← Back
Public elementary, junior or senior high
2390 PITKIN AVENUE
BROOKLYN · BIN 3089209
💬 Discuss this project
2022Year Built
4Stories
W1Building Class
R7AZoning
39,000 sfGross Floor Area
1Units
LL97 Covered2 Open Violations ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: CIVIC SHERMAN LLC · 10,761 sf lot · 3.62 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof47p · 1 filing · 20 docs
Floor 436p · 1 filing · 20 docs
Floor 336p · 1 filing · 20 docs
Floor 236p · 1 filing · 20 docs
Floor 136p · 1 filing · 20 docs
Cellar47p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ALBA SERVICES607/08/2026
CONSTRUCTION GROUP NOBLE303/22/2026
CIVIL SHERMAN LLC103/22/2026
NOBLE CONSTRUCTION GR1103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MARVEL ARCHITECTS810/11/2023
TRC ENGINEERS, INC.209/12/2023
POLISE CONSULTING ENGINEERS DPC808/09/2023
FL&M ENGINEERING DESIGN &INSPECTION1005/12/2023
ANCORA ENGINEERING, PLLC205/02/2022
SILMAN209/10/2021
ASHRAF CORP109/09/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GEORGE E BERGER ASSOCIATES4403/21/2026
KD DESIGNS103/21/2026
Rigid Structural Design, LLC1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NOBLE CONSTRUCTION GR LLCGeneral Contractor3107/08/2026
TRI BOROUGH SCAFFOLDINGGeneral Contractor1607/08/2026
TEAM ELECTRIC INC 003506General Contractor403/22/2026
ROBERT LOGOZIOElectrical403/21/2026
HEADQUARTERS MECH INCPlumbing307/08/2026
ALBA SERVICES INCGeneral Contractor203/21/2026
PEAK FIRE PROTECTION LLCFire Protection207/08/2026
PEAK PLUMBING SOLUTIONS LLCPlumbing207/08/2026
MC SUPERSTRUCTURE INCGeneral Contractor107/08/2026
KEVIN BOGERElectrical103/21/2026
SIGNATURE SAFETY LLCElectrical103/21/2026
TEAM ELECTRIC, INCElectrical103/22/2026
JOHN AHRENSElectrical103/21/2026
MFS CONSULTING ENGINEERSGeneral Contractor103/22/2026
TUXEDO ELECL CONTRG INC 004066General Contractor103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOMANI INSPECTION SERVICE8431310/11/2023
ANCORA ENGINEERING, PLLC6818305/02/2022
Building Lifecycle
All (213)Filed (32)Permit Issued (27)Signed Off (12)Violation (18)Inspection (14)Objection (80)Special Inspection (30)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/01/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/04/2024
Signed off — New Building
IT IS PROPOSED TO ERECT A NEW 4 STORY CHARTER SCHOOL AS SHOWN ON PLANS.
B00557447-S9
11/28/2023
Signed off — New Building
IT IS PROPOSED TO ERECT A NEW 4 STORY CHARTER SCHOOL AS SHOWN ON PLANS.
B00557447-S4
11/21/2023
Signed off — New Building
IT IS PROPOSED TO ERECT A NEW 4 STORY CHARTER SCHOOL AS SHOWN ON PLANS.
B00557447-S6
11/21/2023
Signed off — New Building
IT IS PROPOSED TO ERECT A NEW 4 STORY CHARTER SCHOOL AS SHOWN ON PLANS.
B00557447-S3
11/20/2023
Signed off — New Building
IT IS PROPOSED TO ERECT A NEW 4 STORY CHARTER SCHOOL AS SHOWN ON PLANS.
B00557447-S7
11/13/2023
Signed off — New Building
IT IS PROPOSED TO ERECT A NEW 4 STORY CHARTER SCHOOL AS SHOWN ON PLANS.
B00557447-S5
10/11/2023
Filed — New Building
IT IS PROPOSED TO ERECT A NEW 4 STORY CHARTER SCHOOL AS SHOWN ON PLANS.
B00557447-A2
10/11/2023
Signed off — New Building
IT IS PROPOSED TO ERECT A NEW 4 STORY CHARTER SCHOOL AS SHOWN ON PLANS.
B00557447-S2
10/11/2023
Signed off — New Building
IT IS PROPOSED TO ERECT A NEW 4 STORY CHARTER SCHOOL AS SHOWN ON PLANS.
