Elevator apt, miscellaneous
Taino Towers
2383 2 AVENUE · BIN 1054628
💬 Discuss this project
1974Year Built
35Stories
D9Building Class
R9Zoning
297,425 sfGross Floor Area
216Units
LL97 CoveredRent Stabilized96 Open Violations 95 unresolved · 1 paperwork only ▸FISP: SAFE
Elevator apt, miscellaneous · Owner of record: EAST HARLEM PILOT,HDFC, · 26,865 sf lot · 11.07 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneralOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction50p · 4 filings · 20 docs
Floor 35Under Construction49p · 5 filings · 20 docs
Floor 34Under Construction48p · 5 filings · 20 docs
Floor 33Under Construction48p · 5 filings · 20 docs
Floor 32Under Construction48p · 5 filings · 20 docs
Floor 31Under Construction48p · 5 filings · 20 docs
Floor 30Under Construction48p · 5 filings · 20 docs
Floor 29Under Construction48p · 5 filings · 20 docs
Floor 28Under Construction48p · 5 filings · 20 docs
Floor 27Under Construction48p · 5 filings · 20 docs
Floor 26Under Construction48p · 5 filings · 20 docs
Floor 25Under Construction48p · 5 filings · 20 docs
Floor 24Under Construction48p · 5 filings · 20 docs
Floor 23Under Construction48p · 5 filings · 20 docs
Floor 22Under Construction48p · 5 filings · 20 docs
Floor 21Under Construction48p · 5 filings · 20 docs
Floor 20Under Construction48p · 5 filings · 20 docs
Floor 19Under Construction48p · 5 filings · 20 docs
Floor 18Under Construction48p · 5 filings · 20 docs
Floor 17Under Construction48p · 5 filings · 20 docs
Floor 16Under Construction48p · 5 filings · 20 docs
Floor 15Under Construction48p · 5 filings · 20 docs
Floor 14Under Construction48p · 5 filings · 20 docs
Floor 13Under Construction48p · 5 filings · 20 docs
Floor 12Under Construction48p · 5 filings · 20 docs
Floor 11Under Construction48p · 5 filings · 20 docs
Floor 10Under Construction48p · 5 filings · 20 docs
Floor 9Under Construction48p · 5 filings · 20 docs
Floor 8Under Construction48p · 5 filings · 20 docs
Floor 7Under Construction48p · 5 filings · 20 docs
Floor 6Under Construction48p · 5 filings · 20 docs
Floor 5Under Construction7p · 3 filings · 20 docs
Floor 4Under Construction8p · 2 filings · 15 docs
Floor 3Under Construction6p · 2 filings · 15 docs
Floor 2Under Construction6p · 2 filings · 15 docs
Floor 1Under Construction44p · 4 filings · 20 docs
CellarUnder Construction9p · 3 filings · 20 docs
Sub-Cellar7p · 2 filings · 20 docs
1 job · most recent 03/04/2026
Sprinkler System
FiledStatusContractorScope
03/04/2026——Sprinkler System
3 jobs · most recent 03/04/2026
Water/Sanitary Storm Gas
FiledStatusContractorScope
03/04/2026——Water/Sanitary
12/12/2025Permit IssuedLIBERTY MECHANICAL CONTStorm, Water/Sanitary
09/22/2020Permit IssuedSATELLITE PLUMBING CORPGas
7 jobs · most recent 05/28/2026
General Wiring
FiledStatusContractorScope
05/28/2026Permit IssuedHIGH QUALITY ELEC.OF NYC—
07/15/2025Permit IssuedDELCO ELECTRICAL CORP.General Wiring
06/10/2025CompleteNGM ELECTRIC INC—
12/10/2021Permit IssuedPREMIUM ELECTRIC INCGeneral Wiring
01/12/2021CompleteHIGH QUALITY ELECTRIC OF—
09/16/2020Permit IssuedC.T.C. ELEC'L CONTRS INCGeneral Wiring
12/21/2019CompleteC.T.C. ELEC'L CONTRS INCGeneral Wiring
2 jobs · most recent 07/30/2026
FiledStatusContractorScope
07/30/2026Permit IssuedSTRUCTUAL PRESV SYSTEM1 scope_items
03/04/2026——1 scope_items
1 job · most recent 06/10/2026
Sidewalk Shed
FiledStatusContractorScope
06/10/2026Permit IssuedKINGS GROUP NY CORPSidewalk Shed
1 job · most recent 07/30/2026
FiledStatusContractorScope
07/30/2026Permit IssuedSTRUCTUAL PRESV SYSTEM—
Building Lifecycle
All (171)Filed (20)Permit Issued (22)Signed Off (2)Facade (FISP) (16)Violation (60)Inspection (3)Objection (18)Special Inspection (30)
09/21/2026
Permit issued — Mechanical Systems
M01078763-I1-MS
09/21/2026
Permit issued — General Construction
M01228903-I1-GC
09/21/2026
Permit issued — General Construction
M00915366-I1-GC
09/08/2026
Permit issued — Sidewalk Shed
M01414799-I1-SH
08/26/2026
