← Back
BuildNYC
Self-storage warehouse
239 11TH AVENUE
MANHATTAN · BIN 1075683
💬 Discuss this project
1913Year Built
9Stories
E7Building Class
M1-5Zoning
217,350 sfGross Floor Area
11Units
LL97 Covered0 Active ViolationsFISP: SWARMP
Self-storage warehouse · Owner of record: Bulgroup Colorado · 23,848 sf lot · 9.11 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofNorth River Company LLCUnder Construction6p · 2 filings · 19 docs
BulkheadNorth River Company LLC8p · 1 filing · 7 docs
Floor 1Guggenheim1p · 1 filing · 4 docs
CellarGuggenheim7p · 2 filings · 12 docs
Site & exteriorNorth River Company LLCUnder Construction13p · 3 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Bullgroup Properties6003/22/2026
Waterfront NY Realty5603/21/2026
North River Company3508/26/2026
Phoenix103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Kma Designs105/18/2026
Patriz C. Consultants305/12/2026
Ashraf103/14/2024
Kendall Engineering311/11/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Aca Associates103/21/2026
Kma Designs203/21/2026
D D Expeditors403/21/2026
Premier Expediting Services303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Winstar Restorationspecialty_contractor1208/26/2026
Kings Group NYScaffold407/08/2026
Winstar RestorationScaffold308/26/2026
Go Greener PlumbingPlumbing307/08/2026
Flemington Electrical Maintenance IElectrical103/21/2026
Rosvoglou DimitriosElectrical103/21/2026
Schondorf MichaelElectrical103/21/2026
High Quality Electric ofElectrical103/21/2026
Walton Electrical ConstructionElectrical103/21/2026
North River CompanyGeneral Contractor107/08/2026
Martin TurchinElectrical103/21/2026
All City ElectricalElectrical103/21/2026
Absolute Electrical ContgElectrical103/21/2026
Delta Electrical ContractingElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Patriz C. Consultants7191305/12/2026
Kendall Engineering4154108/11/2020
Building Lifecycle
All (118)Filed (9)Permit Issued (18)Signed Off (4)Facade (FISP) (15)Violation (60)Inspection (2)Objection (4)Special Inspection (6)
08/25/2026
Signed off — Alteration
facade inspection, exterior facade repair
M01239808-I1
08/18/2026
Permit issued — Suspended Scaffold
M01239808-I1-SC
07/16/2026
Permit issued — General Construction
M08025050-I1-GC
07/16/2026
Permit issued — Supported Scaffold
M01402300-I1-SF
07/08/2026
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
07/07/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/30/2026
Permit issued — Suspended Scaffold
M01239808-I1-SC
06/30/2026
Permit issued — General Construction
M08025050-I1-GC
06/30/2026
Permit issued — Supported Scaffold
M01402300-I1-SF
06/09/2026
Permit issued — Sidewalk Shed
M01019666-I1-SH
05/19/2026
Permit issued — Supported Scaffold
M01402300-I1-SF
05/18/2026
Filed — Alteration
installation of pipe scaffolding. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
M01402300-I1
05/14/2026
Special inspection requirement — Post-installed Anchors
Navkiran Cheema
05/12/2026
Filed — Alteration
Facade repairs to include concrete patching/pinning, cut/cleaning/caulk joints, window caulking, restoring steel windows, and elastomeric coating.
M08025050-P1
05/07/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
SHAWN KELLY
05/07/2026
Special inspection requirement — Final
SHAWN KELLY
03/11/2026
Permit issued — Sidewalk Shed
M01019666-I1-SH
10/16/2025
Permit issued — General Construction
M08025050-I1-GC
07/17/2025
Permit issued — General Construction
M08025050-I1-GC
06/26/2025
Permit issued — Suspended Scaffold
M01239808-I1-SC
06/25/2025
Objection raised — Other
06/25/2025
Objection resolved — Addressed
06/24/2025
Objection resolved — Addressed
06/20/2025
Permit issued — General Construction
M08025050-I1-GC
06/18/2025
Objection raised — Admin
06/11/2025
Filed — Alteration
facade inspection, exterior facade repair
M01239808-I1
03/09/2025
Permit issued — Sidewalk Shed
M01019666-I1-SH
03/15/2024
Permit issued — Sidewalk Shed
M01019666-I1-SH
03/14/2024
Filed — Alteration
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.