B00557447-S1
10/11/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
10/11/2023
Special inspection requirement — Air barrier continuity plan testing
JOHN MCMONAGLE
10/11/2023
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
JOHN MCMONAGLE
10/11/2023
Special inspection requirement — Fenestration areas
JOHN MCMONAGLE
10/11/2023
Special inspection requirement — Air barrier - visual inspection
JOHN MCMONAGLE
10/11/2023
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
10/11/2023
Special inspection requirement — Sprayed fire-resistant materials
JOHN MCMONAGLE
10/11/2023
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
JOHN MCMONAGLE
10/11/2023
Special inspection requirement — Protection of exposed foundation insulation
JOHN MCMONAGLE
10/11/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
JOHN MCMONAGLE
10/11/2023
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
JOHN MCMONAGLE
10/11/2023
Special inspection requirement — Fire-Resistance Rated Construction
JOHN MCMONAGLE
10/11/2023
Special inspection requirement — Fenestration air leakage
JOHN MCMONAGLE
10/11/2023
Special inspection requirement — Air barrier — testing
JOHN MCMONAGLE
10/11/2023
Special inspection requirement — Insulation placement and R values
JOHN MCMONAGLE
10/11/2023
Special inspection requirement — Vestibules
JOHN MCMONAGLE
10/02/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/20/2023
Filed — New Building
IT IS PROPOSED TO ERECT A NEW 4 STORY CHARTER SCHOOL AS SHOWN ON PLANS.
B00557447-A1
09/16/2023
Permit issued — General Construction
B00557447-S9-GC
09/15/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/12/2023
Filed — New Building
IT IS PROPOSED TO ERECT A NEW 4 STORY CHARTER SCHOOL AS SHOWN ON PLANS.
B00557447-S9
09/11/2023
Signed off — Alteration
Installation of a temporarily construction fence and sidewalk shed with overhead and roof protection as per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00708397-I1
09/11/2023
Signed off — Alteration
Installation of a temporarily supported scaffold and working platform per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00816850-I1
09/11/2023
Signed off — Alteration
Installation of temporary storage of materials per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B08015720-I1
08/31/2023
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
08/28/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/21/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
08/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
08/16/2023
Special inspection requirement — Standpipe Systems
JOHN MCMONAGLE
08/16/2023
Special inspection requirement — Sprinkler Systems
JOHN MCMONAGLE
08/11/2023
Special inspection requirement — HVAC-R and service water heating system controls
JOHN MCMONAGLE
08/11/2023
Special inspection requirement — HVAC-R and service water heating equipment
JOHN MCMONAGLE
08/11/2023
Special inspection requirement — Heating Systems
JOHN MCMONAGLE
08/09/2023
Filed — New Building
IT IS PROPOSED TO ERECT A NEW 4 STORY CHARTER SCHOOL AS SHOWN ON PLANS.
B00557447-P8
08/08/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
08/08/2023
Special inspection requirement — Sprinkler Systems
JOHN MCMONAGLE
08/08/2023
Special inspection requirement — Standpipe Systems
JOHN MCMONAGLE
08/07/2023
Filed — New Building
IT IS PROPOSED TO ERECT A NEW 4 STORY CHARTER SCHOOL AS SHOWN ON PLANS.
B00557447-P7
08/02/2023
Inspection — Certified StandPipe-Fire Pump (SD)-Fire Pump Test
Certified
View inspection ↗
07/31/2023
Permit issued — Protection and Mechanical Methods
B08015720-I1-PM
07/25/2023
Objection resolved — Addressed
07/21/2023
Special inspection requirement — Public Assembly Emergency Lighting
JOHN MCMONAGLE
07/20/2023
Inspection — Certification Failed StandPipe-Fire Pump (SD)-Fire Pump Test
Certification Failed
View inspection ↗
07/19/2023
Objection resolved — Addressed
07/17/2023
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
07/14/2023
Filed — No Work
B00771929-P1
07/12/2023
Violation issued (ECB, closed)
Construction
07/12/2023
Violation issued (ECB, closed)
Construction
Latest 60 of 213 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offNOBLE CONSTRUCTION GR LLC09/16/2023
