← Back
Walk-up cooperative
238 WEST 11 STREET
MANHATTAN · West Village · BIN 1010914
💬 Discuss this project
1853Year Built
4Stories
C6Building Class
R6Zoning
3,385 sfGross Floor Area
4Units
Rent Stabilized24 Open Violations ▸
Walk-up cooperative · Owner of record: 238 W 11TH ST COOP CO · 1,900 sf lot · 1.78 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof3p · 3 filings · 14 docs
Bulkhead1p · 1 filing · 4 docs
Floor 51p · 1 filing · 14 docs
Floor 413p · 2 filings · 20 docs
Floor 313p · 4 filings · 20 docs
Floor 212p · 3 filings · 20 docs
Floor 111p · 2 filings · 20 docs
Cellar13p · 4 filings · 20 docs
Sub-Cellar1p · 1 filing · 4 docs
Basement13p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
238 WEST 11TH2304/09/2026
238 W 11TH ST COOP CO103/22/2026
238 WEST 11TH STREET COOPERATIVE203/21/2026
238 W 11TH ST COOPERATIVE303/21/2026
238 ANNEX203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSEPH VANCE ARCHITECTS211/15/2023
MCLAREN305/17/2023
P.A. COLLINS PE301/25/2023
MCLAREN ENGINEERING GROUP111/04/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MICHAEL ZENREICH ARCHITECT1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
REIS EY, INCGeneral Contractor404/09/2026
GREGORY PAPANTONIOUElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALAN MARGOLIN & ASSOC423511/15/2023
M.G. MCLAREN ENGINEERING2999105/17/2023
P.A.COLLINS INSPECTIONS P2168201/25/2023
Building Lifecycle
All (83)Filed (9)Permit Issued (2)Violation (31)Inspection (1)Objection (11)Special Inspection (29)
06/23/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/29/2026
Violation issued (HPD, open)
A
11/17/2025
Violation issued (HPD, open)
I
06/04/2025
Violation issued (HPD, open)
A
12/18/2024
Permit issued — General Construction
M08015217-I1-GC
11/22/2024
Violation issued (HPD, open)
I
05/07/2024
Permit issued — General Construction
M08015217-I1-GC
04/01/2024
Violation issued (HPD, open)
A
11/22/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Young Suh
11/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
11/22/2023
Special inspection requirement — Fire-Resistance Rated Construction
Young Suh
11/15/2023
Filed — Alteration CO
Conversion of existing 3 family dwelling to a single family dwelling.
M08015217-P1
11/15/2023
Violation issued (HPD, open)
I
10/17/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
10/17/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Young Suh
10/17/2023
Special inspection requirement — Fire-Resistance Rated Construction
Young Suh
06/02/2023
Objection raised — Other
06/02/2023
Objection resolved — Addressed
05/23/2023
Objection raised — Structural
05/17/2023
Filed — Alteration
RENOVATION OF A FOUR-STORY TOWNHOUSE LOCATED AT 238 WEST 11TH STREET. THE FIRST AND FOURTH FLOOR WILL BE REBUILT WHILE THE CELLAR AND BASEMENT LEVEL WILL CHANGE IN SIZE AND SHAPE. No change in use, egress, or occupancy.
M08033931-P1
05/17/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Young Suh
05/17/2023
Special inspection requirement — Footing and Foundation
Young Suh
05/17/2023
Special inspection requirement — Final
Young Suh
05/17/2023
Special inspection requirement — Underpinning
Young Suh
05/03/2023
Special inspection requirement — Underpinning
05/01/2023
Special inspection requirement — Final
William Gorlin
05/01/2023
Special inspection requirement — Footing and Foundation
William Gorlin
05/01/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
William Gorlin
04/05/2023
Objection raised — Other
04/05/2023
Objection resolved — Addressed
04/04/2023
Filed — Alteration
INSTALLING A SUPPORT OF EXCAVATION SYSTEM ON THREE SIDES OF THE BACK OF THE PROPERTY. IT CONSISTS OF A SOLDIER PILE WALL WITH TIMBER LAGGING, BRACED BY A WALER SYSTEM. ADDITIONALLY, UNDERPINNING OF ALL EXISTING FOUNDATION WALLS WILL BE REQUIRED.
M00818069-I1
03/15/2023
Violation issued (HPD, open)
A
02/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Collins
02/02/2023
Objection raised — Admin
02/02/2023
Objection resolved — Addressed
02/02/2023
Objection raised — Scope
02/02/2023
Objection resolved — Addressed
01/25/2023
Filed — Alteration
Mechanical application being filed for a heat recovery VRF heat pump air conditioning system, energy recovery ventilators, exhaust fans. and associated air distribution systems and controls. Related Alteration CO application #M08015217.
