Miscellaneous hotel
2384 ATLANTIC AVENUE
BROOKLYN · BIN 3038665
💬 Discuss this project
2023Year Built
—Stories
H9Building Class
C4-5DZoning
43,673 sfGross Floor Area
105Units
LL97 Covered25 Open Violations 18 unresolved · 7 paperwork only ▸FDNY Report ↗
Miscellaneous hotel · Owner of record: FAR ROCKAWAY EQUITIES LLC · 14,000 sf lot · 3.12 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction20p · 4 filings · 20 docs
Floor 8Under Construction26p · 4 filings · 20 docs
Floor 7Under Construction27p · 5 filings · 20 docs
Floor 6Under Construction24p · 5 filings · 20 docs
Floor 5Under Construction24p · 5 filings · 20 docs
Floor 4Under Construction26p · 5 filings · 20 docs
Floor 3Under Construction24p · 5 filings · 20 docs
Floor 2Under Construction25p · 5 filings · 20 docs
Floor 1Under Construction26p · 4 filings · 20 docs
CellarUnder Construction29p · 6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RATHOD2609/19/2026
RELIABLE ENTERPRISES1207/08/2026
MNK ENTERPRISES707/08/2026
DASR1407/08/2026
BRONX407/08/2026
HPD404/09/2026
FAR ROCKAWAY EQUITIES703/22/2026
MILTCHMAN MANAGEMENT CORP103/22/2026
EASTERN INDUSTRIAL DEVELOPMENT403/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/13/2019$6.2M—EASTERN INDUSTRIAL DEVELOPMENT CORP. → FAR ROCKAWAY EQUITIES LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MICHAEL KANG ARCHITECT P C1603/21/2026
SNR EXPEDITING DESIGN203/21/2026
S Y CONSULTING VIOLATIONS203/21/2026
A1 EXPEDITING SERVICE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DASR CORPGeneral Contractor1009/19/2026
RELIABLE ENTERPRISES INCGeneral Contractor707/08/2026
PACIFIC PLBG&HTG CORPPlumbing509/02/2026
PACIFIC PLBG. & HTG. CORPFire Protection407/30/2026
A & H INSTALLATION INCGeneral Contractor307/08/2026
MARK CONTRACTING NY INCGeneral Contractor204/09/2026
MNK ENTERPRISES LLCGeneral Contractor207/08/2026
B T REFINISHING INCGeneral Contractor207/08/2026
LELIS, ARILSONElectrical103/21/2026
JEONG YUNGElectrical103/21/2026
NEU, RICHARDElectrical103/21/2026
HV ELECTRIC CORPElectrical103/22/2026
RICHARD NEUElectrical103/21/2026
SERGIO GIANNACHIElectrical103/21/2026
DEYI LINGElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616410/17/2024
LMW ENGINEERING GROUP LLC279310/27/2021
Building Lifecycle
All (180)Filed (17)Permit Issued (30)Signed Off (6)Violation (56)Inspection (16)Objection (36)Special Inspection (19)
09/18/2026
Permit issued — Mechanical Systems
B00456094-I1-MS
09/01/2026
Permit issued — Standpipe
B00456103-I1-PL
07/29/2026
Permit issued — Standpipe
B00620627-I1-EW-SD
07/10/2026
Violation issued (ECB, open)
Construction
07/10/2026
Violation issued (ECB, open)
Construction
07/10/2026
Violation issued (ECB, open)
Construction
07/10/2026
Violation issued (ECB, open)
Construction
05/13/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/25/2026
Violation issued (ECB, open)
Unknown
04/22/2026
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00934679-I1
04/22/2026
Signed off — Alteration
B00953974-I1
04/16/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/18/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/08/2026
Permit issued — Construction Fence
B00484212-I1-FN
01/07/2026
Violation issued (ECB, open)
Construction
12/29/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/12/2025
Permit issued — Supported Scaffold
B00953974-I1-SF
11/10/2025
Signed off — Alteration
B01030637-I1
11/10/2025
Permit issued — Construction Fence
B00484212-I1-FN
11/10/2025
Violation issued (ECB, open)
Construction
11/06/2025
Permit issued — Sidewalk Shed
B00934679-I1-SH
09/12/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/29/2025
Permit issued — Standpipe
B00620627-I1-EW-SD
05/23/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/16/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
04/16/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/31/2025
Permit issued — Protection and Mechanical Methods
B01030637-I1-PMM
12/10/2024
Permit issued — Supported Scaffold
B00953974-I1-SF
12/06/2024
Permit issued — Sidewalk Shed
B00934679-I1-SH
11/26/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/08/2024
Permit issued — Construction Fence
B00484212-I1-FN
10/23/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/18/2024
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
