← Back
Condo, office space
24-02 49 AVENUE
QUEENS · Long Island City-Hunters Point · BIN 4000542
💬 Discuss this project
1928Year Built
7Stories
RBBuilding Class
M1-4Zoning
654,962 sfGross Floor Area
5Units
LL97 Covered3 Open Violations ▸FISP: SWARMP
Condo, office space · 119,700 sf lot · 5.47 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionLandscapeGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction208p · 11 filings · 20 docs
Floor 7Under Construction1 filing · 6 docs
Floor 6Under Construction213p · 13 filings · 20 docs
Floor 5Under Construction216p · 11 filings · 20 docs
Floor 4Under Construction46p · 7 filings · 20 docs
Floor 3Under Construction33p · 3 filings · 17 docs
Floor 2Under Construction33p · 3 filings · 13 docs
Floor 1Under Construction60p · 9 filings · 20 docs
MezzanineUnder Construction1 filing · 3 docs
CellarUnder Construction170p · 6 filings · 20 docs
Basement14p · 5 filings · 20 docs
Sub-BasementUnder Construction170p · 7 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
24-02 49TH AVE CONDOMINIUM5009/24/2026
BRUCKNER BOULEVARD OWNER LLC6809/18/2026
WESTBROOK PROPERTIES2007/08/2026
UNIVERSAL SYSTEMS407/08/2026
UNITY CONSTRUCTION GROUP803/22/2026
BRIDGEDALE OWNER LLC103/22/2026
BRIDGEDALE4603/22/2026
BRIGEDALE LLC103/22/2026
OWNER OF PREMISES 21-66 4103/22/2026
ARCHSTONE BUILDERS203/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SYNERGY BUILDING CONSULTANTS703/21/2026
RIZZO GROUP1103/21/2026
A1 EXPEDITING SERVICE CORP.403/21/2026
HS DESIGN STUDIO203/21/2026
AE DESIGN SOLUTION403/21/2026
EUROCELT EXPEDITING, INC203/21/2026
BUILDING BROTHERS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ARSENAL SCAFFOLD INCGeneral Contractor2207/08/2026
STARR INDUSTRIES LLCGeneral Contractor509/18/2026
CAPITOL FIRE SPRINKLER COFire Protection407/08/2026
SLSCO,LTDGeneral Contractor404/09/2026
HUNTER ROBERTS CONSTRUCTIONGeneral Contractor409/24/2026
J.M. BOTTO INCPlumbing307/14/2026
TURI MANAGEMENT CORPGeneral Contractor207/08/2026
METROCITY GROUP,INCPlumbing207/08/2026
PATRIOT ELECTRIC CORPElectrical203/22/2026
PREMIER FIRE SPRNKLR COFire Protection209/22/2026
A & M WARSHAW PLBG & HTGPlumbing107/08/2026
TRISTATE PLBG SVCS CORPPlumbing106/02/2026
ADCO ELEC'L CORPElectrical103/22/2026
ACTIVE SIGNSScaffold107/08/2026
KILIFARSKI, AElectrical103/21/2026
MORRIS HELLERElectrical103/21/2026
ARCHER CONSULTANTS GROUPFire Protection107/08/2026
SIRINA FIRE PROT CORPFire Protection107/08/2026
STANDARD FIRE PROTECT LLCFire Protection107/08/2026
ARCHSTONE BUILDERS LLCGeneral Contractor107/08/2026
EAGLE SCAFFOLDING SVCS INCGeneral Contractor107/03/2026
EVEREST SCAFFOLDING INCGeneral Contractor107/08/2026
UNIVERSAL SYSTEMS INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PROJECT TACTICAL SOLUTION58591004/08/2026
SOCOTEC ENGINEERING49831203/03/2026
BANGASH ASSOCIATES INC8488102/20/2026
MW PROFESSIONAL ENGINEERI570501/26/2021
