← Back
BuildNYC
Condo, office space
The Bridge
24-02 49TH AVENUE · BIN 4000542
💬 Discuss this project
1928Year Built
7Stories
RBBuilding Class
M1-4Zoning
654,962 sfGross Floor Area
5Units
LL97 Covered1 Active Violation 0 unresolved · 1 paperwork only ▸FISP: SWARMP
Condo, office space · 119,700 sf lot · 5.47 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofNan Fung Life SciencesUnder Construction196p · 13 filings · 20 docs
BulkheadNan Fung Life SciencesUnder Construction2p · 1 filing · 3 docs
Floor 7Under Construction5p · 1 filing · 6 docs
Floor 6Nan Fung Life SciencesUnder Construction217p · 13 filings · 20 docs
Floor 5Nan Fung Life SciencesUnder Construction218p · 12 filings · 20 docs
Floor 4INF | LIFE SCIENCES | REAL ESTATE | A Member of NAN FUNG GROUnder Construction42p · 9 filings · 20 docs
Floor 3Nan Fung Life Sciences Real EstateUnder Construction27p · 6 filings · 20 docs
Floor 2Nan Fung Life Sciences Real EstateUnder Construction29p · 6 filings · 20 docs
Floor 1Nycha Training CenterUnder Construction110p · 11 filings · 20 docs
MezzanineNycha Training CenterUnder Construction1p · 2 filings · 10 docs
CellarNan Fung Life SciencesUnder Construction171p · 7 filings · 20 docs
BasementNan Fung Life SciencesUnder Construction22p · 5 filings · 20 docs
Sub-BasementNan Fung Life SciencesUnder Construction184p · 10 filings · 20 docs
Site & exteriorBruckner Boulevard Owner LLCUnder Construction31p · 11 filings · 20 docs
Filed — no permit issuedInstall new building water service and sidewalk restoration1p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Bruckner BLVD Owner6910/13/2026
24-02 49th Ave Condominium5110/17/2026
Lic 73 Owner5003/21/2026
Bridgedale4303/21/2026
Westbrook Properties2007/08/2026
Brookdale603/21/2026
Innovo Property Group503/21/2026
Industry Associates403/21/2026
Mayo Studios303/21/2026
2100 49th Avenue Owner203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Synergy Building Consultants703/21/2026
Codegreen503/21/2026
Milrose Consultants403/21/2026
HS Design Studio203/21/2026
Alex Atrachji603/21/2026
AE Design Solution403/21/2026
Eurocelt Expediting203/21/2026
Building Brothers203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Arsenal ScaffoldScaffold2207/08/2026
Starr IndustriesScaffold509/18/2026
Capitol Fire Sprinkler CoFire Protection407/08/2026
Hunter Roberts ConstructionGeneral Contractor409/24/2026
SlscoGeneral Contractor404/09/2026
J.M. BottoPlumbing307/14/2026
Metrocity GroupPlumbing207/08/2026
Patriot ElectricElectrical203/22/2026
Turi ManagementGeneral Contractor207/08/2026
Premier Fire Sprinkler CoFire Protection209/22/2026
Sirina Fire ProtectionFire Protection107/08/2026
Standard Fire ProtectionFire Protection107/08/2026
Adco ElectricalElectrical103/22/2026
Tristate Plumbing ServicesPlumbing106/02/2026
BloomingdalesElectrical103/21/2026
Heller Electric CoElectrical103/21/2026
Archstone BuildersGeneral Contractor107/08/2026
Eagle Scaffolding ServicesScaffold107/03/2026
Everest ScaffoldingScaffold107/08/2026
Universal SystemsScaffold107/08/2026
Active SignsSign hanger107/08/2026
A & M Warshaw Plumbing & HeatingPlumbing107/08/2026
Archer Consultants GroupFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Socotec Engineering49831310/16/2026
Project Tactical Solution58591004/08/2026
Bangash Associates8488102/20/2026
MW Professional Engineering570501/26/2021
Building Lifecycle
All (192)Filed (52)Permit Issued (54)Signed Off (11)Facade (FISP) (9)Violation (60)Inspection (6)
10/16/2026
Filed — Alteration
New structural steel framing and concrete work. 3,000LF
Q01339388-P1
09/23/2026
Permit issued — General Construction
Q01393980-I1-GC
09/21/2026
Permit issued — Plumbing
Q01339436-I1-EW-SP
09/17/2026
Permit issued — Sidewalk Shed
Q01369491-I1-SH
09/08/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/31/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/03/2026
