← Back
BuildNYC
Walk-up cooperative
2381 DEAN STREET
BROOKLYN · Ocean Hill · BIN 3038759
💬 Discuss this project
1910Year Built
4Stories
C6Building Class
R6Zoning
22,688 sfGross Floor Area
27Units
Rent Stabilized363 Active Violations 347 unresolved · 16 paperwork only 4 likely answered ▸FDNY Report ↗
Walk-up cooperative · Owner of record: Cypress Hills TPT Housing Development Fu ND · 5,767 sf lot · 3.93 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbingEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofBoiler and chimney work2p · 3 filings · 20 docs
Floor 4Unit 43 filings · 20 docs
Floor 3Backflow preventer and plumbing fixture installation3 filings · 20 docs
Floor 2Backflow preventer and plumbing fixture installation3 filings · 20 docs
Floor 1Unit 1A6 filings · 20 docs
CellarNew gas line and meter6p · 10 filings · 20 docs
Site & exteriorHeavy duty sidewalk shed installationUnder Construction5p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Cypress Hills TPT HDFC203/21/2026
Department of Housing103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MSM Engineering Services110/01/2024
All City Engineering1002/26/2024
Collado Engineering301/31/2024
Cta Architects301/18/2024
Madsen Consulting Engineering212/15/2023
Gregory V. Perotto, P.E.404/12/2021
Bazini Engineering103/13/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Perotto Group803/21/2026
Municipal Building Consultants1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Aurora P & H ContPlumbing407/08/2026
Aurora PLB & HeatingGeneral Contractor203/21/2026
R & S ConstructionScaffold207/08/2026
L&B Electrical InternationalElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Big Apple Group NY A Rma91681302/26/2024
Gregory V. Perotto, P.E.947404/12/2021
Bazini Engineering1808103/13/2020
Building Lifecycle
06/10/2026
§ 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT RANGE IN THE ENTIRE APARTMENT LOCATED AT APT 6, 3rd STORY, 1st APARTMENT…
HPD violation · open
06/10/2026
§ 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
HPD violation · open
06/10/2026
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BASE CABINET FLOOR IN THE KITCHEN LOCATED AT APT 6, 3rd STORY, 1st…
HPD violation · open
06/10/2026
§ 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASHBASIN IN THE BATHROOM LOCATED AT APT 6, 3rd STORY, 1st APARTMENT FROM NORTH AT…
HPD violation · open
06/10/2026
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT WEST, SOUTH AND NORTH WALLS IN THE BATHROOM…
HPD violation · open
300 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedR & S Construction01/12/2026
DOB NOWSidewalk ShedPermit IssuedR & S Construction10/01/2024
DOB NOWPlumbingSigned-offAurora P & H Cont04/07/2021
DOB NOWBoiler EquipmentSigned-offAtomic Fuel Oil Transport03/31/2021
DOB NOWBoiler EquipmentSigned-offAtomic Fuel Oil Transport03/12/2021
DOB NOWPlumbingSigned-offAurora P & H Cont01/08/2021
DOB NOWMechanical SystemsPermit IssuedAurora PLB & Heating03/25/2020
DOB NOWBoiler EquipmentSigned-offAtomic Fuel Oil Transport01/17/2020
DOB NOWPlumbingSigned-offAurora P & H Cont01/13/2020
BISEQISSUEDB H & B Construction09/16/2014
BISOTISSUEDApex Contracting09/10/2014
BISEQISSUEDRock Scaffolding04/20/2012
BISPLISSUEDPlumbing Consultant06/24/2011
BISPLISSUEDPlumbing Consultant06/24/2011
BISOTISSUEDAbul Kalam Azad08/31/2010
BISOTISSUEDAbul Kalam Azad07/16/2010
BISBLISSUEDS.J. Fuel06/30/2010
3 projects · most recent 02/26/2024
Ventilation Systems Associated Ducts and Piping
FiledStatusContractorScope
02/26/2024——Ventilation Systems
01/18/2024——Associated Ducts and Piping, Ventilation Systems
12/21/2023——Ventilation Systems
3 projects · most recent 02/26/2024
Water/Sanitary Gas
FiledStatusContractorScope
02/26/2024——Gas, Water/Sanitary
01/31/2024——Gas, Water/Sanitary
01/18/2024——Water/Sanitary
1 project · most recent 10/01/2024
FiledStatusContractorScope
10/01/2024Permit IssuedRichard Neu—
1 project · most recent 12/15/2023
Steel Concrete Masonry Wood
FiledStatusContractorScope
12/15/2023——Steel, Concrete, Masonry, Wood
1 project · most recent 10/01/2024
Sidewalk Shed
FiledStatusContractorScope
10/01/2024Permit IssuedR & S ConstructionSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 118
DateRequirementInspectorRole
03/20/2024HVAC-R and service water piping design and insulationSOORJBALLY HARILALLenergy_progress
03/20/2024Maintenance informationSOORJBALLY HARILALLenergy_progress
03/20/2024HVAC-R and service water heating equipmentSOORJBALLY HARILALLenergy_progress
03/20/2024Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
03/20/2024Heating SystemsSOORJBALLY HARILALLspecial
03/20/2024HVAC-R and service water heating system controlsSOORJBALLY HARILALLenergy_progress
03/15/2024Energy Code Compliance InspectionsSOORJBALLY HARILALLprogress
02/26/2024HVAC-R and service water piping design and insulationSOORJBALLY HARILALLenergy_progress
02/26/2024Maintenance informationSOORJBALLY HARILALLenergy_progress
02/26/2024HVAC-R and service water heating equipmentSOORJBALLY HARILALLenergy_progress
02/26/2024HVAC-R and service water heating system controlsSOORJBALLY HARILALLenergy_progress
02/20/2024Maintenance informationSOORJBALLY HARILALLenergy_progress
02/20/2024Shutoff dampersSOORJBALLY HARILALLenergy_progress
02/20/2024HVAC-R and service water heating system controlsSOORJBALLY HARILALLenergy_progress
02/20/2024Tenant Protection Plan ComplianceSOORJBALLY HARILALLspecial
02/20/2024HVAC-R and service water piping design and insulationSOORJBALLY HARILALLenergy_progress
02/20/2024Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
02/20/2024Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
02/20/2024Chimneys and ventsSOORJBALLY HARILALLspecial
02/20/2024Mechanical SystemsSOORJBALLY HARILALLspecial
02/20/2024Tenant Protection Plan ComplianceSOORJBALLY HARILALLspecial
02/20/2024FinalSOORJBALLY HARILALLprogress
02/20/2024Energy Code Compliance InspectionsSOORJBALLY HARILALLprogress
02/20/2024Heating SystemsSOORJBALLY HARILALLspecial
02/20/2024Fuel-Oil Storage and Fuel-Oil Piping SystemsSOORJBALLY HARILALLspecial
Latest 25 of 118.
201 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account