DOB NOWProtection and Mechanical MethodsSigned-offMC SUPERSTRUCTURE INC07/31/2023
DOB NOWGeneral ConstructionPermit IssuedNOBLE CONSTRUCTION GR LLC07/05/2023
DOB NOWMechanical SystemsSigned-offNOBLE CONSTRUCTION GR LLC06/29/2023
DOB NOWBoiler EquipmentSigned-offPEAK PLUMBING SOLUTIONS L05/24/2023
DOB NOWBoiler EquipmentSigned-offPEAK PLUMBING SOLUTIONS L04/24/2023
DOB NOWStructuralSigned-offNOBLE CONSTRUCTION GR LLC04/20/2023
DOB NOWConstruction FenceSigned-offTRI BOROUGH SCAFFOLDING04/08/2023
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING04/06/2023
DOB NOWFoundationSigned-offNOBLE CONSTRUCTION GR LLC03/15/2023
DOB NOWStandpipeSigned-offPEAK FIRE PROTECTION LLC02/27/2023
DOB NOWSprinklersSigned-offPEAK FIRE PROTECTION LLC02/27/2023
DOB NOWSupported ScaffoldSigned-offTRI BOROUGH SCAFFOLDING01/30/2023
DOB NOWPlumbingSigned-offHEADQUARTERS MECH INC01/13/2023
DOB NOWProtection and Mechanical MethodsSigned-offTRI BOROUGH SCAFFOLDING10/12/2022
DOB NOWPlumbingSigned-offHEADQUARTERS MECH INC07/21/2022
DOB NOWMechanical SystemsSigned-offNOBLE CONSTRUCTION GR LLC07/13/2022
DOB NOWGeneral ConstructionPermit IssuedNOBLE CONSTRUCTION GR LLC07/06/2022
DOB NOWGeneral ConstructionPermit IssuedNOBLE CONSTRUCTION GR LLC06/23/2022
DOB NOWStructuralSigned-offNOBLE CONSTRUCTION GR LLC04/18/2022
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING04/13/2022
DOB NOWConstruction FenceSigned-offTRI BOROUGH SCAFFOLDING04/13/2022
DOB NOWFoundationSigned-offNOBLE CONSTRUCTION GR LLC03/17/2022
DOB NOWSupport of ExcavationSigned-offNOBLE CONSTRUCTION GR LLC02/15/2022
DOB NOWGeneral ConstructionPermit IssuedNOBLE CONSTRUCTION GR LLC02/14/2022
DOB NOWConstruction FenceSigned-offNOBLE CONSTRUCTION GR LLC01/16/2022
DOB NOWConstruction FenceSigned-offALBA SERVICES INC09/10/2021
BISOTISSUEDNOBLE CONSTRUCTION GR LLC09/20/2023
BISEQISSUEDALBA SERVICES INC09/16/2021
BIS—ISSUEDALBA SERVICES INC09/16/2021
1 project · most recent 10/11/2023
Others
FiledStatusContractorScopeMake / Model / Capacity
10/11/2023Signed-offNOBLE CONSTRUCTION GR LLCOthers
Other
Aaon RN-050-8 50 tons · Rooftop Unit ×2
CFA-026-D 26 tons · Rooftop Unit ×1
RN-018-8 18 tons · Rooftop Unit ×1
RN-026-8 26 tons · Rooftop Unit ×1
1 project · most recent 10/11/2023
Sprinkler System
FiledStatusContractorScope
10/11/2023Signed-offPEAK FIRE PROTECTION LLCSprinkler System
1 project · most recent 10/11/2023
Gas Storm Water/Sanitary
FiledStatusContractorScope
10/11/2023Signed-offPEAK PLUMBING SOLUTIONS LGas, Storm, Water/Sanitary
2 projects · most recent 01/12/2024
General Wiring
FiledStatusContractorScope
01/12/2024CompleteTUXEDO ELEC'L CONTR'G INC—
11/01/2023CompleteTEAM ELECTRIC, INCGeneral Wiring
1 project · most recent 10/11/2023
Steel Concrete
FiledStatusContractorScope
10/11/2023Signed-offNOBLE CONSTRUCTION GR LLCSteel, Concrete
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
04/01/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/02/2023Pass-Final CND-Occupancy InspectionPassView ↗
09/15/2023Pass-Final CND-Occupancy InspectionPassView ↗
08/31/2023Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
08/28/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/21/2023Pass-Final Boiler Equipment InspectionPassView ↗
08/02/2023Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
07/20/2023Certification Failed StandPipe-Fire Pump (SD)-Fire Pump TestCertification FailedView ↗
07/17/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
06/01/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/24/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/24/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/17/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/17/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 63
DateRequirementInspectorRole
10/11/2023Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
10/11/2023Exterior Insulation and Finish Systems (EIFS)JOHN MCMONAGLEspecial
10/11/2023Mastic and Intumescent Fire-resistant CoatingsJOHN MCMONAGLEspecial
10/11/2023Sprayed fire-resistant materialsJOHN MCMONAGLEspecial
10/11/2023Wall Panels, Curtain Walls, and VeneersJOHN MCMONAGLEspecial
10/11/2023Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
10/11/2023Fire-Resistance Rated ConstructionJOHN MCMONAGLEprogress