10/18/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
10/18/2024
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
10/18/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
10/18/2024
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
10/18/2024
Special inspection requirement — Standpipe Systems
FAHAD FATEH
10/17/2024
Filed — Alteration
HEREWITH FILING FOR NEW PL/SP/SD SYSTEM IN CONJUNCTION WITH NB JOB NO.: 340801500
B00456103-P1
10/17/2024
Special inspection requirement — Standpipe Systems
FAHAD FATEH
10/17/2024
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
10/17/2024
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
10/17/2024
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
10/17/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
10/17/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
09/30/2024
Permit issued — Supported Scaffold
B00953974-I1-SF
08/29/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/26/2024
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)
Certified
View inspection ↗
07/25/2024
Permit issued — Standpipe
B00620627-I1-EW-SD
07/01/2024
Violation issued (ECB, open)
Construction
07/01/2024
Violation issued (ECB, open)
Unknown
07/01/2024
Violation issued (ECB, open)
Construction
07/01/2024
Violation issued (ECB, open)
Construction
07/01/2024
Violation issued (ECB, open)
Construction
05/15/2024
Permit issued — Protection and Mechanical Methods
B01030637-I1-PMM
05/14/2024
Filed — Alteration
B01030637-I1
02/29/2024
Permit issued — Structural
B00486785-I1-ST
11/15/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/27/2023
Filed — Alteration
B00953974-I1
10/27/2023
Permit issued — Supported Scaffold
B00953974-I1-SF
Latest 60 of 180 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedDASR CORP09/18/2026
DOB NOWStandpipePermit IssuedPACIFIC PLBG&HTG CORP09/01/2026
DOB NOWStandpipePermit IssuedPACIFIC PLBG. & HTG. CORP07/29/2026
DOB NOWConstruction FencePermit IssuedDASR CORP01/08/2026
DOB NOWSupported ScaffoldSigned-offRELIABLE ENTERPRISES INC11/12/2025
DOB NOWConstruction FencePermit IssuedDASR CORP11/10/2025
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC11/06/2025
DOB NOWStandpipePermit IssuedPACIFIC PLBG. & HTG. CORP07/29/2025
DOB NOWProtection and Mechanical MethodsSigned-offA H INSTALLATION03/31/2025
DOB NOWSupported ScaffoldSigned-offRELIABLE ENTERPRISES INC12/10/2024
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC12/06/2024
DOB NOWConstruction FencePermit IssuedDASR CORP11/08/2024
DOB NOWSupported ScaffoldSigned-offRELIABLE ENTERPRISES INC09/30/2024
DOB NOWStandpipePermit IssuedPACIFIC PLBG. & HTG. CORP07/25/2024
DOB NOWProtection and Mechanical MethodsSigned-offA H INSTALLATION05/15/2024
DOB NOWStructuralPermit IssuedDASR CORP02/29/2024
DOB NOWSupported ScaffoldSigned-offRELIABLE ENTERPRISES INC10/27/2023
DOB NOWConstruction FencePermit IssuedDASR CORP10/20/2023
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC09/15/2023
DOB NOWFoundationPermit IssuedDASR CORP07/12/2023
DOB NOWSprinklersPermit IssuedPACIFIC PLBG&HTG CORP06/30/2023
DOB NOWConstruction FencePermit IssuedDASR CORP04/03/2023
DOB NOWSupport of ExcavationPermit IssuedDASR CORP09/06/2022
DOB NOWStandpipePermit IssuedPACIFIC PLBG. & HTG. CORP09/05/2022
DOB NOWConstruction FencePermit IssuedB T REFINISHING INC07/14/2021
DOB NOWSidewalk ShedSigned-offMNK ENTERPRISES LLC06/13/2021
DOB NOWSupported ScaffoldSigned-offMNK ENTERPRISES LLC06/13/2021
DOB NOWConstruction FencePermit IssuedB T REFINISHING INC05/21/2021
DOB NOWSidewalk ShedSigned-offMARK CONTRACTING NY INC03/11/2020
DOB NOWSidewalk ShedSigned-offMARK CONTRACTING NY INC01/31/2020
BIS—ISSUEDDASR CORP05/19/2025
BIS—ISSUEDDASR CORP05/14/2024
BIS—ISSUEDDASR CORP10/19/2023
BIS—ISSUEDDASR CORP04/13/2023
BIS—ISSUEDB T REFINISHING INC07/30/2021
BISFSISSUEDM. DEL PERCIO & CO., INC.01/03/2007
BISOTISSUEDA.L. EASTMONF & SONS10/23/2006
BISPLISSUEDWEXLER PLUMBING & HEATING INC04/03/1996
BISBLISSUEDNEAL M. RUDIKOFF04/03/1996
BISFAISSUEDV-MAR ELECTRIC01/25/1995
+ 3 more permits on file
2 projects · most recent 10/17/2024
FiledStatusContractorScope
10/17/2024——643 heads, 2 outlets
11/01/2021Permit IssuedPACIFIC PLBG. & HTG. CORP1 outlets
1 project · most recent 10/17/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