M08043638-I1
01/25/2023
Objection raised — Admin
01/25/2023
Objection resolved — Addressed
01/19/2023
Filed — Alteration
M08043693-I1
01/19/2023
Filed — Alteration
Applicaiton being filed that INCLUDES A NEW 2-1/2" COMBINED SPRINKLER WATER SERVICE, 2" RPZ, 2-1/2" DCDA,HEAT PUMP WATER HEATER, DOMESTIC, SANITARY, AND GAS PIPING, SUMP AND SEWAGEEJECTOR PUMPS, AND PLUMBING FIXTURES.
M08043681-I1
11/21/2022
Special inspection requirement — Sprinkler Systems
Paul Collins
11/21/2022
Special inspection requirement — Final
Paul Collins
11/21/2022
Special inspection requirement — Mechanical Systems
Paul Collins
11/04/2022
Filed — Alteration
RENOVATION OF A FOUR-STORY TOWNHOUSE LOCATED AT 238 WEST 11TH STREET. THE FIRST AND FOURTH FLOOR WILL BE REBUILT WHILE THE CELLAR AND BASEMENT LEVEL WILL CHANGE IN SIZE AND SHAPE. No change in use, egress, or occupancy.
M08033931-I1
11/04/2022
Filed — Alteration
Application being filed for the renovation of a 4-story townhouse located at 239 West 11th Street. The 1st and 4th floors will be rebuilt while the cellar and basement levels will change in size and shape. No change in use, egress, or occupancy.
M08033044-I1
11/03/2022
Special inspection requirement — Post-installed Anchors
Young Suh
11/03/2022
Special inspection requirement — Structural Steel - High Strength Bolting
Young Suh
11/03/2022
Special inspection requirement — Structural Steel - Welding
Young Suh
11/03/2022
Special inspection requirement — Subgrade Inspections
Young Suh
11/03/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Young Suh
11/03/2022
Special inspection requirement — Preliminary
Young Suh
11/03/2022
Special inspection requirement — Structural Wood Frame
Young Suh
11/03/2022
Special inspection requirement — Concrete - Cast-In-Place
Young Suh
11/03/2022
Special inspection requirement — Structural Steel - Details
Young Suh
11/03/2022
Special inspection requirement — Masonry
Young Suh
11/02/2022
Filed — Alteration CO
Conversion of existing 3 family dwelling to a single family dwelling.
M08015217-I1
11/02/2022
Violation issued (HPD, open)
I
11/02/2022
Special inspection requirement — Final
Young Suh
Latest 60 of 83 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedREIS EY, INC12/18/2024
DOB NOWGeneral ConstructionPermit IssuedREIS EY, INC05/07/2024
BISOTISSUEDFRANCO REMODELING CORP03/18/2016
BISOTISSUEDFRANCO REMODELING CORP06/05/2015
BISEQISSUEDEVEREST SCAFFOLDING INC06/02/2015
BISEQISSUEDEVEREST SCAFFOLDING INC06/02/2015
BISPLISSUEDA REAL GOOD PLUMBER INC07/24/2014
BISBLISSUEDA REAL GOOD PLUMBER INC07/24/2014
BISOTISSUEDJESTCOR CONTRACTING INC02/29/2012
1 project · most recent 01/25/2023
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/25/2023——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric PURY-EP192TNU-A 16 tons · Vrf Outdoor ×1
Ventilation
1 project · most recent 01/19/2023
Gas Water/Sanitary
FiledStatusContractorScope
01/19/2023——Gas, Water/Sanitary
3 projects · most recent 05/17/2023
Steel Concrete Masonry Wood
FiledStatusContractorScope
05/17/2023——1 scope_items
04/04/2023——1 scope_items
11/04/2022——Steel, Concrete, Masonry, Wood
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
06/23/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
11/22/2023Structural Stability – Alterations of existing buildingsYoung Suhspecial
11/22/2023Fire-Resistant Penetrations and JointsYoung Suhspecial
11/22/2023Fire-Resistance Rated ConstructionYoung Suhprogress
10/17/2023Fire-Resistant Penetrations and JointsYoung Suhspecial
10/17/2023Structural Stability – Alterations of existing buildingsYoung Suhspecial
10/17/2023Fire-Resistance Rated ConstructionYoung Suhprogress
05/17/2023Structural Stability – Alterations of existing buildingsYoung Suhspecial
05/17/2023Footing and FoundationYoung Suhprogress
05/17/2023FinalYoung Suhprogress
05/17/2023UnderpinningYoung Suhspecial
05/03/2023Underpinning—special
05/01/2023FinalWilliam Gorlinprogress
05/01/2023Footing and FoundationWilliam Gorlinprogress
05/01/2023Structural Stability – Alterations of existing buildingsWilliam Gorlinspecial
02/16/2023Fire-Resistant Penetrations and JointsPaul Collinsspecial
11/21/2022Sprinkler SystemsPaul Collinsspecial
11/21/2022FinalPaul Collinsprogress
11/21/2022Mechanical SystemsPaul Collinsspecial
11/03/2022Post-installed AnchorsYoung Suhspecial
11/03/2022Structural Steel - High Strength BoltingYoung Suhspecial
11/03/2022Structural Steel - WeldingYoung Suhspecial
11/03/2022Subgrade InspectionsYoung Suhspecial
11/03/2022Structural Stability – Alterations of existing buildingsYoung Suhspecial
11/03/2022PreliminaryYoung Suhprogress
11/03/2022Structural Wood FrameYoung Suhprogress
Latest 25 of 29.