M01019666-I1
02/02/2024
Signed off — Alteration
Interior bulkhead repairs, restoring window opening, concret patching at steel beams/supports, caulking.
M00907083-I1
02/02/2024
Filed — Alteration
Facade repairs to include concrete patching/pinning, cut/cleaning/caulk joints, window caulking, restoring steel windows, and elastomeric coating.
M08025050-I1
10/19/2023
Permit issued — General Construction
M00907083-I1-GC
07/21/2023
Filed — Alteration
Interior bulkhead repairs, restoring window opening, concret patching at steel beams/supports, caulking.
M00907083-I1
07/20/2023
Special inspection requirement — Masonry
SHAWN KELLY
07/20/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
SHAWN KELLY
07/20/2023
Special inspection requirement — Final
SHAWN KELLY
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/10/2021
Cycle 9 facade report submitted
12/10/2021
Cycle 9 facade report signed — SWARMP
10/22/2021
Cycle 9 facade inspection completed
07/15/2021
Signed off — Alteration
Installation of new Con Edison gas regulator to increase volume of gas service
M00377330-I1
01/19/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/19/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/19/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/19/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/19/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/19/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/19/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/11/2020
Filed — Alteration
Installation of new Con Edison gas regulator to increase volume of gas service
M00377330-P1
11/04/2020
Signed off — Alteration
Filing herewith for installation of Fresh Air Intake vent for new gas meter room
M00307205-I1
09/08/2020
Permit issued — Plumbing
M00377330-I1-PL
08/25/2020
Permit issued — Mechanical Systems
M00307205-I1-MS
Latest 60 of 118 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedWinstar Contracting08/18/2026
DOB NOWGeneral ConstructionPermit IssuedWinstar Restoration07/16/2026
DOB NOWSupported ScaffoldPermit IssuedWinstar Restoration07/16/2026
DOB NOWSuspended ScaffoldPermit IssuedWinstar Contracting06/30/2026
DOB NOWGeneral ConstructionPermit IssuedWinstar Restoration06/30/2026
DOB NOWSupported ScaffoldPermit IssuedWinstar Restoration06/30/2026
DOB NOWSidewalk ShedPermit IssuedKings Group NY06/09/2026
DOB NOWSupported ScaffoldPermit IssuedWinstar Restoration05/19/2026
DOB NOWSidewalk ShedPermit IssuedKings Group NY03/11/2026
DOB NOWGeneral ConstructionPermit IssuedWinstar Restoration10/16/2025
DOB NOWGeneral ConstructionPermit IssuedWinstar Restoration07/17/2025
DOB NOWSuspended ScaffoldPermit IssuedWinstar Contracting06/26/2025
DOB NOWGeneral ConstructionPermit IssuedWinstar Restoration06/20/2025
DOB NOWSidewalk ShedPermit IssuedKings Group NY03/09/2025
DOB NOWSidewalk ShedPermit IssuedKings Group NY03/15/2024
DOB NOWGeneral ConstructionSigned-offWinstar Restoration10/19/2023
DOB NOWPlumbingSigned-offGo Greener Plumbing09/08/2020
DOB NOWMechanical SystemsSigned-offNorth River Company08/25/2020
BISPLISSUEDGo Greener Plumbing04/08/2025
BIS—ISSUEDNorth River Company07/15/2024
BISOTISSUEDNorth River Company08/21/2020
BISMHISSUEDWework Construction05/04/2020
BISOTISSUEDWework Construction05/04/2020
BISOTISSUEDWework Construction05/04/2020
BISOTISSUEDWework Construction05/04/2020
BISOTISSUEDWework Construction05/04/2020
BISOTISSUEDWework Construction05/04/2020
BISOTISSUEDWework Construction05/04/2020
BISMHISSUEDWework Construction05/04/2020
BISMHISSUEDWework Construction05/04/2020
BISMHISSUEDWework Construction09/24/2019
BISOTISSUEDWework Construction09/24/2019
BISOTISSUEDWework Construction09/24/2019
BISPLISSUEDPSI Plumbing09/05/2019
BISOTISSUEDWework Construction05/24/2019
BISOTISSUEDNorth River Company05/06/2019
BISPLISSUEDGo Greener Plumbing05/03/2019
