗
06/07/2011120709448Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
05/13/2016140495051Open ↗
04/24/2014140189944Open ↗
04/23/2014140188847Open ↗
Showing 3 of 4 on file for this type
▸Other Documents1
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
11/30/2012120709457Open ↗