Building Lifecycle
All (262)Filed (51)Permit Issued (54)Signed Off (11)Facade (FISP) (9)Violation (60)Inspection (10)Objection (37)Special Inspection (30)
09/23/2026
Permit issued — General Construction
Q01393980-I1-GC
09/21/2026
Permit issued — Plumbing
Q01339436-I1-EW-SP
09/17/2026
Permit issued — Sidewalk Shed
Q01369491-I1-SH
08/31/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/03/2026
Permit issued — General Construction
Q01354254-I1-GC
07/24/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT
Q01361546-P1
07/15/2026
Violation issued (ECB, open)
Construction
07/15/2026
Violation issued (ECB, open)
Construction
07/13/2026
Permit issued — Plumbing
Q01339380-I1-PL
07/01/2026
Filed — Alteration
Q01393316-P1
06/29/2026
Filed — Alteration
TEMPORARY FIELD CONSTRUCTION TRAILER , NO CHANGE IN USE, OCCUPANCY OR EGRESS
Q01393980-I1
06/22/2026
Permit issued — Sidewalk Shed
Q01369491-I1-SH
06/16/2026
Permit issued — General Construction
Q01339362-I1-GC
06/08/2026
Permit issued — Plumbing
Q01259419-I1-PL
06/01/2026
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
05/29/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
05/27/2026
Permit issued — Sprinklers
Q01339380-I1-PL
05/12/2026
Permit issued — Plumbing
Q01339436-I1-EW-SP
05/07/2026
Permit issued — Plumbing
Q01339436-I1-PL
05/05/2026
Filed — Alteration
Q01393316-I1
05/05/2026
Permit issued — Supported Scaffold
Q01393316-I1-SF
05/04/2026
Filed — Alteration
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q01369491-P1
05/02/2026
Special inspection requirement — Post-installed Anchors
Max Lee
05/02/2026
Special inspection requirement — Sprinkler Systems
Max Lee
04/28/2026
Special inspection requirement — Final
DANNY TRUJILLO
04/23/2026
Special inspection requirement — Lowest Floor Elevation
04/20/2026
Filed — Alteration
Site/Civil: Install new building water service within 50th Avenue ROW, including trenching and DOT/DOBcompliant sidewalk, curb, and roadway restoration. No curb cuts, drainage structures, or street tree work proposed.
Q01353045-I1
04/20/2026
Permit issued — General Construction
Q01339427-I1-GC
04/20/2026
Permit issued — Sprinklers
Q01339380-I1-PL
04/14/2026
Filed — Alteration
Installation of temporary adjacent roof protections per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q01385298-I1
04/14/2026
Permit issued — Protection and Mechanical Methods
Q01385298-I1-PMM
04/14/2026
Objection raised — Mechanical
04/14/2026
Objection raised — Plumbing
04/14/2026
Objection raised — Inspections
04/14/2026
Objection raised — Mechanical
04/14/2026
Objection raised — Plumbing
04/14/2026
Objection resolved — Resolved
04/14/2026
Objection resolved — Resolved
04/14/2026
Objection resolved — Resolved
04/14/2026
Objection resolved — Resolved
04/08/2026
Filed — Alteration
Sprinkler modification on 1st floor as per plans filed herewith. No change in egress, use, or occupancy.