Permit issued — General Construction
Q01354254-I1-GC
07/24/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT
Q01361546-P1
07/15/2026
Violation issued (ECB, open)
Construction
07/15/2026
Violation issued (ECB, closed)
Construction
07/13/2026
Permit issued — Plumbing
Q01339380-I1-PL
07/01/2026
Filed — Alteration
Q01393316-P1
06/29/2026
Filed — Alteration
TEMPORARY FIELD CONSTRUCTION TRAILER , NO CHANGE IN USE, OCCUPANCY OR EGRESS
Q01393980-I1
06/22/2026
Permit issued — Sidewalk Shed
Q01369491-I1-SH
06/16/2026
Permit issued — General Construction
Q01339362-I1-GC
06/08/2026
Permit issued — Plumbing
Q01259419-I1-PL
05/27/2026
Permit issued — Sprinklers
Q01339380-I1-PL
05/12/2026
Permit issued — Plumbing
Q01339436-I1-EW-SP
05/07/2026
Permit issued — Plumbing
Q01339436-I1-PL
05/05/2026
Filed — Alteration
Q01393316-I1
05/05/2026
Permit issued — Supported Scaffold
Q01393316-I1-SF
05/04/2026
Filed — Alteration
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q01369491-P1
04/20/2026
Filed — Alteration
Site/Civil: Install new building water service within 50th Avenue ROW, including trenching and DOT/DOBcompliant sidewalk, curb, and roadway restoration. No curb cuts, drainage structures, or street tree work proposed.
Q01353045-I1
04/20/2026
Permit issued — General Construction
Q01339427-I1-GC
04/20/2026
Permit issued — Sprinklers
Q01339380-I1-PL
04/14/2026
Filed — Alteration
Installation of temporary adjacent roof protections per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q01385298-I1
04/14/2026
Permit issued — Protection and Mechanical Methods
Q01385298-I1-PMM
04/08/2026
Filed — Alteration
Sprinkler modification on 1st floor as per plans filed herewith. No change in egress, use, or occupancy.
Q01259421-P1
04/03/2026
Permit issued — Sprinklers
Q01339380-I1-EW-SP
03/31/2026
Permit issued — Mechanical Systems
Q01259416-I1-MS
03/31/2026
Permit issued — General Construction
Q01259411-I1-GC-CX
03/24/2026
Permit issued — Sidewalk Shed
Q01369491-I1-SH
03/23/2026
Filed — Alteration
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q01369491-I1
03/20/2026
Permit issued — Suspended Scaffold
Q01361546-I1-SC
03/12/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT
Q01361546-I1
03/11/2026
Permit issued — Sprinklers
Q01259421-I1-EW-SP
03/10/2026
Filed — Alteration
Project scope is abatement and removal of existing windows and masonry infill at 5th floor and 6th floor.
Q01354254-P1
03/03/2026
Filed — Alteration
Install new domestic water, booster pump, hot water heaters, lab waste system, gas service; reroute sanitary piping. Provide new wet/dry/pre-action sprinkler systems and modify existing systems for basement, roof, and loading dock.
Q01339380-I1
03/03/2026
Filed — Alteration
New installation of Boiler
Q01339398-I1
03/03/2026
Filed — Alteration
Q01339403-S1
03/03/2026
Filed — Alteration
Q01339403-I1
03/03/2026
Filed — Alteration
Project scope is to include installation of new roofing systems at portions of the existing roof.
Q01333135-I1
03/03/2026
Filed — Alteration
Q01339362-I1
03/03/2026
Filed — Alteration
Q01339436-I1
03/03/2026
Filed — Alteration
New lab/office renovation on the 5th and 6th floors supported by existing base building infrastructure.
Q01339432-I1
03/03/2026
Filed — Alteration
New MEP/FP infrastructure scope to support future lab fitout on the 5th and 6th floors.
Q01339372-I1
03/02/2026
Filed — Alteration
New structural steel framing and concrete work. 3,000LF
Q01339388-I1
03/02/2026
Filed — Alteration
New slab penetrations and associated reinforcing steel. 42LF. New concrete mechanical pads.
Q01339440-I1
03/02/2026
Filed — Alteration
Q01339427-I1
02/27/2026
Filed — Alteration
Project scope is abatement and removal of existing windows and masonry infill at 5th floor and 6th floor.
