← Back
Miscellaneous hotel
2391 GRAND CONCOURSE
BRONX · BIN 2094668
💬 Discuss this project
1911Year Built
4Stories
H9Building Class
C4-4Zoning
26,400 sfGross Floor Area
7Units
LL97 CoveredRent Stabilized18 Open Violations ▸
Miscellaneous hotel · Owner of record: PARADISE RESIDENCE INC · 7,820 sf lot · 3.38 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Floor 41p · 1 filing · 12 docs
Floor 32p · 1 filing · 12 docs
Floor 2
Floor 11p · 1 filing · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SAHARA CONTRACTING203/22/2026
OWNER OF 2391 GRAND CO103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ZENESIS ENGINEERING / ARCHITECTURE403/11/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
zenesis group303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SAHARA CONTRACTING CORPGeneral Contractor207/08/2026
JOHN MOOREElectrical103/21/2026
MOORE, JOHNElectrical103/21/2026
EH PLUMBING & HEATING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ZENESIS ENGINEERING/ARCHI1473403/11/2026
Building Lifecycle
All (56)Filed (4)Permit Issued (3)Signed Off (3)Violation (34)Inspection (3)Special Inspection (9)
06/22/2026
Signed off — Alteration
REAR EXTERIOR FACADE REPAIRS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X01370194-I1
04/30/2026
Violation issued (HPD, open)
A
04/07/2026
Permit issued — General Construction
X01370194-I1-GC
03/11/2026
Filed — Alteration
REAR EXTERIOR FACADE REPAIRS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X01370194-I1
03/10/2026
Special inspection requirement — Final
RAJENDRA PARIKH
03/10/2026
Special inspection requirement — Masonry
RAJENDRA PARIKH
03/10/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
RAJENDRA PARIKH
03/10/2026
Special inspection requirement — Tenant Protection Plan Compliance
RAJENDRA PARIKH
06/05/2025
Violation issued (HPD, open)
A
05/14/2024
Signed off — Alteration
Filing PAA to reflect as-built conditions. Removal and replacement of existing flooring, sub-flooring, ceilings and plaster at interior partitions for visual inspection of floor framing members. No change in use, egress or occupancy.
X00832190-S1
05/13/2024
Signed off — Alteration
Filing PAA to reflect as-built conditions. Removal and replacement of existing flooring, sub-flooring, ceilings and plaster at interior partitions for visual inspection of floor framing members. No change in use, egress or occupancy.
X00832190-I1
04/02/2024
Violation issued (HPD, open)
A
03/19/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/16/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/10/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/22/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/27/2023
Permit issued — Plumbing
X00832190-S1-PL
09/23/2023
Filed — Alteration
Filing PAA to reflect as-built conditions. Removal and replacement of existing flooring, sub-flooring, ceilings and plaster at interior partitions for visual inspection of floor framing members. No change in use, egress or occupancy.
X00832190-S1
09/18/2023
Special inspection requirement — Tenant Protection Plan Compliance
RAJENDRA PARIKH
09/05/2023
Filed — Alteration
Filing PAA to reflect as-built conditions. Removal and replacement of existing flooring, sub-flooring, ceilings and plaster at interior partitions for visual inspection of floor framing members. No change in use, egress or occupancy.
X00832190-P1
09/03/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAJENDRA PARIKH
09/03/2023
Special inspection requirement — Tenant Protection Plan Compliance
09/03/2023
Special inspection requirement — Final
RAJENDRA PARIKH
09/03/2023
Special inspection requirement — Fire-Resistance Rated Construction
RAJENDRA PARIKH
08/14/2023
Violation issued (ECB, closed)
Construction
08/14/2023
Violation issued (ECB, closed)
Construction
07/06/2023
Permit issued — General Construction
X00832190-I1-GC
06/13/2023
Filed — Alteration
Filing PAA to reflect as-built conditions. Removal and replacement of existing flooring, sub-flooring, ceilings and plaster at interior partitions for visual inspection of floor framing members. No change in use, egress or occupancy.