Q01259421-P1
04/03/2026
Permit issued — Sprinklers
Q01339380-I1-EW-SP
04/02/2026
Objection resolved — Resolved
04/02/2026
Objection resolved — Resolved
04/02/2026
Objection resolved — Resolved
04/02/2026
Objection resolved — Resolved
04/02/2026
Objection resolved — Resolved
04/02/2026
Objection resolved — Resolved
04/02/2026
Objection resolved — Resolved
04/02/2026
Objection resolved — Resolved
04/01/2026
Objection resolved — Addressed
04/01/2026
Objection resolved — Addressed
03/31/2026
Permit issued — Mechanical Systems
Q01259416-I1-MS
03/31/2026
Permit issued — Structural
Q01259411-I1-GC-CX
03/26/2026
Special inspection requirement — Sprinkler Systems
Max Lee
03/26/2026
Special inspection requirement — Post-installed Anchors
Max Lee
03/24/2026
Permit issued — Sidewalk Shed
Q01369491-I1-SH
03/23/2026
Filed — Alteration
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q01369491-I1
03/23/2026
Objection raised — Fire_Protection
03/23/2026
Objection raised — Scope
Latest 60 of 262 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedHUNTER ROBERTS CONSTRUCTION09/23/2026
DOB NOWPlumbingPermit IssuedPREMIER FIRE SPRNKLR CO09/21/2026
DOB NOWSidewalk ShedPermit IssuedSTARR INDUSTRIES LLC09/17/2026
DOB NOWGeneral ConstructionPermit IssuedHUNTER ROBERTS CONSTRUCTION08/03/2026
DOB NOWPlumbingPermit IssuedJ.M. BOTTO INC07/13/2026
DOB NOWSidewalk ShedPermit IssuedSTARR INDUSTRIES LLC06/22/2026
DOB NOWGeneral ConstructionPermit IssuedHUNTER ROBERTS CONSTRUCTION06/16/2026
DOB NOWPlumbingPermit IssuedMETROCITY GROUP,INC06/08/2026
DOB NOWSprinklersPermit IssuedJ.M. BOTTO INC05/27/2026
DOB NOWPlumbingPermit IssuedPREMIER FIRE SPRNKLR CO05/12/2026
DOB NOWPlumbingPermit IssuedTRISTATE PLBG SVCS CORP05/07/2026
DOB NOWSupported ScaffoldPermit IssuedEAGLE SCAFFOLDING SVCS INC05/05/2026
DOB NOWGeneral ConstructionPermit IssuedHUNTER ROBERTS CONSTRUCTION04/20/2026
DOB NOWSprinklersPermit IssuedJ.M. BOTTO INC04/20/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedSTARR INDUSTRIES LLC04/14/2026
DOB NOWSprinklersPermit IssuedSIRINA FIRE PROT CORP04/03/2026
DOB NOWMechanical SystemsPermit IssuedSLSCO,LTD03/31/2026
DOB NOWStructuralPermit IssuedSLSCO,LTD03/31/2026
DOB NOWSidewalk ShedPermit IssuedSTARR INDUSTRIES LLC03/24/2026
DOB NOWSuspended ScaffoldPermit IssuedELM SUSPENSION SYSTEMS03/20/2026
DOB NOWSprinklersPermit IssuedARCHER CONSULTANTS GROUP03/11/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedSTARR INDUSTRIES LLC02/23/2026
DOB NOWStructuralPermit IssuedSLSCO,LTD01/29/2026
DOB NOWMechanical SystemsPermit IssuedSLSCO,LTD01/22/2026
DOB NOWPlumbingPermit IssuedMETROCITY GROUP,INC01/20/2026
DOB NOWMechanical SystemsSigned-offARCHSTONE BUILDERS LLC05/21/2024
DOB NOWSignSigned-offACTIVE SIGNS INC01/13/2023
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC09/07/2021
DOB NOWStandpipeSigned-offSTANDARD FIRE SUPP CORP08/30/2021
DOB NOWStructuralSigned-offTURI MANAGEMENT CORP07/19/2021
DOB NOWSprinklersSigned-offCAPITOL FIRE SPRINKLER CO06/30/2021
DOB NOWStandpipeSigned-offCAPITOL FIRE SPRINKLER CO06/29/2021