▾Documents — 141 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
09/01/2026M08033044-I1Request digital key ↗
09/01/2026M08043693-I1Request digital key ↗
08/31/2026M08033931-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits22
▸BISWORK PERMIT APPLICATION8
04/04/2016122264806Open ↗
06/18/2015122264806Open ↗
06/01/2015140354881Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWLPC Approval/Permit8
08/13/2026M08015217-I1Open ↗
08/13/2026M08043681-I1Open ↗
08/13/2026M00818069-I1Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION6
06/01/2015140354881Open ↗
06/01/2015140354970Open ↗
04/28/2015122264806Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications56
▸DOB NOWSpecial Inspector Seal & Signature18
09/01/2026M08015217-I1Open ↗
09/01/2026M08015217-I1Open ↗
09/01/2026M08043693-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/01/2026M08015217-I1Open ↗
08/25/2026M08033931-I1Open ↗
08/25/2026M08033931-I1Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
04/18/2017122264806Open ↗
03/14/2016140354881Open ↗
02/09/2016140354970Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/01/2026M08033044-I1Open ↗
09/01/2026M08043681-I1Open ↗
09/01/2026M08043638-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
06/01/2015140354881Open ↗
06/01/2015140354970Open ↗
07/25/2014122075761Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
06/01/2015140354881Open ↗
06/01/2015140354970Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
07/25/2014122075761Open ↗
01/27/2012120961281Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
06/01/2015140354881Open ↗
06/01/2015140354970Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
01/27/2012120961281Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
07/25/2014122075761Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
07/25/2014122075761Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
08/13/2026M08015217-P1Open ↗
08/13/2026M08015217-I1Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
04/28/2015122264806Open ↗
▸Environmental & Asbestos3
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
06/01/2015140354970Open ↗
07/25/2014122075761Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
01/27/2012120961281Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY1
01/27/2012120961281Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
07/25/2014122075761Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
06/01/2015140354881Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
06/01/2015140354881Open ↗
06/01/2015140354970Open ↗
▸Approvals, Objections & Sign-offs16
▸BISLANDMARKS APPROVAL7
04/18/2017122264806Open ↗
06/01/2015140354881Open ↗
06/01/2015140354970Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
04/18/2017122264806Open ↗
03/14/2016140354881Open ↗
02/09/2016140354970Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
04/18/2017122264806Open ↗
05/20/2015122264806Open ↗
07/03/2013120961281Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
01/27/2012120961281Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/13/2026M08015217-I1Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
04/18/2017122264806Open ↗
03/16/2015122264806Open ↗
07/25/2014122075761Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms9
▸BISADDITIONAL INFORMATION4
06/29/2015140354970Open ↗
06/16/2015140354970Open ↗
06/10/2015140354881Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET3
03/16/2015122264806Open ↗
07/25/2014122075761Open ↗
01/27/2012120961281Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
06/01/2015140354881Open ↗
06/01/2015140354970Open ↗
▸Other Documents11
▸DOB NOWProof of Historic Building4
08/13/2026M08015217-P1Open ↗
08/13/2026M08015217-I1Open ↗
08/13/2026M08043638-I1Open ↗
Showing 3 of 4 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
05/20/2015122264806Open ↗
05/20/2015122264806Open ↗
05/20/2015122264806Open ↗
▸DOB NOWPlot Diagram2
08/13/2026M08033931-P1Open ↗
08/13/2026M08033931-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/28/2026M08015217-I1Open ↗
08/28/2026M08015217-P1Open ↗