10/11/2023VestibulesJOHN MCMONAGLEenergy_progress
10/11/2023Air barrier continuity plan testingJOHN MCMONAGLEenergy_progress
10/11/2023Fenestration areasJOHN MCMONAGLEenergy_progress
10/11/2023Protection of exposed foundation insulationJOHN MCMONAGLEenergy_progress
10/11/2023Air barrier - visual inspectionJOHN MCMONAGLEenergy_progress
10/11/2023Fenestration and door U-factor and product ratingsJOHN MCMONAGLEenergy_progress
10/11/2023Fenestration air leakageJOHN MCMONAGLEenergy_progress
10/11/2023Air barrier — testing JOHN MCMONAGLEenergy_progress
10/11/2023Insulation placement and R valuesJOHN MCMONAGLEenergy_progress
08/16/2023Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
08/16/2023Standpipe SystemsJOHN MCMONAGLEspecial
08/16/2023Sprinkler SystemsJOHN MCMONAGLEspecial
08/11/2023HVAC-R and service water heating equipmentJOHN MCMONAGLEenergy_progress
08/11/2023Heating SystemsJOHN MCMONAGLEspecial
08/11/2023HVAC-R and service water heating system controlsJOHN MCMONAGLEenergy_progress
08/08/2023Sprinkler SystemsJOHN MCMONAGLEspecial
08/08/2023Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
08/08/2023Standpipe SystemsJOHN MCMONAGLEspecial
Latest 25 of 63.
▾Documents — 254 on file (BIS + DOB NOW)
▸Plans & Drawings33
▸DOB NOWPlans/Sketch30
09/01/2026B00550546-I1Request digital key ↗
08/30/2026B00708397-P1Request digital key ↗
08/30/2026B00708397-P2Request digital key ↗
Showing 3 of 30 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly3
08/27/2026B00771929-P1Request digital key ↗
08/15/2026B00771929-I1Request digital key ↗
08/14/2026B00779962-I1Request digital key ↗
▸Applications & Permits12
▸DOB NOWHPD - Permit Notice4
08/13/2026B00557447-S4Open ↗
08/13/2026B00557447-I1Open ↗
08/13/2026B00557447-S1Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
03/17/2023340821855Open ↗
09/30/2021340821855Open ↗
04/06/2021322090660Open ↗
▸BISWORK PERMIT APPLICATION3
09/20/2023340890619Open ↗
09/17/2021322090660Open ↗
09/17/2021322090660Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation2
07/11/2023340821855Open ↗
04/26/2023340821855Open ↗
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZD1: DOB Zoning Diagram5
08/14/2026B00557447-I1Open ↗
08/13/2026B00557447-P2Open ↗
08/13/2026B00557447-A2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)2
08/14/2026B00557447-I1Open ↗
08/13/2026B00557447-A2Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00557447-I1Open ↗
▸Seals & Professional Certifications68
▸DOB NOWDPL-1: Design Professional Seal & Signature33
09/01/2026B00550546-I1Open ↗
08/30/2026B00708397-P1Open ↗
08/30/2026B00708397-P2Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/19/2026B00771929-P1Open ↗
09/01/2026B00771929-I1Open ↗
09/01/2026B00557447-S1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/01/2026B00557447-S1Open ↗
09/01/2026B00557447-S1Open ↗
09/01/2026B00557447-S1Open ↗
Showing 3 of 13 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
08/23/2023340890619Open ↗
06/13/2023340890619Open ↗
09/30/2021340821855Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
12/03/2021322090660Open ↗
09/17/2021322090660Open ↗
09/17/2021322090660Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/30/2021340821855Open ↗
▸Trade Schedules & Equipment9
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)7
08/14/2026B00557447-I1Open ↗
08/13/2026B00557447-S9Open ↗
08/13/2026B00557447-P2Open ↗
Showing 3 of 7 on file for this type
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)1
03/29/2023340821855Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/14/2026B00557447-I1—
▸Safety & Tenant Protection20
▸DOB NOWStreet Tree Checklist7
08/26/2026B00557447-P2Open ↗
08/26/2026B00557447-S9Open ↗
08/26/2026B00557447-A1Open ↗
Showing 3 of 7 on file for this type
▸BISSTREET TREE CHECKLIST2
07/03/2023340821855Open ↗
09/30/2021340821855Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan2
08/13/2026B00557447-S9Open ↗
08/13/2026B00557447-I1Open ↗
▸DOB NOWStreet Tree Sign Off2
08/13/2026B00557447-I1Open ↗
08/13/2026B00557447-S9Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
04/26/2023340821855Open ↗
▸BISBPP: STREET TREES SITE PLAN1
09/30/2021340821855Open ↗
▸BISSTREET TREE SIGNOFF1
10/16/2023340821855Open ↗
▸BISANTI-HARASSMENT CHECKLIST1