DOB NOWMechanical SystemsPermit IssuedTURI MANAGEMENT CORP05/27/2021
DOB NOWSupported ScaffoldPermit IssuedUNIVERSAL SYSTEMS INC05/07/2021
DOB NOWConstruction FenceSigned-offARSENAL SCAFFOLD INC03/22/2021
DOB NOWSupported ScaffoldSigned-offARSENAL SCAFFOLD INC03/22/2021
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC03/22/2021
DOB NOWConstruction FenceSigned-offARSENAL SCAFFOLD INC12/31/2020
DOB NOWStandpipeSigned-offCAPITOL FIRE SPRINKLER CO06/29/2020
DOB NOWStandpipeSigned-offCAPITOL FIRE SPRINKLER CO06/29/2020
+ 60 more permits on file
3 projects · most recent 03/03/2026
Heating and Air Conditioning Systems Air Conditioning Systems Heating Systems Refrigeration Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/03/2026——Heating and Air Conditioning Systems
Heat / Cool
Liebert MT048E 49,100 BTU · Crac Unit ×8
MMD18E 18,200 BTU ×2
MMD96E 89,100 BTU · Crac Unit ×2
Mitsubishi Electric PFD054AL 4 tons · Vrf Indoor ×8
PFH020AL 2 tons · Vrf Indoor ×2
PFH096A 7 tons · Vrf Indoor ×2
03/03/2026——Air Conditioning Systems, Heating and Air Conditioning Systems, Heating Systems, Refrigeration Systems
Cooling
Haakon Custom DOAS Series (shop drawings) 7,600,000 BTU · Doas ×2
Custom High‑Plume Exhaust System 3,822 BTU · Ahu ×1
Liebert Liebert MT60K 88,300 BTU · Crac Unit ×2
Mitsubishi Electric PUZ‑A36NKA7 36,000 BTU · Fan Coil Indoor ×2
Trane HDWA Series 1,013 tons · Chiller ×2
Heat / Cool
Haakon Custom high‑plume exhaust AHU coil 2,996 BTU ×1
Heating
Haakon Custom coil section inside AHU‑1 3,822 BTU ×1
Custom coil section inside AHU‑2 3,822 BTU ×1
Ventilation
Haakon Custom DOAS Series (Shop Fabricated) 42,500 CFM · Ahu ×2
Custom High‑Plume Series 85,000 CFM · Ahu ×1
Oxygen8 H15_IN_BP 1,050 CFM · Erv ×2
Refrigeration
Mitsubishi Electric PUZ‑A36NKA7 36,000 BTU · Vrf Outdoor ×2
08/28/2025Permit IssuedSLSCO,LTDAir Conditioning Systems, Heating Systems
Cooling
Mammoth V-CUBE VVA-342-GXST 35 tons · Wshp ×1
Heating
Trane TRANE VCEF 10 5 kW ×5
TRANE VCEF 08 2 kW ×4
TRANE VCEF 12 4 kW ×2
TRANE VCEF 8 3 kW ×1
Qmark CWH1207DSF 2 kW ×1
3 projects · most recent 04/08/2026
FiledStatusContractorScope
04/08/2026Permit IssuedARCHER CONSULTANTS GROUP88 heads
03/03/2026Permit IssuedSIRINA FIRE PROT CORP221 heads
01/26/2021Signed-offCAPITOL FIRE SPRINKLER CO181 heads, 6 outlets
2 projects · most recent 03/03/2026
Water/Sanitary Gas Storm
FiledStatusContractorScope
03/03/2026Permit IssuedJ.M. BOTTO INCGas, Storm, Water/Sanitary
10/30/2020Signed-offA & M WARSHAW PLBG & HTGWater/Sanitary
25 projects · most recent 06/12/2026
General Wiring Lighting
FiledStatusContractorScope
06/12/2026Permit IssuedNEAD ELECTRIC INC.General Wiring
06/12/2026Permit IssuedNEAD ELECTRIC INC.General Wiring
05/06/2026Permit IssuedADCO ELEC'L CORPGeneral Wiring
05/06/2026Permit IssuedADCO ELEC'L CORPGeneral Wiring
03/30/2026Permit IssuedADCO ELEC'L CORP—
03/20/2026Permit IssuedJ.A. LEE ELEC SVCS LLCGeneral Wiring
03/18/2026Permit IssuedADCO ELEC'L CORP—
03/13/2026Permit IssuedNEAD ELECTRIC INC.—