10/17/2024Permit IssuedPACIFIC PLBG&HTG CORPGas, Storm, Water/Sanitary
6 projects · most recent 10/08/2025
General Wiring
FiledStatusContractorScope
10/08/2025Permit IssuedINTELOGIC ELECTRIC, INC.General Wiring
04/08/2024CompleteRICHARD NEU—
12/12/2023Permit IssuedHV ELECTRIC CORPGeneral Wiring
09/15/2023CompleteRICHARD NEU—
06/11/2021Permit IssuedRICHARD NEU—
02/04/2020Permit IssuedWCK ELECTRIC CORP.—
1 project · most recent 10/27/2021
FiledStatusContractorScope
10/27/2021Permit IssuedDASR CORP1 scope_items
1 project · most recent 03/12/2021
Fence
FiledStatusContractorScope
03/12/2021Permit IssuedDASR CORPFence
▾Field Inspections (DOB CAP) — 16
DateTypeResultReport
05/13/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/16/2026Pass-Final CND-Occupancy InspectionPassView ↗
02/18/2026Pass-Final CND-Occupancy InspectionPassView ↗
12/29/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/12/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/23/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/16/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
04/16/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/23/2024Pass-Final CND-Occupancy InspectionPassView ↗
08/29/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/26/2024Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
08/25/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/25/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/09/2023Pass-Final CND-Occupancy InspectionPassView ↗
07/03/2023Pass-Final CND-Occupancy InspectionPassView ↗
06/13/2023Fail-Final CND-Occupancy InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
10/18/2024Sprinkler SystemsFAHAD FATEHspecial
10/18/2024HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
10/18/2024HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
10/18/2024Maintenance informationFAHAD FATEHenergy_progress
10/18/2024HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
10/18/2024Standpipe SystemsFAHAD FATEHspecial
10/17/2024Standpipe SystemsFAHAD FATEHspecial
10/17/2024HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
10/17/2024Sprinkler SystemsFAHAD FATEHspecial
10/17/2024HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
10/17/2024Maintenance informationFAHAD FATEHenergy_progress
10/17/2024HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
11/04/2021Subsurface Investigations (Borings/Test Pits)FAHAD FATEHspecial
10/28/2021Standpipe SystemsFAHAD FATEHspecial
03/15/2021Footing and FoundationJieming Wangprogress
03/15/2021FinalJieming Wangprogress
03/15/2021Subgrade InspectionsJieming Wangspecial
03/15/2021Excavations - Sheeting, Shoring, and BracingJieming Wangspecial
03/15/2021Concrete - Cast-In-PlaceJieming Wangspecial
▾Documents — 158 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch10
09/01/2026B00484212-I1Request digital key ↗
09/01/2026B00538388-I1Request digital key ↗
09/01/2026B00538397-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
08/23/2026B00456103-P1Request digital key ↗
08/15/2026B00456103-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Standpipe2
08/23/2026B00456103-P1Request digital key ↗
08/15/2026B00456103-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
08/23/2026B00456103-P1Request digital key ↗
08/15/2026B00456103-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment1
08/15/2026B00469258-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/01/2026B00456094-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/01/2026B00356159-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00304836-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Support of Excavation1
08/31/2026B00475603-I1Request digital key ↗
▸Applications & Permits15
▸BISPLAN / WORK APPROVAL APPLICATION10
10/12/2021340801500Open ↗
09/08/2021340801500Open ↗
08/16/2021340811857Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION3
04/17/2023340801500Open ↗
07/30/2021322069630Open ↗
06/04/2021322069630Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation2
03/23/2022340811857Open ↗
08/16/2021340811857Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
02/04/2021340801500Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
10/25/2021340801500Open ↗
▸BISZONING DIAGRAM1
10/25/2021340801500Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
10/25/2021340801500Open ↗
▸Seals & Professional Certifications35
