← Back
Two family brick
24-01 37 AVENUE
QUEENS · BIN 4004185
💬 Discuss this project
1940Year Built
2Stories
B1Building Class
R5Zoning
1,678 sfGross Floor Area
2Units
0 Open Violations
Two family brick · Owner of record: 2401 37 AVENUE LLC · 1,779 sf lot · 0.94 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 21p · 1 filing · 13 docs
Floor 1
Basement2p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/15/2024$1.4M—Private party → 2401 37 AVENUE LLC$822/sf building
10/02/2018$1.1M—Private party → Private party$656/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BANGASH ASSOCIATES INC.704/11/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Mega General703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MEGA GENERAL CONSTRUCTIONGeneral Contractor603/21/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BANGASH ASSOCIATES INC8488704/11/2025
Building Lifecycle
All (52)Filed (7)Permit Issued (3)Signed Off (3)Violation (4)Inspection (7)Special Inspection (28)
04/23/2025
Signed off — Alteration
PROPOSED MECHANICAL WORK AT OPEN SPACE, BASEMENT, 1st TO 2nd FLOOR. IN CONJUNCTION WITH DOB NOW JOB#Q01094851. AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01094983-I1
04/23/2025
Signed off — Alteration
PROPOSED PLUMBING WORK AT OPEN SPACE, BASEMENT, 1st TO 2nd FLOOR. IN CONJUNCTION WITH DOB NOW JOB#Q01094851. AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01094920-I1
04/23/2025
Signed off — Alteration
PROPOSED RENOVATION FOR TWO-FAMILY HOUSE. WORK AT OPEN SPACE, FACADE, BASEMENT WITH GARAGE, 1st FLOOR TO 2nd FLOOR. INCLUDING FLOORING, CEILING, PARTITION WORK. AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01094851-I1
04/18/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/11/2025
Filed — Alteration
PROPOSED RENOVATION FOR TWO-FAMILY HOUSE. WORK AT OPEN SPACE, FACADE, BASEMENT WITH GARAGE, 1st FLOOR TO 2nd FLOOR. INCLUDING FLOORING, CEILING, PARTITION WORK. AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01094851-P2
04/07/2025
Special inspection requirement — Fenestration air leakage
FAZAL BANGASH
04/07/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FAZAL BANGASH
04/07/2025
Special inspection requirement — Energy Code Compliance Inspections
FAZAL BANGASH
04/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAZAL BANGASH
04/07/2025
Special inspection requirement — Concrete - Cast-In-Place
FAZAL BANGASH
04/07/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAZAL BANGASH
04/07/2025
Special inspection requirement — Interior lighting power
FAZAL BANGASH
04/07/2025
Special inspection requirement — Fenestration areas
FAZAL BANGASH
03/25/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/14/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
02/26/2025
Special inspection requirement — Maintenance information
FAZAL BANGASH
02/26/2025
Special inspection requirement — Mechanical Systems
FAZAL BANGASH
02/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAZAL BANGASH
02/26/2025
Special inspection requirement — Final
FAZAL BANGASH
02/26/2025
Special inspection requirement — Maintenance information
FAZAL BANGASH
02/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAZAL BANGASH
02/26/2025
Special inspection requirement — Energy Code Compliance Inspections
FAZAL BANGASH
02/26/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAZAL BANGASH
02/26/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAZAL BANGASH
02/26/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAZAL BANGASH
02/25/2025
Filed — Alteration
PROPOSED MECHANICAL WORK AT OPEN SPACE, BASEMENT, 1st TO 2nd FLOOR. IN CONJUNCTION WITH DOB NOW JOB#Q01094851. AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01094983-P1
02/25/2025
Filed — Alteration
PROPOSED PLUMBING WORK AT OPEN SPACE, BASEMENT, 1st TO 2nd FLOOR. IN CONJUNCTION WITH DOB NOW JOB#Q01094851. AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01094920-P1
02/25/2025
Filed — Alteration
PROPOSED RENOVATION FOR TWO-FAMILY HOUSE. WORK AT OPEN SPACE, FACADE, BASEMENT WITH GARAGE, 1st FLOOR TO 2nd FLOOR. INCLUDING FLOORING, CEILING, PARTITION WORK. AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01094851-P1
02/14/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAZAL BANGASH
02/14/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAZAL BANGASH
02/14/2025
Special inspection requirement — Maintenance information
FAZAL BANGASH
02/14/2025
Special inspection requirement — Energy Code Compliance Inspections
FAZAL BANGASH
02/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAZAL BANGASH
02/14/2025
Special inspection requirement — Maintenance information
FAZAL BANGASH
02/14/2025
Special inspection requirement — Final
FAZAL BANGASH
02/14/2025
Special inspection requirement — Mechanical Systems
