← Back
Four families
2380 84 STREET
BROOKLYN · BIN 3185220
💬 Discuss this project
1924Year Built
2Stories
C3Building Class
R5Zoning
3,510 sfGross Floor Area
4Units
Rent Stabilized7 Open Violations ▸FDNY Report ↗
Four families · Owner of record: XING WANG 2380 LLC · 2,808 sf lot · 1.25 FAR built · Flood zone X500
Locations of Work
ArchitectureElectricalPlumbing
Floor 21p · 1 filing · 16 docs
Floor 11p · 1 filing · 16 docs
Cellar6p · 1 filing · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
XING WANG 2380303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/18/2025$1.8M—— → —$520/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NIC 88 CORP312/17/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BASIC GROUPS603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CUBE BUILDERS GROUP NYGeneral Contractor303/21/2026
PIPESTYLISTS, INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NIC 88 CORP8371312/17/2025
Building Lifecycle
All (44)Filed (3)Permit Issued (3)Violation (19)Inspection (4)Special Inspection (15)
05/01/2026
Violation issued (HPD, closed)
A
12/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
12/18/2025
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
12/18/2025
Special inspection requirement — HVAC-R and service water heating system controls
Eric Sun
12/18/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Eric Sun
12/18/2025
Special inspection requirement — HVAC-R and service water heating equipment
Eric Sun
12/17/2025
Filed — Alteration
INSTALL NEW GAS H.W.H., COMBI-BOILERS, BATHROOM AND KITCHEN FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01216143-P1
07/18/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/18/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/18/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/07/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/05/2025
Permit issued — Plumbing
B01216143-S1-PL
05/06/2025
Permit issued — Plumbing
B01216143-S1-PL
05/01/2025
Filed — Alteration
INSTALL NEW GAS H.W.H., COMBI-BOILERS, BATHROOM AND KITCHEN FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01216143-S1
04/29/2025
Permit issued — General Construction
B01216143-I1-GC
04/25/2025
Filed — Alteration
INSTALL NEW GAS H.W.H., COMBI-BOILERS, BATHROOM AND KITCHEN FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01216143-I1
04/25/2025
Special inspection requirement — Fenestration areas
Eric Sun
04/25/2025
Special inspection requirement — Air barrier - visual inspection
Eric Sun
04/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
04/25/2025
Special inspection requirement — Interior lighting power
Eric Sun
04/25/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Eric Sun
04/25/2025
Special inspection requirement — Insulation placement and R values
Eric Sun
04/25/2025
Special inspection requirement — Final
Yuxuan Liu
04/25/2025
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
04/25/2025
Special inspection requirement — Fire-Resistance Rated Construction
Eric Sun
04/25/2025
Special inspection requirement — Fenestration air leakage
Eric Sun
01/20/2025
Violation issued (HPD, closed)
C
01/20/2025
Violation issued (HPD, open)
A
01/20/2025
Violation issued (HPD, open)
A
01/20/2025
Violation issued (HPD, open)
A
01/20/2025
Violation issued (HPD, open)
C
01/20/2025
Violation issued (HPD, open)
A
01/20/2025
Violation issued (HPD, open)
A
01/20/2025
Violation issued (HPD, open)
A
04/08/2024
Violation issued (HPD, closed)
A
11/20/2023
Violation issued (HPD, closed)
I
03/21/2023
Violation issued (HPD, closed)
A
02/23/2022
Violation issued (HPD, closed)
I
02/23/2022
Violation issued (HPD, closed)
A
04/07/2021
Violation issued (HPD, closed)
A
10/15/2018
Violation issued (HPD, closed)
I
11/03/2016
Violation issued (HPD, closed)
I
10/07/2015
Violation issued (HPD, closed)
I
02/17/2015
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offT & T PLUMBING INC06/05/2025
DOB NOWPlumbingSigned-offT & T PLUMBING INC05/06/2025
DOB NOWGeneral ConstructionPermit IssuedCUBE BUILDERS GROUP NY04/29/2025
1 project · most recent 12/17/2025
Gas Water/Sanitary
FiledStatusContractorScope
12/17/2025Signed-offT & T PLUMBING INCGas, Water/Sanitary
1 project · most recent 08/30/2025
FiledStatusContractorScope
08/30/2025CompleteE D ELECTRICAL INC5 meters, 5 new_meters
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
07/18/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/18/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/18/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/07/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
12/18/2025Fire-Resistant Penetrations and JointsEric Sunspecial
12/18/2025Energy Code Compliance InspectionsEric Sunprogress
12/18/2025HVAC-R and service water heating system controlsEric Sunenergy_progress
12/18/2025HVAC-R and service water piping design and insulationEric Sunenergy_progress
12/18/2025HVAC-R and service water heating equipmentEric Sunenergy_progress
04/25/2025Fenestration areasEric Sunenergy_progress
04/25/2025Air barrier - visual inspectionEric Sunenergy_progress
04/25/2025Fire-Resistant Penetrations and JointsEric Sunspecial
04/25/2025Interior lighting powerEric Sunenergy_progress
04/25/2025Fenestration and door U-factor and product ratingsEric Sunenergy_progress
04/25/2025Insulation placement and R valuesEric Sunenergy_progress
04/25/2025FinalYuxuan Liuprogress
04/25/2025Energy Code Compliance InspectionsEric Sunprogress
04/25/2025Fire-Resistance Rated ConstructionEric Sunprogress
04/25/2025Fenestration air leakageEric Sunenergy_progress
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/21/2026B01216143-S1Request digital key ↗
08/21/2026B01216143-I1Request digital key ↗
08/21/2026B01216143-P1Request digital key ↗
▸Seals & Professional Certifications10
▸DOB NOWProgress Inspector Seal & Signature5
09/19/2026B01216143-I1Open ↗
09/19/2026B01216143-I1Open ↗
09/19/2026B01216143-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/21/2026B01216143-S1Open ↗
08/21/2026B01216143-I1Open ↗
08/21/2026B01216143-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/19/2026B01216143-I1Open ↗
08/30/2026B01216143-S1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/21/2026B01216143-I1Open ↗
08/21/2026B01216143-S1Open ↗
08/21/2026B01216143-P1Open ↗