← Back
BuildNYC
Elevator apt, semi-fireproof without stores
The Henry
2395 PALISADE AVENUE · BIN 2130523
💬 Discuss this project
2021Year Built
7Stories
D1Building Class
R6AZoning
38,399 sfGross Floor Area
55Units
LL97 CoveredRent Stabilized0 Active ViolationsFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: 2395 Palisade · 6,500 sf lot · 5.91 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofSupported scaffolding installation16p · 1 filing · 5 docs
BulkheadSupported scaffolding installation3p · 1 filing · 5 docs
Floor 6Supported scaffolding installation16p · 1 filing · 5 docs
Floor 5Supported scaffolding installation16p · 1 filing · 5 docs
Floor 4Supported scaffolding installation16p · 1 filing · 5 docs
Floor 3Supported scaffolding installation16p · 1 filing · 5 docs
Floor 2Supported scaffolding installation16p · 1 filing · 5 docs
Floor 12395 Palisade LLC19p · 2 filings · 7 docs
Site & exterior2395 Palisade LLC55p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
2395 Palisade3103/22/2026
Timber Equities203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/15/2017$2.6M—2395 PALISADE AVENUE CORP. → 2395 PALISADE LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Patuxent Engineering406/21/2021
Revap Consulting Engineers107/14/2020
Asif Jamil, RA309/09/2019
Kutnicki Bernstein Architects107/08/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Patuxent Engineering803/21/2026
Green Studio603/21/2026
William Vitacco Associates103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
1 ArborScaffold603/21/2026
1 ArborGeneral Contractor303/21/2026
Manhattan D EnterprisesScaffold307/08/2026
Platinum Services NYScaffold303/21/2026
Dynamic Electrical ContractorsElectrical103/21/2026
Building Lifecycle
11/24/2025
Elevator Category 1 inspection report filed
11/18/2025
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · closed
12/07/2023
Signed off — Alteration
PROPOSED CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X00367410-I1
12/07/2023
Signed off — Alteration
INSTALLATION OF CONSTRUCTION FENCE IN ACCORDANCE WITH NYCC 2014 CHAPTER 33. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
X00258929-I1
11/27/2023
Closed: Failure to file benchmarking report of energy use as per ad. Code sec. 28-309.4
DOB violation · closed on the city's record
58 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-off1 Arbor05/18/2022
DOB NOWConstruction FenceSigned-off1 Arbor02/22/2022
DOB NOWSidewalk ShedSigned-offManhattan D Enterprises02/11/2022
DOB NOWConstruction FenceSigned-off1 Arbor02/08/2022
DOB NOWConstruction FenceSigned-offPlatinum Services NY10/08/2021
DOB NOWSupported ScaffoldSigned-offManhattan D Enterprises05/03/2021
DOB NOWSidewalk ShedSigned-offManhattan D Enterprises02/17/2021
BIS—ISSUED1 Arbor06/17/2022
BIS—ISSUED1 Arbor06/17/2022
BIS—ISSUED1 Arbor02/20/2022
BIS—ISSUED1 Arbor02/04/2022
BISPLISSUEDNew York Standard Mechanical09/09/2021
BIS—ISSUED1 Arbor07/13/2021
BISSPISSUEDPrime Piping & Heating06/23/2021
BISPLISSUEDNew York Standard Mechanical09/09/2020
BIS—RE-ISSUED1 Arbor08/03/2020
BIS—ISSUED1 Arbor08/03/2020
BIS—ISSUED1 Arbor06/18/2020
BISOTISSUEDState Contracting Corp NY02/04/2020
6 projects · most recent 08/11/2022
General Wiring
FiledStatusContractorScope
08/11/2022CompleteDynamic Electrical ContractorsGeneral Wiring
08/01/2022CompleteDynamic Electrical ContractorsGeneral Wiring
05/04/2021CompletePinpoint ElectricGeneral Wiring
05/29/2019CompleteDynamic Electrical ContractorsGeneral Wiring
03/27/2019CancelledBrandl Electric—
08/23/2018CompleteTop Shelf Electric—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
05/27/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
06/23/2021FinalJOHN O'CONNOR, P.E.progress
02/16/2021FinalJOHN O'CONNOR, P.E.progress
343 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account