Violation issued (HPD, open)
B
08/26/2026
Violation issued (HPD, open)
B
08/26/2026
Violation issued (HPD, open)
B
08/26/2026
Violation issued (HPD, open)
B
08/26/2026
Violation issued (HPD, open)
A
08/26/2026
Violation issued (HPD, open)
A
08/20/2026
Violation issued (HPD, open)
B
08/20/2026
Violation issued (HPD, open)
B
08/20/2026
Violation issued (HPD, open)
B
08/20/2026
Violation issued (HPD, open)
A
08/20/2026
Violation issued (HPD, open)
B
08/20/2026
Violation issued (HPD, open)
B
08/20/2026
Violation issued (HPD, open)
B
08/20/2026
Violation issued (HPD, open)
B
08/20/2026
Violation issued (HPD, open)
C
08/20/2026
Violation issued (HPD, open)
C
08/20/2026
Violation issued (HPD, open)
B
08/20/2026
Violation issued (HPD, open)
B
08/20/2026
Violation issued (HPD, open)
B
08/20/2026
Violation issued (HPD, open)
C
08/20/2026
Violation issued (HPD, open)
B
08/15/2026
Violation issued (HPD, open)
A
08/15/2026
Violation issued (HPD, open)
A
08/12/2026
Permit issued — Suspended Scaffold
M01435588-I1-SC
08/07/2026
Objection resolved — Addressed
08/06/2026
Objection raised — Other
07/30/2026
Filed — Alteration
FACADE INSPECTION Designated Primary Site supervisor: Jesus Decola
M01435588-I1
07/17/2026
Violation issued (HPD, open)
B
07/17/2026
Violation issued (HPD, open)
B
07/17/2026
Violation issued (HPD, open)
C
07/17/2026
Violation issued (HPD, open)
B
07/17/2026
Violation issued (HPD, open)
B
07/17/2026
Violation issued (HPD, open)
B
07/06/2026
Permit issued — General Construction
M01228903-I1-GC
07/01/2026
Permit issued — Plumbing
M01084662-I1-PL
06/24/2026
Violation issued (HPD, open)
B
06/24/2026
Violation issued (HPD, open)
B
06/24/2026
Violation issued (HPD, open)
B
06/24/2026
Violation issued (HPD, open)
B
06/24/2026
Violation issued (HPD, open)
B
06/24/2026
Violation issued (HPD, open)
B
06/24/2026
Violation issued (HPD, open)
C
06/24/2026
Violation issued (HPD, open)
B
06/24/2026
Violation issued (HPD, open)
B
06/24/2026
Violation issued (HPD, open)
B
06/24/2026
Violation issued (HPD, open)
B
06/15/2026
Violation issued (HPD, open)
B
06/15/2026
Violation issued (HPD, closed)
C
06/15/2026
Violation issued (HPD, closed)
B
06/15/2026
Violation issued (HPD, closed)
C
06/15/2026
Violation issued (HPD, closed)
C
06/10/2026
Filed — Alteration
installation of sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
M01414799-I1
06/10/2026
Permit issued — Sidewalk Shed
M01414799-I1-SH
06/08/2026
Violation issued (HPD, open)
B
06/08/2026
Violation issued (HPD, open)
C
06/08/2026
Violation issued (HPD, open)
B
Latest 60 of 171 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KINGS GROUP NY909/09/2026
TAINO TOWERS808/13/2026
EAST HARLEM PILOT,HDFC2503/22/2026
ADVANCED CONSTRUCTION203/22/2026
STRUCTURAL PRESORR SYSTEM103/22/2026
TRAINO TOWERS303/22/2026
HOUSING PRESERVATION303/22/2026
TWIN TOWERS MARVIN GOLD103/22/2026
TOUINO TOWERS203/22/2026
TAINO TOWERS MARVIN GOLD203/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SOMMA DESIGN CONSULTING2203/21/2026
EMPIRE CITY CONSULTANTS, INC.603/21/2026
EB STUDIO EXP203/21/2026
W J PROFESSIONAL EXPEDITING COMPANY403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STRUCTURAL PRESERV SYSTEMGeneral Contractor809/22/2026
KINGS GROUP NY CORPGeneral Contractor709/09/2026
NAN TONG JIN YI CONSTRUCTGeneral Contractor407/08/2026
SATELLITE PLUMBING CORPPlumbing307/08/2026
LIBERTY MECHANICAL CONTPlumbing207/03/2026
VITALE, JOSEPHElectrical103/21/2026
MARK BOBBElectrical103/21/2026
SLSCO,LTDGeneral Contractor104/08/2026
JOSEPH VITALEElectrical103/21/2026
DELCO ELECTRICAL CORP.Electrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CONCESSI ENGINEERING, P.C540601/13/2026
AK ENGINEERING PC678305/27/2025
SOCOTEC ENGINEERING4983205/27/2025
ECOPLUSDESIGN2887111/09/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedSTRUCTURAL PRESERV SYSTEM09/21/2026
DOB NOWGeneral ConstructionPermit IssuedSTRUCTURAL PRESERV SYSTEM09/21/2026
DOB NOWGeneral ConstructionPermit IssuedSTRUCTURAL PRESERV SYSTEM09/21/2026
