One story retail building
239 KINGS HIGHWAY
BROOKLYN · BIN 3176663
💬 Discuss this project
1971Year Built
1Stories
K1Building Class
R7AZoning
2,804 sfGross Floor Area
1Units
One story retail building · 3,060 sf lot · 0.92 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof4p · 1 filing · 20 docs
Floor 116p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AR ARCHITECT P.C1411/07/2025
ADL ENGINEERING LLC209/21/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADAC CONSTRUCTION3203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AMOKGeneral Contractor403/22/2026
YAFE MEOD CORPGeneral Contractor407/08/2026
AMOK INCPlumbing407/08/2026
PFL MECHANICAL CORPPlumbing207/08/2026
FIRST CNSTRCTION ZONE INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AR ARCHITECT P.C.11711411/07/2025
Building Lifecycle
All (140)Filed (16)Permit Issued (6)Inspection (10)Objection (78)Special Inspection (30)
04/21/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/24/2025
Special inspection requirement — Energy Code Compliance Inspections
ANGEL ROJAS
11/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANGEL ROJAS
11/11/2025
Objection resolved — Addressed
11/11/2025
Objection resolved — Addressed
11/10/2025
Objection raised — Scope
11/10/2025
Objection raised — Admin
11/07/2025
Filed — Alteration CO
NEW INSTALLATION OF (10) FLOOR DRAINS, (1) MOP SINK, (2) HAND SINKS, (2) 3COMP SINKS, (2)commercial-grade grease traps, (1) high-capacity water heater, (1)LAVATORY, (1)TOILET, (11) commercial-grade COOKING EQUIPMENT, (2)NEW SHUT-OFF VALVES.
B00617659-A3
10/02/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ANGEL ROJAS
10/02/2025
Special inspection requirement — Shutoff dampers
ANGEL ROJAS
10/02/2025
Special inspection requirement — Final
ANGEL ROJAS
10/02/2025
Special inspection requirement — HVAC-R and service water heating equipment
10/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANGEL ROJAS
10/02/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
ANGEL ROJAS
10/02/2025
Special inspection requirement — Mechanical Systems
ANGEL ROJAS
10/02/2025
Special inspection requirement — HVAC-R and service water heating system controls
10/01/2025
Objection resolved — Addressed
09/23/2025
Objection raised — Cost
09/21/2025
Filed — Alteration CO
NEW INSTALLATION OF (10) FLOOR DRAINS, (1) MOP SINK, (2) HAND SINKS, (2) 3COMP SINKS, (2)commercial-grade grease traps, (1) high-capacity water heater, (1)LAVATORY, (1)TOILET, (11) commercial-grade COOKING EQUIPMENT, (2)NEW SHUT-OFF VALVES.
B00617659-A1
09/21/2025
Filed — Alteration CO
NEW INSTALLATION OF (10) FLOOR DRAINS, (1) MOP SINK, (2) HAND SINKS, (2) 3COMP SINKS, (2)commercial-grade grease traps, (1) high-capacity water heater, (1)LAVATORY, (1)TOILET, (11) commercial-grade COOKING EQUIPMENT, (2)NEW SHUT-OFF VALVES.
B00617659-A2
09/21/2025
Filed — Alteration CO
NEW INSTALLATION OF (10) FLOOR DRAINS, (1) MOP SINK, (2) HAND SINKS, (2) 3COMP SINKS, (2)commercial-grade grease traps, (1) high-capacity water heater, (1)LAVATORY, (1)TOILET, (11) commercial-grade COOKING EQUIPMENT, (2)NEW SHUT-OFF VALVES.
B00617659-P9
09/19/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ANGEL ROJAS
09/19/2025
Special inspection requirement — Shutoff dampers
ANGEL ROJAS
09/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANGEL ROJAS
09/19/2025
Special inspection requirement — HVAC-R and service water heating system controls
09/19/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
ANGEL ROJAS
09/19/2025
Special inspection requirement — Mechanical Systems
ANGEL ROJAS
09/19/2025
Special inspection requirement — Final
ANGEL ROJAS
09/19/2025
Special inspection requirement — HVAC-R and service water heating equipment
06/30/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/30/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/18/2025
Objection resolved — Addressed
06/14/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/29/2025
Permit issued — Plumbing
B00617659-S2-PL
05/29/2025
Objection resolved — Addressed
05/23/2025
Permit issued — General Construction
B00617659-I1-GC
05/06/2025
Objection resolved — Addressed
05/01/2025
Objection raised — Scope
05/01/2025
Objection raised — Scope
04/30/2025
Special inspection requirement — Masonry
ANGEL ROJAS
04/30/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
ANGEL ROJAS
04/30/2025
Special inspection requirement — Fenestration areas
ANGEL ROJAS
04/30/2025
Special inspection requirement — Fenestration air leakage
ANGEL ROJAS
04/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANGEL ROJAS
04/30/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
ANGEL ROJAS
04/22/2025
Objection resolved — Addressed
04/22/2025
Objection resolved — Addressed
04/22/2025
Objection resolved — Addressed
04/22/2025
Objection resolved — Addressed
04/02/2025
Objection raised — Accessibility
04/02/2025
Objection raised — Accessibility
04/02/2025
Objection raised — Zoning
04/02/2025
Objection raised — Scope
03/26/2025
Objection resolved — Addressed
03/26/2025
Objection resolved — Addressed