02/18/2026Permit IssuedJ.A. LEE ELEC SVCS LLC—
09/12/2025Permit IssuedADCO ELEC'L CORPGeneral Wiring
03/06/2024CompleteJ.A. LEE ELEC SVCS LLC—
04/10/2023CompletePATRIOT ELECTRIC CORPGeneral Wiring
09/01/2022CompletePATRIOT ELECTRIC CORPGeneral Wiring
01/31/2022CompleteFREEDOM ELECTL & DATA INCGeneral Wiring
09/14/2021CompleteNASH ELECTRIC SERVICES IN—
4 projects · most recent 06/29/2026
Concrete Steel Masonry
FiledStatusContractorScope
06/29/2026Permit IssuedHUNTER ROBERTS CONSTRUCTI1 scope_items
03/02/2026——Steel, Concrete, Masonry
03/02/2026——Steel, Concrete
08/28/2025Permit IssuedSLSCO,LTDConcrete
2 projects · most recent 05/04/2026
Sidewalk Shed Scaffold
FiledStatusContractorScope
05/04/2026Permit IssuedSTARR INDUSTRIES LLCSidewalk Shed
05/06/2021Permit IssuedUNIVERSAL SYSTEMS INCScaffold
1 project · most recent 07/24/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
07/24/2026Permit IssuedELM SUSPENSION SYSTEMSSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
08/31/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/01/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
05/29/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/08/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
11/20/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
11/14/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
08/23/2022Pass-Final SD - Up to 3 Requested FloorsPassView ↗
04/22/2022Pass-Final SD - Up to 3 Requested FloorsPassView ↗
03/07/2022Fail-Final SD - Up to 3 Requested FloorsFailView ↗
12/22/2021Pass-Final SD - Fire PumpPassView ↗
▾Special Inspection Requirements (DOB NOW) — 115
DateRequirementInspectorRole
05/02/2026Post-installed AnchorsMax Leespecial
05/02/2026Sprinkler SystemsMax Leespecial
04/28/2026FinalDANNY TRUJILLOprogress
04/23/2026Lowest Floor Elevation—progress
03/26/2026Post-installed AnchorsMax Leespecial
03/26/2026Sprinkler SystemsMax Leespecial
03/11/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)MARISA HARTEspecial
03/11/2026Lowest Floor ElevationMARISA HARTEprogress
03/11/2026FinalMARISA HARTEprogress
03/10/2026Final—progress
03/10/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)—special
03/10/2026Lowest Floor Elevation—progress
02/18/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)MARISA HARTEspecial
02/18/2026Heating SystemsMARISA HARTEspecial
02/06/2026Non Potable Water SystemsMARISA HARTEspecial
01/30/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)MARISA HARTEspecial
01/30/2026Lowest Floor ElevationMARISA HARTEprogress
01/29/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)MARISA HARTEspecial
01/29/2026FinalMARISA HARTEprogress
01/21/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)MARISA HARTEspecial
01/21/2026Lowest Floor ElevationMARISA HARTEprogress
01/21/2026Energy Code Compliance InspectionsMARISA HARTEprogress
12/23/2025Post-installed AnchorsMARISA HARTEspecial
12/23/2025Post-installed AnchorsMARISA HARTEspecial
12/23/2025Fire-Resistant Penetrations and JointsMARISA HARTEspecial
Latest 25 of 115.