▸DOB NOWDPL-1: Design Professional Seal & Signature17
09/01/2026B00469258-I1Open ↗
09/01/2026B00456094-I1Open ↗
09/01/2026B00538388-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/23/2026B00456103-I1Open ↗
09/01/2026B00620627-I1Open ↗
08/26/2026B00486558-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/23/2026B00456103-I1Open ↗
08/26/2026B00486558-I1Open ↗
08/26/2026B00486558-I1Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
08/16/2021340811857Open ↗
02/04/2021340801500Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
02/25/2020322069630Open ↗
05/11/2010320164433Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
05/11/2010320164433Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
02/04/2021340801500Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
05/11/2010320164433Open ↗
▸Trade Schedules & Equipment4
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
04/23/2021340801500Open ↗
▸BISSTANDPIPE ALARM DRAWINGS & AI1 (OR AI1 PROOF)1
04/07/2023340801500Open ↗
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)1
04/23/2021340801500Open ↗
▸BISSTANDPIPE WORK PERMIT1
04/05/2023340801500Open ↗
▸Safety & Tenant Protection7
▸BISSTREET TREE CHECKLIST3
10/12/2021340801500Open ↗
08/16/2021340811857Open ↗
02/04/2021340801500Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
04/05/2023340801500Open ↗
▸BISBPP: STREET TREES SITE PLAN1
03/23/2022340811857Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
06/04/2021322069630Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
06/04/2021322069630Open ↗
▸Environmental & Asbestos15
▸DOB NOWOER: Notice to Proceed11
08/15/2026B00469258-I1Open ↗
08/13/2026B00486785-I1Open ↗
08/13/2026B00456103-P1Open ↗
Showing 3 of 11 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED2
03/23/2022340811857Open ↗
10/25/2021340801500Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
05/11/2010320164433Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/04/2021322069630Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
02/04/2021340801500Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
02/04/2021340801500Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
10/12/2021340801500Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
04/05/2023340801500Open ↗
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY3
10/12/2021340801500Open ↗
10/12/2021340801500Open ↗
10/12/2021340801500Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
04/05/2023340801500Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
04/05/2023340801500Open ↗
▸BISSOIL REPORT1
02/04/2021340801500Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
04/17/2023340801500Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF1
04/05/2023340801500Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
04/05/2023340801500Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00486558-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026B00486558-I1Open ↗
▸Approvals, Objections & Sign-offs17
▸BISSCHEDULE A - OCCUPANCY / USE8
10/12/2021340801500Open ↗
09/08/2021340801500Open ↗
05/27/2021340801500Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
10/25/2021340801500Open ↗
07/30/2021322069630Open ↗
07/30/2021322069630Open ↗
Showing 3 of 7 on file for this type
▸BISLANDMARKS APPROVAL1
06/04/2021322069630Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
05/11/2010320164433Open ↗
▸Cost, Insurance & Ownership3
▸BISPROJECT-SPECIFIC GL INSURANCE3
04/05/2023340801500Open ↗
07/30/2021322069630Open ↗
06/04/2021322069630Open ↗
▸Filing & Intake Forms8
▸BISEFILING JOB APPLICATION COVER SHEET2
08/16/2021340811857Open ↗
02/04/2021340801500Open ↗
▸BISEFILING COVER SHEET2
02/25/2020322069630Open ↗
05/11/2010320164433Open ↗
▸BISADDITIONAL INFORMATION2
03/23/2022340811857Open ↗
07/30/2021322069630Open ↗
▸BISBOROUGH INTAKE FORM1
06/04/2021322069630Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
08/16/2021340811857Open ↗
▸Other Documents14
▸BISBPP - SUPPORTING DOCUMENTATION10
03/23/2022340811857Open ↗
08/16/2021340811857Open ↗
08/16/2021340811857Open ↗
Showing 3 of 10 on file for this type
▸BISPLOT DIAGRAM2
04/23/2021340801500Open ↗
02/04/2021340801500Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
02/04/2021340801500Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00475603-I1Open ↗