← Back
Two family frame
239-10 147 DRIVE
QUEENS · BIN 4291702
💬 Discuss this project
1950Year Built
2Stories
B2Building Class
R3XZoning
2,695 sfGross Floor Area
2Units
4 Open Violations ▸FDNY Report ↗
Two family frame · 2,700 sf lot · 1 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 3 docs
Floor 22p · 1 filing · 14 docs
Floor 12p · 1 filing · 14 docs
Cellar2p · 1 filing · 14 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/09/2022$1.1M—— → —$412/sf building
09/02/2021$575K—— → —$213/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TRINITY SOLAR LLC106/12/2026
ST DESIGN & CONSULTING INC.203/15/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
R H DRUMMOND EXP403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SHANE WALTERSGeneral Contractor107/08/2026
TRINITY SOLAR LLCGeneral Contractor106/28/2026
LLOYD G DRUMMOND PLBG&GENPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BITOPI CONSULTANTS LLC7036106/12/2026
LIGHTHOUSE5538101/20/2022
Building Lifecycle
All (23)Filed (3)Permit Issued (3)Violation (4)Inspection (7)Special Inspection (6)
06/22/2026
Permit issued — Solar
Q01415319-I1-SL
06/12/2026
Filed — Alteration
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
Q01415319-I1
11/18/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/18/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/18/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/14/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/20/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/13/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/13/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/13/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/04/2022
Permit issued — Plumbing
Q00642498-S1-PL
03/15/2022
Filed — Alteration
Application filed for interior renovation from cellar to 2nd floor. Remove non-loadbearing partition walls. replacing or repairing wooden fl finish, ceiling, and walls as necessary as per plan. This application will not affect any use, egress or occupancy
Q00642498-S1
03/14/2022
Special inspection requirement — HVAC-R and service water heating equipment
SAMIR ABDALLA
03/14/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMIR ABDALLA
03/14/2022
Special inspection requirement — HVAC-R and service water heating system controls
SAMIR ABDALLA
03/01/2022
Permit issued — General Construction
Q00642498-I1-GC
01/20/2022
Filed — Alteration
Application filed for interior renovation from cellar to 2nd floor. Remove non-loadbearing partition walls. replacing or repairing wooden fl finish, ceiling, and walls as necessary as per plan. This application will not affect any use, egress or occupancy
Q00642498-I1
01/17/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMIR ABDALLA
01/17/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMIR ABDALLA
01/17/2022
Special inspection requirement — Lighting in dwelling units
SAMIR ABDALLA
07/26/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/14/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/25/2002
Violation issued (HPD, open)
A
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedTRINITY SOLAR LLC06/22/2026
DOB NOWPlumbingSigned-offLLOYD G DRUMMOND PLBG&GEN05/04/2022
DOB NOWGeneral ConstructionPermit IssuedSHANE WALTERS03/01/2022
1 project · most recent 03/15/2022
Gas Water/Sanitary
FiledStatusContractorScope
03/15/2022Signed-offLLOYD G DRUMMOND PLBG&GENGas, Water/Sanitary
2 projects · most recent 06/08/2026
General Wiring
FiledStatusContractorScope
06/08/2026CompleteREDLINE ELECTRIC INC—
12/02/2022CompleteTRINCITY ELECTRIC, INCGeneral Wiring
1 project · most recent 06/12/2026
FiledStatusContractorScope
06/12/2026Permit IssuedTRINITY SOLAR LLC16 panels, 6.56 kw, 1,173 roof_area_sqft
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
11/18/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/18/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/18/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/20/2022Fail-Final General Construction Non-Directive 14FailView ↗
05/13/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/13/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/13/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
03/14/2022HVAC-R and service water heating equipmentSAMIR ABDALLAenergy_progress
03/14/2022HVAC-R and service water piping design and insulationSAMIR ABDALLAenergy_progress
03/14/2022HVAC-R and service water heating system controlsSAMIR ABDALLAenergy_progress
01/17/2022Fire-Resistant Penetrations and JointsSAMIR ABDALLAspecial
01/17/2022Structural Stability – Alterations of existing buildingsSAMIR ABDALLAspecial
01/17/2022Lighting in dwelling unitsSAMIR ABDALLAenergy_progress
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/26/2026Q00642498-I1Request digital key ↗
08/26/2026Q00642498-S1Request digital key ↗
08/16/2026Q01415319-I1Request digital key ↗
▸Seals & Professional Certifications9
▸DOB NOWProgress Inspector Seal & Signature4
08/25/2026Q00642498-I1Open ↗
08/24/2026Q00642498-S1Open ↗
08/24/2026Q00642498-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/16/2026Q01415319-I1Open ↗
08/13/2026Q00642498-I1Open ↗
08/13/2026Q00642498-S1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026Q00642498-I1Open ↗
08/25/2026Q00642498-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/16/2026Q01415319-I1Open ↗
08/13/2026Q00642498-S1Open ↗
08/13/2026Q00642498-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026Q00642498-I1Open ↗
08/13/2026Q00642498-S1Open ↗