09/17/2021322090660Open ↗
▸BISSTREET TREES SITE PLAN1
10/16/2023340821855Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
09/17/2021322090660Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00557447-I1Open ↗
▸Environmental & Asbestos36
▸DOB NOWOER: Notice to Proceed22
08/14/2026B00557447-I1Open ↗
08/13/2026B00557447-A2Open ↗
08/13/2026B00557447-S4Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWOER: Notice of Satisfaction9
08/14/2026B00557447-I1Open ↗
08/13/2026B00557447-A2Open ↗
08/13/2026B00557447-A3Open ↗
Showing 3 of 9 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED2
06/13/2023340890619Open ↗
04/25/2022340821855Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION2
10/16/2023340821855Open ↗
10/12/2023340890619Open ↗
▸BISRODENT CONTROL1
09/17/2021322090660Open ↗
▸Energy Compliance10
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00557447-S3Open ↗
08/13/2026B00557447-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026B00557447-I1Open ↗
08/13/2026B00557447-S6Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
08/25/2023340890619Open ↗
▸BISNYCECC ANALYSIS1
09/14/2023340890619Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
10/13/2023340890619Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
10/13/2023340890619Open ↗
▸BISEXTERIOR LIGHTING POWER1
10/13/2023340890619Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
10/13/2023340890619Open ↗
▸Inspections & Test Reports5
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
10/13/2023340890619Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
09/01/2023340890619Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
10/13/2023340890619Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
10/13/2023340890619Open ↗
▸DOB NOWTR5 Test Report1
08/13/2026B00557447-S1Open ↗
▸Approvals, Objections & Sign-offs9
▸BISLETTERS - SUPPORTING DOCUMENTATION5
11/22/2023340890619Open ↗
11/22/2023340890619Open ↗
08/23/2023340890619Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
11/22/2023340890619Open ↗
▸BISFINAL1
10/13/2023340890619Open ↗
▸BISLANDMARKS APPROVAL1
09/17/2021322090660Open ↗
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL1
04/25/2022340821855Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT1
09/14/2023340890619Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
09/17/2021322090660Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
09/17/2021322090660Open ↗
▸DOB NOWCertification by Insurance Broker or Agency1
08/13/2026B00557447-I1Open ↗
▸DOB NOWCertificate of Insurance1
08/13/2026B00557447-I1Open ↗
▸Filing & Intake Forms10
▸BISADDITIONAL INFORMATION4
09/01/2023340890619Open ↗
08/23/2023340890619Open ↗
08/23/2023340890619Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
06/13/2023340890619Open ↗
09/30/2021340821855Open ↗
▸BISBOROUGH INTAKE FORM2
12/03/2021322090660Open ↗
04/06/2021322090660Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
07/11/2023340821855Open ↗
▸BISEFILING COVER SHEET1
04/06/2021322090660Open ↗
▸Other Documents29
▸DOB NOWSite Survey: Initial7
08/14/2026B00557447-I1Open ↗
08/13/2026B00557447-P4Open ↗
08/13/2026B00557447-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone7
08/14/2026B00557447-I1Open ↗
08/13/2026B00557447-P4Open ↗
08/13/2026B00557447-S9Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWAlternate Plan 12
08/27/2026B00771929-P1Open ↗
08/15/2026B00771929-I1Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
09/14/2023340890619Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
05/05/2023340821855Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
04/13/2022340821855Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
07/03/2023340821855Open ↗
▸BISENCROACHMENT ONTO SIDEWALK: DOT REVOCABLE CONSENT1
08/23/2023340890619Open ↗
▸DOB NOWAlternate Plan 31
08/14/2026B00779962-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00557447-I1Open ↗
▸DOB NOWAlternate Plan 21
08/14/2026B00779962-I1Open ↗
▸DOB NOWAdditional Insured Authorizations1
08/13/2026B00557447-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00557447-S5Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026B00557447-P1Open ↗
▸DOB NOWAlternate Plan 51
08/14/2026B00779962-I1Open ↗
▸DOB NOWAlternate Plan 41
08/14/2026B00779962-I1Open ↗