Q01354254-I1
02/27/2026
Filed — Alteration
Q01333118-I1
02/23/2026
Permit issued — Protection and Mechanical Methods
Q01359748-I1-PMM
02/20/2026
Filed — Alteration
Q01359748-I1
01/29/2026
Permit issued — Structural
Q01259411-I1-GC-CX
01/22/2026
Permit issued — Mechanical Systems
Q01259416-I1-MS
01/20/2026
Permit issued — Plumbing
Q01259419-I1-PL
10/30/2025
Signed off — Alteration
Q00336725-I1
08/28/2025
Filed — Alteration
Sprinkler modification on 1st floor as per plans filed herewith. No change in egress, use, or occupancy.
Q01259421-I1
08/28/2025
Filed — Alteration
General Construction Modification of 1st floor per plans filed herewith. No change in egress, use, or occupancy.
Q01259411-I1
08/28/2025
Filed — Alteration
Q01259419-I1
Latest 60 of 192 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedHunter Roberts Construction09/23/2026
DOB NOWSprinklersPermit IssuedPremier Fire Sprinkler Co09/21/2026
DOB NOWSidewalk ShedPermit IssuedStarr Industries09/17/2026
DOB NOWGeneral ConstructionPermit IssuedHunter Roberts Construction08/03/2026
DOB NOWPlumbingPermit IssuedJ.M. Botto07/13/2026
DOB NOWSidewalk ShedPermit IssuedStarr Industries06/22/2026
DOB NOWGeneral ConstructionPermit IssuedHunter Roberts Construction06/16/2026
DOB NOWPlumbingPermit IssuedMetrocity Group06/08/2026
DOB NOWPlumbingPermit IssuedJ.M. Botto05/27/2026
DOB NOWSprinklersPermit IssuedPremier Fire Sprinkler Co05/12/2026
DOB NOWPlumbingPermit IssuedTristate Plumbing Services05/07/2026
DOB NOWSupported ScaffoldPermit IssuedEagle Scaffolding Services05/05/2026
DOB NOWGeneral ConstructionPermit IssuedHunter Roberts Construction04/20/2026
DOB NOWPlumbingPermit IssuedJ.M. Botto04/20/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedStarr Industries04/14/2026
DOB NOWSprinklersPermit IssuedSirina Fire Protection04/03/2026
DOB NOWMechanical SystemsPermit IssuedSlsco03/31/2026
DOB NOWGeneral ConstructionPermit IssuedSlsco03/31/2026
DOB NOWSidewalk ShedPermit IssuedStarr Industries03/24/2026
DOB NOWSuspended ScaffoldPermit IssuedElm Suspension Systems03/20/2026
DOB NOWSprinklersPermit IssuedArcher Consultants Group03/11/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedStarr Industries02/23/2026
DOB NOWStructuralPermit IssuedSlsco01/29/2026
DOB NOWMechanical SystemsPermit IssuedSlsco01/22/2026
DOB NOWPlumbingPermit IssuedMetrocity Group01/20/2026
DOB NOWMechanical SystemsSigned-offArchstone Builders05/21/2024
DOB NOWSignSigned-offActive Signs01/13/2023
DOB NOWSidewalk ShedSigned-offArsenal Scaffold09/07/2021
DOB NOWStandpipeSigned-offStandard Fire Supp08/30/2021
DOB NOWStructuralSigned-offTuri Management07/19/2021
DOB NOWSprinklersSigned-offCapitol Fire Sprinkler Co06/30/2021
DOB NOWStandpipeSigned-offCapitol Fire Sprinkler Co06/29/2021
DOB NOWMechanical SystemsPermit IssuedTuri Management05/27/2021
DOB NOWSupported ScaffoldPermit IssuedUniversal Systems05/07/2021
DOB NOWSidewalk ShedSigned-offArsenal Scaffold03/22/2021
DOB NOWSupported ScaffoldSigned-offArsenal Scaffold03/22/2021
DOB NOWConstruction FenceSigned-offArsenal Scaffold03/22/2021
DOB NOWConstruction FenceSigned-offArsenal Scaffold12/31/2020
DOB NOWSprinklersSigned-offCapitol Fire Sprinkler Co06/29/2020