▾Documents — 973 on file (BIS + DOB NOW)
▸Plans & Drawings51
▸DOB NOWPlans/Sketch36
08/29/2026Q00037797-I1Request digital key ↗
08/28/2026Q00056647-I1Request digital key ↗
08/28/2026Q00056655-I1Request digital key ↗
Showing 3 of 36 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler3
08/28/2026Q00334571-I1Request digital key ↗
08/15/2026Q00334571-P2Request digital key ↗
08/15/2026Q00334571-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Standpipe3
08/28/2026Q00334571-I1Request digital key ↗
08/15/2026Q00334571-P2Request digital key ↗
08/15/2026Q00334571-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
08/28/2026Q00334537-I1Request digital key ↗
08/15/2026Q00334537-P3Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold2
08/28/2026Q00177723-I1Request digital key ↗
08/28/2026Q00359855-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
08/28/2026Q00056647-I1Request digital key ↗
08/15/2026Q00056647-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/28/2026Q00112169-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
08/28/2026Q00336725-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/28/2026Q00331727-I1Request digital key ↗
▸Applications & Permits178
▸BISPLAN / WORK APPROVAL APPLICATION138
01/30/2026421518566Open ↗
06/18/2025421518566Open ↗
06/17/2025421574889Open ↗
Showing 3 of 138 on file for this type
▸BISWORK PERMIT APPLICATION39
06/11/2021421574772Open ↗
06/11/2021421574772Open ↗
08/24/2020421518566Open ↗
Showing 3 of 39 on file for this type
▸BISAFTER-HOUR WORK PERMIT APPLICATION1
06/01/2022440543672Open ↗
▸Zoning, Tax Lot & Property Records6
▸BISFLOOD ZONE DESIGN CERTIFICATION4
06/22/2020440590264Open ↗
06/03/2020440593733Open ↗
Showing 2 of 4 on file for this type
▸BISFLOOD ZONE COMPLIANCE2
11/13/2024421725306Open ↗
11/13/2024421519351Open ↗
▸Seals & Professional Certifications223
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION72
06/14/2019421896504Open ↗
06/13/2019421897451Open ↗
06/07/2019421897451Open ↗
Showing 3 of 72 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature50
08/28/2026Q00056647-I1Open ↗
08/28/2026Q00056647-P1Open ↗
08/28/2026Q00056655-I1Open ↗
Showing 3 of 50 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature30
09/28/2026Q01339380-I1Open ↗
09/23/2026Q01333135-I1Open ↗
09/23/2026Q01333135-I1Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWProgress Inspector Seal & Signature26
09/23/2026Q01333135-I1Open ↗
09/01/2026Q00112169-I1Open ↗
08/29/2026Q01259411-I1Open ↗
Showing 3 of 26 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT15
06/22/2020440590264Open ↗
06/03/2020440593733Open ↗
06/07/2019421897451Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST12
06/07/2019421897451Open ↗
Showing 1 of 12 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION6
06/22/2020440590264Open ↗
06/03/2020440593733Open ↗
Showing 2 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY6
06/22/2020440590264Open ↗
06/03/2020440593733Open ↗
Showing 2 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment94
▸BISEQUIPMENT USE PERMITS47
02/05/2025421574889Open ↗
Showing 1 of 47 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE21
01/02/2020421574772Open ↗
06/07/2019421897451Open ↗
Showing 2 of 21 on file for this type
▸BISSCHEDULE B - PLUMBING11
01/08/2021440543672Open ↗
11/16/2020440543672Open ↗
10/26/2020440543672Open ↗
Showing 3 of 11 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA4
05/04/2022421725306Open ↗
01/25/2021421694688Open ↗
12/17/2019421519351Open ↗
Showing 3 of 4 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION4
01/19/2021440543672Open ↗
01/19/2021440543672Open ↗
Showing 2 of 4 on file for this type
▸BISBOILERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection10
▸BISSTREET TREE CHECKLIST8
07/18/2020421518566Open ↗
07/07/2020421570473Open ↗
Showing 2 of 8 on file for this type
▸BISTenant Protection Plan and Notes1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWTenant Protection Plan1