BISSPISSUEDGo Greener Plumbing05/03/2019
BISOTISSUEDNorth River Company05/02/2019
BISMHISSUEDNorth River Company05/02/2019
+ 28 more permits on file
1 project · most recent 03/18/2024
FiledStatusContractorScope
03/18/2024Permit IssuedHigh Quality Electric of—
2 projects · most recent 05/18/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
05/18/2026Permit IssuedWinstar RestorationScaffold
03/14/2024Permit IssuedKings Group NYSidewalk Shed
1 project · most recent 06/11/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
06/11/2025Permit IssuedWinstar ContractingSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/08/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
07/07/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
05/14/2026Post-installed AnchorsNavkiran Cheemaspecial
05/07/2026Structural Stability – Alterations of existing buildingsSHAWN KELLYspecial
05/07/2026FinalSHAWN KELLYprogress
07/20/2023MasonrySHAWN KELLYspecial
07/20/2023Structural Stability – Alterations of existing buildingsSHAWN KELLYspecial
07/20/2023FinalSHAWN KELLYprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
GuggenheimOfficeCellar, Floor 1
Project M00307205 Alteration · LOC Issued · 08/11/2020
Project M00377330 Alteration · LOC Issued · 08/11/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 966 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch6
08/29/2026M00907083-I1Request digital key ↗
08/28/2026M08025050-I1Request digital key ↗
08/28/2026M08025050-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/04/2026M00377330-I1Request digital key ↗
08/15/2026M00377330-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00307205-I1Request digital key ↗
▸Applications & Permits228
▸BISWORK PERMIT APPLICATION114
04/09/2025123185034Open ↗
04/01/2025123185034Open ↗
03/26/2025123185034Open ↗
Showing 3 of 114 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION106
02/25/2026121082238Open ↗
02/24/2026121082238Open ↗
07/18/2025121082238Open ↗
Showing 3 of 106 on file for this type
▸DOB NOWLPC Approval/Permit6
08/28/2026M08025050-P1Open ↗
08/13/2026M00907083-I1Open ↗
08/13/2026M08025050-I1Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Seals & Professional Certifications186
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION115
12/16/2019123590809Open ↗
09/24/2019123751573Open ↗
09/24/2019123751573Open ↗
Showing 3 of 115 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT25
08/20/2020140938485Open ↗
05/01/2019123890165Open ↗
Showing 2 of 25 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST25
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 25 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/04/2026M00377330-P1Open ↗
09/04/2026M00377330-I1Open ↗
08/29/2026M00907083-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/28/2026M08025050-P1Open ↗
08/25/2026M00907083-I1Open ↗
08/25/2026M00907083-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
08/20/2020140938485Open ↗
Showing 1 of 2 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
08/20/2020140938485Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/28/2026M08025050-P1Open ↗
08/25/2026M00907083-I1Open ↗
▸Trade Schedules & Equipment82
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 21 on file for this type
▸BISSELF-CERT PLUMBING NOTICE17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISEQUIPMENT USE PERMITS10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA9
01/23/2025122806605Open ↗
07/17/2020123556847Open ↗
Showing 2 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING8
06/05/2025123185034Open ↗
05/23/2025123185034Open ↗
01/29/2025123185034Open ↗
Showing 3 of 8 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISSPRINKLER INSP REPORT : FP-854
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISOK TO ISSUE TCO PENDING RESOLUTION OFOPEN BOILER VIOLATIONS - AFFIDAVIT ATTACHED1
