← Back
BuildNYC
Elevator apt, converted
239 BANKER STREET
BROOKLYN · Greenpoint · BIN 3337695
💬 Discuss this project
1915Year Built
4Stories
D5Building Class
M1-1Zoning
—Gross Floor Area
69Units
7 Active Violations ▸FDNY Report ↗
Elevator apt, converted · Owner of record: Workable 239 · 3.61 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofWorkable Acquisitions LLC54p · 8 filings · 20 docs
Floor 4Unit 4A, Unit 4B, Unit 4D +250p · 7 filings · 20 docs
Floor 3Workable Acquisitions LLC50p · 7 filings · 20 docs
Floor 2Workable Acquisitions LLC51p · 7 filings · 20 docs
Floor 1Unit 1J52p · 7 filings · 20 docs
Cellar1 filing · 3 docs
Site & exteriorSidewalk shed, roof protection, and pipe scaffolding install6p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Workable Acquisitions4807/08/2026
Perlmutter403/21/2026
239 Banker Street TA103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Outhere Space103/21/2026
Paknia Engineering & Architecture803/21/2026
Socotec1003/21/2026
Green Studio203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Platinum Services NYScaffold604/09/2026
Blue Water BuildersGeneral Contractor507/08/2026
DDS Mechanical FPSFire Protection407/08/2026
MNBC ElectricalElectrical103/22/2026
D.D.S. Mechanical PBG & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Metric Consulting and Ins18031101/03/2025
Building Lifecycle
10/21/2026
Work without a permit. At time of inspection observed full height partitions creating 2 bedrooms in apartment 3N, obtain all permits
ECB violation · open
10/21/2026
Failure to maintain building in code-compliant manner. At time of inspection observed sprinkler system improperly maintained, sprinkler heads in…
ECB violation · open
10/21/2026
Work does not conform to approved construction documents and/or approved amendments. At time of inspection observed wall in front of apartment 4F…
ECB violation · open
10/21/2026
Failure to maintain building in code-compliant manner. Atoi observed building fire doors defective, door is not self closing adequately, fire exit…
ECB violation · open
10/21/2026
Failure to maintain building in code-compliant manner: no fire stopping per bc 712.3 (2014 code); 27-345; bc 711.2.4 (2022 code. At time of…
ECB violation · open
300 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offBlue Water Builders12/03/2024
DOB NOWStructuralSigned-offBlue Water Builders12/02/2024
DOB NOWStandpipeSigned-offDDS Mechanical FPS11/19/2024
DOB NOWSidewalk ShedSigned-offPlatinum Services NY07/10/2024
DOB NOWSupported ScaffoldSigned-offPlatinum Services NY07/03/2024
DOB NOWSprinklersSigned-offDDS Mechanical FPS05/31/2024
DOB NOWStructuralSigned-offBlue Water Builders12/04/2023
DOB NOWPlumbingSigned-offD.D.S. Mechanical PBG & Heating12/04/2023
DOB NOWMechanical SystemsSigned-offBlue Water Builders11/29/2023
DOB NOWMechanical SystemsSigned-offBlue Water Builders11/29/2023
DOB NOWStandpipeSigned-offDDS Mechanical FPS11/28/2023
DOB NOWSidewalk ShedSigned-offPlatinum Services NY07/20/2023
DOB NOWSidewalk ShedSigned-offPlatinum Services NY07/20/2023
DOB NOWSprinklersSigned-offDDS Mechanical FPS06/08/2023
BIS—ISSUEDBlue Water Builders03/11/2025
BIS—ISSUEDBlue Water Builders03/25/2024
BIS—ISSUEDBlue Water Builders06/07/2023
BISOTISSUEDPremier Restoration10/16/2020
BISOTISSUEDAtweek04/30/2012
BIS—ISSUEDTrogir Construction01/25/2011
BISEQISSUEDTrogir Construction01/25/2011
BISEQISSUED291 Kent Properties12/10/2009
BISEQISSUEDAmkay Plumbing and Heating11/06/2008
BISPLISSUEDAmkay Plumbing and Heating07/30/2008
BISEQISSUEDAmkay Plumbing & Heating07/28/2008
BISEQISSUEDBijoy Construction03/11/2008
BISPLISSUEDZ.W. Plumbing & Heating06/13/2000
BISMHISSUEDDarek Construction of New York06/12/2000
BISPLISSUEDSeickel 7 Son Plumbing11/06/1998
BISBLISSUEDSeickel 7 Son Plumbing11/06/1998
BISOTISSUEDN/A01/10/1994
BISOTISSUEDRobert Leonard04/19/1993
4 projects · most recent 08/05/2025
General Wiring
FiledStatusContractorScope
08/05/2025CompleteMNBC ElectricalGeneral Wiring
01/03/2024CompleteTuxedo Electrical Contracting—
05/03/2023CompleteIlluminous ElectricGeneral Wiring
01/27/2020CompletePower Surge Electric—
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
12/05/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/05/2024Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
12/02/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
12/02/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/25/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/25/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
12/19/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
12/19/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 45
DateRequirementInspectorRole
01/30/2025Standpipe SystemsSAMI HAJJAR P.Especial
01/30/2025Post-installed AnchorsSAMI HAJJAR P.Especial
01/30/2025Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
01/02/2025Standpipe SystemsSAMI HAJJAR P.Especial
01/02/2025Post-installed AnchorsSAMI HAJJAR P.Especial
01/02/2025Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
12/02/2024HVAC and service water heating equipment SAMI HAJJAR P.Eenergy_progress
12/02/2024Maintenance informationSAMI HAJJAR P.Eenergy_progress
12/02/2024Post-installed AnchorsSAMI HAJJAR P.Especial
12/02/2024Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
12/02/2024Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
12/02/2024HVAC and service water heating system controls SAMI HAJJAR P.Eenergy_progress
12/02/2024Permanent certificateSAMI HAJJAR P.Eenergy_progress
12/02/2024HVAC insulation and sealing SAMI HAJJAR P.Eenergy_progress
12/02/2024Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
12/02/2024Mechanical SystemsSAMI HAJJAR P.Especial
12/02/2024Heating SystemsSAMI HAJJAR P.Especial
12/02/2024FinalSAMI HAJJAR P.Eprogress
12/02/2024Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
12/02/2024Shutoff dampersSAMI HAJJAR P.Eenergy_progress
12/02/2024HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
12/02/2024Ventilation and air distribution systemSAMI HAJJAR P.Eenergy_progress
12/02/2024HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
12/02/2024Maintenance informationSAMI HAJJAR P.Eenergy_progress
12/02/2024Permanent certificateSAMI HAJJAR P.Eenergy_progress
Latest 25 of 45.
234 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account