DOB NOWSidewalk ShedPermit IssuedKINGS GROUP NY CORP09/08/2026
DOB NOWSuspended ScaffoldPermit IssuedSTRUCTUAL PRESV SYSTEM08/12/2026
DOB NOWGeneral ConstructionPermit IssuedSTRUCTURAL PRESERV SYSTEM07/06/2026
DOB NOWPlumbingPermit IssuedLIBERTY MECHANICAL CONT07/01/2026
DOB NOWSidewalk ShedPermit IssuedKINGS GROUP NY CORP06/10/2026
DOB NOWMechanical SystemsPermit IssuedSTRUCTURAL PRESERV SYSTEM09/24/2025
DOB NOWGeneral ConstructionPermit IssuedSTRUCTURAL PRESERV SYSTEM09/23/2025
DOB NOWGeneral ConstructionPermit IssuedSTRUCTURAL PRESERV SYSTEM09/23/2025
DOB NOWMechanical SystemsPermit IssuedSLSCO,LTD07/21/2025
DOB NOWPlumbingPermit IssuedLIBERTY MECHANICAL CONT06/30/2025
DOB NOWGeneral ConstructionSigned-offSTRUCTURAL PRESERV SYSTEM09/09/2024
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP12/23/2022
DOB NOWGeneral ConstructionPermit IssuedNAN TONG JIN YI CONSTRUCT08/12/2022
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP12/20/2021
DOB NOWGeneral ConstructionPermit IssuedNAN TONG JIN YI CONSTRUCT12/03/2021
DOB NOWPlumbingPermit IssuedSATELLITE PLUMBING CORP02/02/2021
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP01/08/2021
DOB NOWPlumbingPermit IssuedSATELLITE PLUMBING CORP05/04/2020
DOB NOWPlumbingPermit IssuedSATELLITE PLUMBING CORP01/08/2020
BISOTISSUEDSTRUCTURAL PRESERV SYSTEM06/28/2023
BISOTISSUEDSTRUCTURAL PRESERV SYSTEM06/28/2022
BISOTISSUEDSTRUCTURAL PRESERV SYSTEM06/30/2021
BISOTISSUEDSTRUCTURAL PRESERV SYSTEM06/19/2020
BISOTISSUEDSTRUCTURAL PRESERV SYSTEM06/27/2019
BISEQISSUEDADVANCED CONSTRUCTION EQUIPMENT07/23/2018
BISOTISSUEDSTRUCTURAL PRESERV SYSTEM06/28/2018
BISEQISSUEDADVANCED CONSTRUCTION EQUIPMENT07/27/2017
BISOTISSUEDSTRUCTURAL PRESERV SYSTEM06/28/2017
BISOTISSUEDSTRUCTURAL PRESERV SYSTEM12/05/2016
BISEQISSUEDADVANCED CONSTRUCTION EQUIPMENT08/09/2016
BISEQISSUEDADVANCED CONSTRUCTION EQUIPMENT10/27/2015
BISEQISSUEDADVANCED CONSTRUCTION EQUIPMENT11/05/2014
BISEQISSUEDADVANCED CONSTRUCTION EQUIPMENT11/06/2013
BISEQISSUEDADVANCED CONSTRUCTION EQUIPMENT11/03/2012
BISEQISSUEDADVANCED CONSTRUCTION EQUIPMENT07/30/2012
BISEQISSUEDEVEREST SCAFFOLDING INC04/04/2007
BISOTISSUEDJADE RESTORATION02/12/2007
+ 10 more permits on file
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
11/21/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/13/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/21/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 72
DateRequirementInspectorRole
03/04/2026Tenant Protection Plan Compliance—special
03/04/2026Tenant Protection Plan Compliance—special
02/10/2026Interior lighting power—energy_progress
02/10/2026Lighting controls—energy_progress
02/09/2026Fire-Resistant Penetrations and Joints—special
02/09/2026Fire-Resistant Penetrations and Joints—special
02/09/2026Post-installed Anchors—special
02/09/2026Post-installed Anchors—special
02/06/2026Fire-Resistant Penetrations and JointsRobert Concessispecial
02/06/2026HVAC-R and service water heating system controls—energy_progress
02/06/2026Metering—energy_progress
02/06/2026Duct leakage testing, insulation and design—energy_progress
02/06/2026FinalRobert Concessiprogress
02/06/2026Lighting controlsRobert Concessienergy_progress
02/06/2026Electrical motors and elevators—energy_progress
02/06/2026Insulation placement and R valuesRobert Concessienergy_progress
02/06/2026Interior lighting powerRobert Concessienergy_progress
02/06/2026Fire-Resistance Rated ConstructionRobert Concessiprogress
02/06/2026Tenant Protection Plan ComplianceRobert Concessispecial
02/06/2026Structural Stability – Alterations of existing buildingsRobert Concessispecial
02/06/2026Post-installed Anchors—special
02/06/2026Tenant Protection Plan Compliance—special
02/06/2026Energy Code Compliance Inspections—progress
02/06/2026HVAC-R and service water piping design and insulation—energy_progress
02/06/2026HVAC-R and service water heating equipment—energy_progress
Latest 25 of 72.