04/30/2024121082238Open ↗
▸BISHEATING SYSTEMS1
03/31/2023123185034Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Environmental & Asbestos43
▸BISASBESTOS: CERTIFICATION (DEP ACP5)30
08/20/2020140938485Open ↗
07/01/2019123751573Open ↗
05/01/2019123890165Open ↗
Showing 3 of 30 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/04/2026M00377330-P1Open ↗
09/04/2026M00377330-I1Open ↗
08/29/2026M00907083-I1Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance20
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISENERGY CODE 1ST REVIEW COMPLETE6
05/01/2019123890165Open ↗
Showing 1 of 6 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISNYCECC EXEMPTION1
08/20/2020140938485Open ↗
▸Inspections & Test Reports26
▸BISTECHNICAL REPORT: RESPONSIBILITY18
03/22/2024123185034Open ↗
03/22/2024123185034Open ↗
02/16/2021140938485Open ↗
Showing 3 of 18 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)3
03/31/2023123185034Open ↗
09/15/2022122338274Open ↗
08/03/2022123021103Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION2
09/15/2022122338274Open ↗
08/03/2022123021103Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
09/15/2022122338274Open ↗
▸BISHYDRO FLOW TEST LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs136
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST41
12/18/2025122806605Open ↗
11/26/2025123185034Open ↗
09/16/2022122338274Open ↗
Showing 3 of 41 on file for this type
▸BISLANDMARKS APPROVAL33
08/20/2020140938485Open ↗
09/12/2019123737723Open ↗
08/05/2019123751573Open ↗
Showing 3 of 33 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE16
02/25/2026121082238Open ↗
02/24/2026121082238Open ↗
07/18/2025121082238Open ↗
Showing 3 of 16 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION9
05/08/2020123558792Open ↗
05/08/2020123890165Open ↗
08/05/2019123751573Open ↗
Showing 3 of 9 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION9
03/27/2020123558792Open ↗
Showing 1 of 9 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISSUPERSEDING LETTER7
04/09/2025123185034Open ↗
05/08/2020123751573Open ↗
05/08/2019110211949Open ↗
Showing 3 of 7 on file for this type
▸BISLANDMARKS SIGNOFF7
04/03/2023123185034Open ↗
09/06/2022122250250Open ↗
08/05/2022123021103Open ↗
Showing 3 of 7 on file for this type
▸BISFINAL4
03/31/2023123185034Open ↗
09/15/2022122338274Open ↗
08/03/2022123021103Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS2
05/08/2020123468096Open ↗
Showing 1 of 2 on file for this type
▸Cost, Insurance & Ownership85
▸BISCOST AFFIDAVIT78
08/20/2020140938485Open ↗
07/20/2020123556847Open ↗
07/17/2020123751573Open ↗
Showing 3 of 78 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW37
12/17/2025122806605Open ↗
11/26/2025121697707Open ↗
03/31/2023123185034Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms125
▸BISEFILING COVER SHEET51
07/01/2019123751573Open ↗
07/01/2019123751573Open ↗
07/01/2019123751573Open ↗
Showing 3 of 51 on file for this type
▸BISADDITIONAL INFORMATION41
02/24/2026121082238Open ↗
02/24/2026121082238Open ↗
08/19/2024121082238Open ↗
Showing 3 of 41 on file for this type
▸BISBOROUGH INTAKE FORM29
07/16/2024121082238Open ↗
05/08/2020123558792Open ↗
05/08/2020123468096Open ↗
Showing 3 of 29 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
08/20/2020140938485Open ↗
Showing 1 of 4 on file for this type
▸Other Documents12
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPLOT DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWProof of Historic Building2
08/28/2026M08025050-P1Open ↗
08/13/2026M08025050-I1Open ↗
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSupporting Document: Fee Deferment1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCHIMNEYS AND VENTS1
03/22/2024123185034Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01239808-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01239808-I1Open ↗