FAZAL BANGASH
02/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAZAL BANGASH
02/14/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAZAL BANGASH
11/13/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/13/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
11/13/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/13/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/22/2024
Permit issued — General Construction
Q01094851-I1-GC
08/21/2024
Permit issued — Plumbing
Q01094920-I1-PL
08/21/2024
Permit issued — Mechanical Systems
Q01094983-I1-MS
08/19/2024
Filed — Alteration
PROPOSED MECHANICAL WORK AT OPEN SPACE, BASEMENT, 1st TO 2nd FLOOR. IN CONJUNCTION WITH DOB NOW JOB#Q01094851. AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01094983-I1
08/19/2024
Filed — Alteration
PROPOSED PLUMBING WORK AT OPEN SPACE, BASEMENT, 1st TO 2nd FLOOR. IN CONJUNCTION WITH DOB NOW JOB#Q01094851. AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01094920-I1
08/19/2024
Filed — Alteration
PROPOSED RENOVATION FOR TWO-FAMILY HOUSE. WORK AT OPEN SPACE, FACADE, BASEMENT WITH GARAGE, 1st FLOOR TO 2nd FLOOR. INCLUDING FLOORING, CEILING, PARTITION WORK. AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01094851-I1
03/03/2020
Violation issued (ECB, closed)
Construction
03/03/2020
Violation issued (ECB, closed)
Construction
03/03/2020
Violation issued (ECB, closed)
Construction
03/03/2020
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offMEGA GENERAL CONSTRUCTION08/22/2024
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.08/21/2024
DOB NOWMechanical SystemsSigned-offMEGA GENERAL CONSTRUCTION08/21/2024
1 project · most recent 06/20/2025
General Wiring
FiledStatusContractorScope
06/20/2025CompleteKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
04/18/2025Pass-Final General Construction Non-Directive 14PassView ↗
03/25/2025Fail-Final General Construction Non-Directive 14FailView ↗
03/14/2025Fail-Final General Construction Non-Directive 14FailView ↗
11/13/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/13/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/13/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/13/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
04/07/2025Fenestration air leakageFAZAL BANGASHenergy_progress
04/07/2025Fenestration and door U-factor and product ratingsFAZAL BANGASHenergy_progress
04/07/2025Energy Code Compliance InspectionsFAZAL BANGASHprogress
04/07/2025Fire-Resistant Penetrations and JointsFAZAL BANGASHspecial
04/07/2025Concrete - Cast-In-PlaceFAZAL BANGASHspecial
04/07/2025Fire-Resistance Rated ConstructionFAZAL BANGASHprogress
04/07/2025Interior lighting powerFAZAL BANGASHenergy_progress
04/07/2025Fenestration areasFAZAL BANGASHenergy_progress
02/26/2025Maintenance informationFAZAL BANGASHenergy_progress
02/26/2025Mechanical SystemsFAZAL BANGASHspecial
02/26/2025Fire-Resistant Penetrations and JointsFAZAL BANGASHspecial
02/26/2025FinalFAZAL BANGASHprogress
02/26/2025Maintenance informationFAZAL BANGASHenergy_progress
02/26/2025Fire-Resistant Penetrations and JointsFAZAL BANGASHspecial
02/26/2025Energy Code Compliance InspectionsFAZAL BANGASHprogress
02/26/2025HVAC-R and service water heating equipmentFAZAL BANGASHenergy_progress
02/26/2025HVAC-R and service water heating system controlsFAZAL BANGASHenergy_progress
02/26/2025HVAC-R and service water piping design and insulationFAZAL BANGASHenergy_progress
02/14/2025HVAC-R and service water piping design and insulationFAZAL BANGASHenergy_progress
02/14/2025HVAC-R and service water heating system controlsFAZAL BANGASHenergy_progress
02/14/2025Maintenance informationFAZAL BANGASHenergy_progress
02/14/2025Energy Code Compliance InspectionsFAZAL BANGASHprogress
02/14/2025Fire-Resistant Penetrations and JointsFAZAL BANGASHspecial
02/14/2025Maintenance informationFAZAL BANGASHenergy_progress
02/14/2025FinalFAZAL BANGASHprogress
Latest 25 of 28.
▾Documents — 37 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/21/2026Q01094920-P1Request digital key ↗
08/21/2026Q01094920-I1Request digital key ↗
08/21/2026Q01094983-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications23
▸DOB NOWProgress Inspector Seal & Signature11
09/12/2026Q01094920-I1Open ↗
09/12/2026Q01094920-I1Open ↗
09/01/2026Q01094983-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/21/2026Q01094920-I1Open ↗
08/21/2026Q01094920-P1Open ↗
08/21/2026Q01094983-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/12/2026Q01094920-I1Open ↗
09/01/2026Q01094983-P1Open ↗
08/25/2026Q01094983-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/21/2026Q01094920-P1Open ↗
08/21/2026Q01094920-I1Open ↗
08/21/2026Q01094983-I1Open ↗
Showing 3 of 7 on file for this type