▾Documents — 166 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch17
09/03/2026M00621376-I1Request digital key ↗
08/26/2026M01078763-I1Request digital key ↗
08/26/2026M01054447-P1Request digital key ↗
Showing 3 of 17 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/04/2026M00282312-I1Request digital key ↗
08/15/2026M00282312-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00441871-I1Request digital key ↗
▸Applications & Permits20
▸BISWORK PERMIT APPLICATION11
11/06/2019122805642Open ↗
06/28/2019122805642Open ↗
06/24/2019121147106Open ↗
Showing 3 of 11 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION9
01/24/2024122805642Open ↗
09/15/2020123677734Open ↗
09/03/2020123677734Open ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications67
▸DOB NOWProgress Inspector Seal & Signature25
09/01/2026M00621376-I1Open ↗
09/01/2026M00621376-I1Open ↗
09/01/2026M00621376-I1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature19
09/04/2026M00282312-I1Open ↗
09/04/2026M00282312-P1Open ↗
09/03/2026M00621376-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/01/2026M00621376-I1Open ↗
08/27/2026M01054447-P1Open ↗
08/26/2026M01054447-I1Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
05/23/2017121283869Open ↗
10/28/2016122805642Open ↗
10/14/2016122805642Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/19/2016140536597Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/19/2016140536597Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
08/02/2012121147106Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/19/2016140536597Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
08/02/2012121147106Open ↗
▸Safety & Tenant Protection4
▸DOB NOWTenant Protection Plan2
08/13/2026M00282312-P1Open ↗
08/13/2026M00282312-I1Open ↗
▸BISTenant Protection Plan and Notes1
07/14/2016122805642Open ↗
▸BISSTREET TREE CHECKLIST1
05/23/2017121283869Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
09/04/2026M00282312-I1Open ↗
09/04/2026M00282312-P1Open ↗
09/03/2026M00621376-I1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
10/28/2016122805642Open ↗
10/14/2016122805642Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026M01054447-I1Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
05/23/2017121283869Open ↗
07/14/2016122805642Open ↗
▸Approvals, Objections & Sign-offs22
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter12
08/16/2026M01414799-I1Open ↗
08/13/2026M00915366-P2Open ↗
08/13/2026M00915366-I1Open ↗
Showing 3 of 12 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
11/06/2019122805642Open ↗
06/28/2019122805642Open ↗
12/13/2016122805642Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP Variance (V5) letter3
08/13/2026M01078763-I1Open ↗
08/13/2026M01084662-I1Open ↗
08/13/2026M00915366-I1Open ↗
▸BISSUPERSEDING LETTER1
08/12/2016121147106Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
08/02/2012121147106Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
02/15/2019123677734Open ↗
05/23/2017121283869Open ↗
10/28/2016122805642Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms8
▸BISEFILING COVER SHEET5
02/15/2019123677734Open ↗
05/23/2017121283869Open ↗
05/23/2017121283869Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION2
04/10/2018121147106Open ↗
12/13/2016122805642Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
08/19/2016140536597Open ↗
▸Other Documents7
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
05/23/2017121283869Open ↗
07/14/2016122805642Open ↗
08/02/2012121147106Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
12/13/2016122805642Open ↗
▸BISPLOT DIAGRAM1
05/23/2017121283869Open ↗
▸DOB NOWIRA Certification1
08/15/2026M01435588-I1Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026M01054447-I1Open ↗