X00832190-I1
03/17/2023
Violation issued (HPD, open)
A
02/17/2022
Violation issued (HPD, closed)
I
02/17/2022
Violation issued (HPD, open)
A
04/02/2021
Violation issued (HPD, open)
A
10/05/2015
Violation issued (HPD, closed)
I
01/15/2013
Violation issued (HPD, closed)
C
11/14/2012
Violation issued (ECB, closed)
Construction
03/09/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/09/2010
Violation issued (ECB, closed)
Unknown
12/07/2010
Violation issued (ECB, closed)
Construction
09/20/2010
Violation issued (ECB, closed)
Unknown
03/23/2010
Violation issued (ECB, closed)
Construction
02/22/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/19/2010
Violation issued (ECB, closed)
Construction
11/17/2009
Violation issued (ECB, closed)
Construction
11/17/2009
Violation issued (ECB, closed)
Construction
11/17/2009
Violation issued (ECB, closed)
Construction
01/21/2009
Violation issued (HPD, open)
B
02/11/2008
Violation issued (HPD, open)
B
02/11/2008
Violation issued (HPD, open)
B
02/07/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/16/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/10/1998
Violation issued (HPD, open)
A
03/10/1998
Violation issued (HPD, open)
A
03/10/1998
Violation issued (HPD, open)
A
11/06/1997
Violation issued (ECB, closed)
Construction
08/29/1995
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/17/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offSAHARA CONTRACTING CORP04/07/2026
DOB NOWPlumbingSigned-offEH PLUMBING & HEATING COR10/27/2023
DOB NOWGeneral ConstructionSigned-offSAHARA CONTRACTING CORP07/06/2023
BISMHISSUEDNIKOLAI DESIGN SYSTEMS IN11/12/2015
BISEQISSUEDAMERICAN DREAM INFINITY C06/10/2013
BISOTISSUEDAMERICAN DREAM INFINITY C06/10/2013
BISOTISSUEDAMERICAN DREAM INFINITY C09/14/2012
BISEQISSUEDAMERICAN DREAM INFINITY C09/14/2012
BISOTISSUEDAMERICAN DREAM INFINITY C11/07/2011
BISOTISSUEDAMERICAN DREAM INFINITY C04/19/2011
BISPLISSUEDTECHNICS MECHANICAL CORP.11/09/1995
BIS—ISSUEDNORCOVE CONTRACTING CORP.02/17/1995
4 projects · most recent 06/26/2025
General Wiring
FiledStatusContractorScope
06/26/2025Permit IssuedTRIBORO ELEC'L CONTR'G COGeneral Wiring
04/01/2025Permit IssuedTRIPLE D ELECTRIC INCGeneral Wiring
05/24/2024Permit IssuedTRIBORO ELEC'L CONTR'G COGeneral Wiring
08/04/2022CompleteMARTIN DORKIN—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
03/19/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/16/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/10/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
03/10/2026FinalRAJENDRA PARIKHprogress
03/10/2026MasonryRAJENDRA PARIKHspecial
03/10/2026Structural Stability – Alterations of existing buildingsRAJENDRA PARIKHspecial
03/10/2026Tenant Protection Plan ComplianceRAJENDRA PARIKHspecial
09/18/2023Tenant Protection Plan ComplianceRAJENDRA PARIKHspecial
09/03/2023Fire-Resistant Penetrations and JointsRAJENDRA PARIKHspecial
09/03/2023Tenant Protection Plan Compliance—special
09/03/2023FinalRAJENDRA PARIKHprogress
09/03/2023Fire-Resistance Rated ConstructionRAJENDRA PARIKHprogress
▾Documents — 124 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/22/2026X00832190-I1Request digital key ↗
08/22/2026X00832190-S1Request digital key ↗
08/22/2026X00832190-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits26
▸BISPLAN / WORK APPROVAL APPLICATION19
04/16/2024220051244Open ↗
04/16/2024220051244Open ↗
04/16/2024220147115Open ↗
Showing 3 of 19 on file for this type
▸BISWORK PERMIT APPLICATION7
11/12/2015220412042Open ↗
06/10/2013220223014Open ↗
06/10/2013220223014Open ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISADDRESS - NEW HOUSE NUMBER APPROVED1
04/29/2013220051244Open ↗
▸Seals & Professional Certifications32
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
05/13/2016220412042Open ↗
11/04/2015220412042Open ↗
04/29/2013220051244Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
11/04/2015220412042Open ↗
08/30/2012220223014Open ↗
10/26/2011220147115Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/23/2026X00832190-S1Open ↗
08/23/2026X01370194-I1Open ↗
08/23/2026X01370194-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
08/30/2012220223014Open ↗
10/26/2011220147115Open ↗
11/10/2010220091807Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/22/2026X00832190-S1Open ↗
08/22/2026X00832190-P1Open ↗
08/22/2026X00832190-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/23/2026X01370194-I1Open ↗
08/22/2026X00832190-P1Open ↗
08/22/2026X00832190-P1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/04/2015220412042Open ↗
▸Safety & Tenant Protection3
▸BISSRO MD ANTI-HARASSMENT CHECKLIST2
08/30/2012220223014Open ↗
03/10/2010220051244Open ↗
▸BISANTI-HARASSMENT CHECKLIST1
11/04/2015220412042Open ↗
▸Environmental & Asbestos8
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
10/26/2011220147115Open ↗
09/03/2008210066523Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
11/04/2015220412042Open ↗
08/30/2012220223014Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
11/10/2010220091807Open ↗
03/09/2010220051244Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/22/2026X00832190-S1Open ↗
08/22/2026X00832190-I1Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
05/13/2016220412042Open ↗
11/04/2015220412042Open ↗
08/30/2012220223014Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
05/11/2024220223014Open ↗
05/11/2024220147115Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
05/11/2024220223014Open ↗
05/11/2024220147115Open ↗
▸BISTECHNICAL REPORT: ENERGY1
10/28/2011220147115Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
05/13/2016220412042Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
05/11/2024220223014Open ↗
05/11/2024220147115Open ↗
05/11/2024220051244Open ↗
▸Approvals, Objections & Sign-offs11
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
05/14/2024220223014Open ↗
05/13/2024220147115Open ↗
05/13/2024220051244Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
08/30/2012220223014Open ↗
10/26/2011220147115Open ↗
11/10/2010220091807Open ↗
Showing 3 of 5 on file for this type
▸BISBSA-CPC APPROVAL1
11/10/2010220091807Open ↗
▸Cost, Insurance & Ownership15
▸BISCOST AFFIDAVIT12
05/11/2024220147115Open ↗
05/11/2024220051244Open ↗
05/11/2024220051244Open ↗
Showing 3 of 12 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
05/11/2024220223014Open ↗
05/11/2024220147115Open ↗
05/11/2024220051244Open ↗
▸Filing & Intake Forms12
▸BISADDITIONAL INFORMATION6
05/10/2016220412042Open ↗
04/29/2013220051244Open ↗
12/13/2012220223014Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING COVER SHEET6
11/04/2015220412042Open ↗
08/30/2012220223014Open ↗
10/26/2011220147115Open ↗
Showing 3 of 6 on file for this type