03/25/2025
Objection raised — Other
03/25/2025
Objection raised — Other
03/25/2025
Objection resolved — Addressed
03/21/2025
Objection raised — Scope
03/18/2025
Objection raised — Scope
Latest 60 of 140 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAMOK INC05/29/2025
DOB NOWGeneral ConstructionPermit IssuedFIRST CNSTRCTION ZONE05/23/2025
DOB NOWPlumbingSigned-offPFL MECHANICAL CORP11/21/2023
DOB NOWConstruction FencePermit IssuedYAFE MEOD CORP04/29/2022
DOB NOWPlumbingSigned-offPFL MECHANICAL CORP04/29/2022
DOB NOWGeneral ConstructionPermit IssuedYAFE MEOD CORP02/25/2022
BISMHISSUEDKINGS DENTAL GROUP03/11/1999
1 project · most recent 11/07/2025
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
11/07/2025Permit IssuedFIRST CNSTRCTION ZONE INCVentilation Systems
Ventilation
Spring Air FN-B-MC-ZH (U) 4,500 CFM · Exhaust Fan ×13
M-A3800 3,800 CFM · Makeup Air ×7
Panasonic Panasonic Model # FV-20VQ3 190 CFM · Exhaust Fan ×12
1 project · most recent 11/07/2025
Gas Water/Sanitary
FiledStatusContractorScope
11/07/2025Signed-offAMOK INCGas, Water/Sanitary
2 projects · most recent 12/03/2025
General Wiring
FiledStatusContractorScope
12/03/2025Permit IssuedKINGS ELECTRIC CO., INC.General Wiring
04/05/2022Permit IssuedKINGS ELECTRIC CO., INC.General Wiring
1 project · most recent 11/07/2025
Fence
FiledStatusContractorScope
11/07/2025Signed-offAMOK INCFence
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
04/21/2026Pass-Final CND-Occupancy InspectionPassView ↗
06/30/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/30/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/14/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/28/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/12/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/23/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/15/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/13/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/20/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 44
DateRequirementInspectorRole
11/24/2025Energy Code Compliance InspectionsANGEL ROJASprogress
11/24/2025Fire-Resistant Penetrations and JointsANGEL ROJASspecial
10/02/2025HVAC-R and service water piping design and insulationANGEL ROJASenergy_progress
10/02/2025Shutoff dampersANGEL ROJASenergy_progress
10/02/2025FinalANGEL ROJASprogress
10/02/2025HVAC-R and service water heating equipment—energy_progress
10/02/2025Fire-Resistant Penetrations and JointsANGEL ROJASspecial
10/02/2025Structural Stability – Alterations of existing buildingsANGEL ROJASspecial
10/02/2025Mechanical SystemsANGEL ROJASspecial
10/02/2025HVAC-R and service water heating system controls—energy_progress
09/19/2025HVAC-R and service water piping design and insulationANGEL ROJASenergy_progress
09/19/2025Shutoff dampersANGEL ROJASenergy_progress
09/19/2025Fire-Resistant Penetrations and JointsANGEL ROJASspecial
09/19/2025HVAC-R and service water heating system controls—energy_progress
09/19/2025Structural Stability – Alterations of existing buildingsANGEL ROJASspecial
09/19/2025Mechanical SystemsANGEL ROJASspecial
09/19/2025FinalANGEL ROJASprogress
09/19/2025HVAC-R and service water heating equipment—energy_progress
04/30/2025MasonryANGEL ROJASspecial
04/30/2025Fenestration and door U-factor and product ratingsANGEL ROJASenergy_progress
04/30/2025Fenestration areasANGEL ROJASenergy_progress
04/30/2025Fenestration air leakageANGEL ROJASenergy_progress
04/30/2025Fire-Resistant Penetrations and JointsANGEL ROJASspecial
04/30/2025Structural Stability – Alterations of existing buildingsANGEL ROJASspecial
03/13/2025HVAC-R and service water heating system controls—energy_progress
Latest 25 of 44.
▾Documents — 95 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
08/22/2026B00617659-P9Request digital key ↗
08/22/2026B00617659-P8Request digital key ↗
08/22/2026B00617659-P3Request digital key ↗
Showing 3 of 15 on file for this type
▸Seals & Professional Certifications51
▸DOB NOWSpecial Inspector Seal & Signature19
09/02/2026B00617659-P6Open ↗
08/31/2026B00617659-P1Open ↗
08/31/2026B00617659-P7Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature17
09/02/2026B00617659-P6Open ↗
08/31/2026B00617659-P7Open ↗
08/31/2026B00617659-P7Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/22/2026B00617659-A3Open ↗
08/22/2026B00617659-A2Open ↗
08/22/2026B00617659-P9Open ↗
Showing 3 of 15 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist3
08/22/2026B00617659-I1Open ↗
08/15/2026B00617659-P2Open ↗
08/14/2026B00617659-P5Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00617659-I1Open ↗
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report15
08/22/2026B00617659-P9Open ↗
08/22/2026B00617659-P8Open ↗
08/22/2026B00617659-P3Open ↗
Showing 3 of 15 on file for this type
▸Other Documents10
▸DOB NOWProperty Ownership Certification9
08/22/2026B00617659-P9Open ↗
08/22/2026B00617659-S2Open ↗
08/22/2026B00617659-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWWaiver Document1
08/13/2026B00617659-I1Open ↗