08/13/2026Q00056647-P1Open ↗
▸Environmental & Asbestos55
▸DOB NOWDEP ACP-5: Asbestos Assessment Report29
08/28/2026Q00056655-I1Open ↗
08/28/2026Q00334537-I1Open ↗
08/28/2026Q00334537-P3Open ↗
Showing 3 of 29 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)20
06/22/2020440590264Open ↗
06/03/2020440593733Open ↗
07/16/2019421518566Open ↗
Showing 3 of 20 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance32
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS21
05/30/2019421518566Open ↗
Showing 1 of 21 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
06/22/2020440590264Open ↗
06/03/2020440593733Open ↗
Showing 2 of 3 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
01/16/2025421574889Open ↗
10/16/2023440544485Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
06/22/2020440590264Open ↗
06/03/2020440593733Open ↗
▸BISNYCECC ANALYSIS2
06/22/2020440590264Open ↗
06/03/2020440593733Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
02/05/2025421574889Open ↗
▸BISELECTRIC MOTORS1
02/04/2025421574889Open ↗
▸Inspections & Test Reports45
▸BISTECHNICAL REPORT: RESPONSIBILITY23
06/18/2025421574889Open ↗
06/18/2025421574889Open ↗
07/19/2023421574889Open ↗
Showing 3 of 23 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS5
06/14/2019440543672Open ↗
Showing 1 of 5 on file for this type
▸BISHYDRO FLOW TEST LETTER3
08/09/2019440543672Open ↗
Showing 1 of 3 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
02/04/2025421574889Open ↗
07/19/2023440544485Open ↗
▸Approvals, Objections & Sign-offs71
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST27
11/19/2024421519351Open ↗
11/19/2024421694688Open ↗
11/14/2024421725306Open ↗
Showing 3 of 27 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION17
08/30/2019421518566Open ↗
Showing 1 of 17 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE12
01/30/2026421518566Open ↗
05/31/2024421518566Open ↗
Showing 2 of 12 on file for this type
▸BISADMINISTRATIVE OBJECTIONS10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISSUPERSEDING LETTER2
08/24/2020421518566Open ↗
08/09/2019421518566Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/17/2026Q01393316-I1Open ↗
08/17/2026Q01393316-P1Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership54
▸BISCOST AFFIDAVIT48
01/19/2021440543672Open ↗
06/22/2020440590264Open ↗
06/03/2020440593733Open ↗
Showing 3 of 48 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW36
01/16/2025421574889Open ↗
11/13/2024421725306Open ↗
05/29/2024421082820Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms108
▸BISADDITIONAL INFORMATION45
03/03/2021440543672Open ↗
03/01/2021440593733Open ↗
02/03/2021440543672Open ↗
Showing 3 of 45 on file for this type
▸BISEFILING COVER SHEET31
06/07/2019421897451Open ↗
Showing 1 of 31 on file for this type
▸BISBOROUGH INTAKE FORM23
06/11/2021421574772Open ↗
06/11/2021421574772Open ↗
04/20/2020421518566Open ↗
Showing 3 of 23 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET9
06/22/2020440590264Open ↗
06/03/2020440593733Open ↗
Showing 2 of 9 on file for this type
▸Other Documents27
▸BISFEMA ELEVATION CERT (086-0-33)/ FLOODPROOFING CERT (086-0-34)7
11/19/2024421519351Open ↗
11/19/2024421694688Open ↗
06/07/2019440544485Open ↗
Showing 3 of 7 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
03/03/2021440543672Open ↗
12/16/2020440543672Open ↗
12/16/2020440543672Open ↗
Showing 3 of 5 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFEMA FORM (81-31): ELEVATION CERTIFICATE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSUBSTANTIAL IMPROVEMENT CALCULATIONS2
06/22/2020440590264Open ↗
06/03/2020440593733Open ↗
▸BISPLOT DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWManufacturer's Specifications2
08/17/2026Q01361546-P1Open ↗
08/17/2026Q01361546-I1Open ↗
▸DOB NOWCalculations2
08/17/2026Q01361546-P1Open ↗
08/17/2026Q01361546-I1Open ↗
▸BISMAINTENANCE INFORMATION1
02/05/2025421574889Open ↗