DOB NOWStandpipeSigned-offCapitol Fire Sprinkler Co06/29/2020
+ 60 more permits on file
3 projects · most recent 03/03/2026
Air Conditioning Systems Heating and Air Conditioning Systems Heating Systems Refrigeration Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/03/2026——Air Conditioning Systems, Heating and Air Conditioning Systems, Heating Systems, Refrigeration Systems
Cooling
Haakon Custom DOAS Series (shop drawings) 7,600,000 BTU · Doas ×2
Custom High‑Plume Exhaust System 3,822 BTU · Ahu ×1
Liebert Liebert MT60K 88,300 BTU · Crac Unit ×2
Mitsubishi Electric PUZ‑A36NKA7 36,000 BTU · Fan Coil Indoor ×2
Trane HDWA Series 1,013 tons · Chiller ×2
Heat / Cool
Haakon Custom high‑plume exhaust AHU coil 2,996 BTU ×1
Heating
Haakon Custom coil section inside AHU‑1 3,822 BTU ×1
Custom coil section inside AHU‑2 3,822 BTU ×1
Ventilation
Haakon Custom DOAS Series (Shop Fabricated) 42,500 CFM · Ahu ×2
Custom High‑Plume Series 85,000 CFM · Ahu ×1
Oxygen8 H15_IN_BP 1,050 CFM · Erv ×2
Refrigeration
Mitsubishi Electric PUZ‑A36NKA7 36,000 BTU · Vrf Outdoor ×2
03/03/2026——Heating and Air Conditioning Systems
Heat / Cool
Liebert MT048E 49,100 BTU · Crac Unit ×8
MMD18E 18,200 BTU ×2
MMD96E 89,100 BTU · Crac Unit ×2
Mitsubishi Electric PFD054AL 4 tons · Vrf Indoor ×8
PFH020AL 2 tons · Vrf Indoor ×2
PFH096A 7 tons · Vrf Indoor ×2
08/28/2025Permit IssuedSlscoAir Conditioning Systems, Heating Systems
Cooling
Mammoth V-CUBE VVA-342-GXST 35 tons · Wshp ×1
Heating
Trane TRANE VCEF 10 5 kW ×5
TRANE VCEF 08 2 kW ×4
TRANE VCEF 12 4 kW ×2
TRANE VCEF 8 3 kW ×1
Qmark CWH1207DSF 2 kW ×1
3 projects · most recent 04/08/2026
FiledStatusContractorScope
04/08/2026Permit IssuedArcher Consultants Group88 heads
03/03/2026Permit IssuedSirina Fire Protection221 heads
01/26/2021Signed-offCapitol Fire Sprinkler Co181 heads, 6 outlets
2 projects · most recent 03/03/2026
Water/Sanitary Gas Storm
FiledStatusContractorScope
03/03/2026Permit IssuedJ.M. BottoGas, Storm, Water/Sanitary
10/30/2020Signed-offA & M Warshaw Plumbing & HeatingWater/Sanitary
25 projects · most recent 06/12/2026
General Wiring Lighting
FiledStatusContractorScope
06/12/2026Permit IssuedNead ElectricGeneral Wiring
06/12/2026Permit IssuedNead ElectricGeneral Wiring
05/06/2026Permit IssuedAdco ElectricalGeneral Wiring
05/06/2026Permit IssuedAdco ElectricalGeneral Wiring
03/30/2026Permit IssuedAdco Electrical—
03/20/2026Permit IssuedJ.A. Lee Electric ServicesGeneral Wiring
03/18/2026Permit IssuedAdco Electrical—
03/13/2026Permit IssuedNead Electric—
02/18/2026Permit IssuedJ.A. Lee Electric Services—
09/12/2025Permit IssuedAdco ElectricalGeneral Wiring
03/06/2024CompleteJ.A. Lee Electric Services—
04/10/2023CompletePatriot ElectricGeneral Wiring
09/01/2022CompletePatriot ElectricGeneral Wiring
01/31/2022CompleteFreedom Electl & DataGeneral Wiring
09/14/2021CompleteNash Electric Services—
4 projects · most recent 10/16/2026
Concrete Steel Masonry
FiledStatusContractorScope
10/16/2026——Steel, Concrete, Masonry
06/29/2026Permit IssuedHunter Roberts Construction1 scope_items
03/02/2026——Steel, Concrete
08/28/2025Permit IssuedSlscoConcrete
2 projects · most recent 05/04/2026
Sidewalk Shed Scaffold
FiledStatusContractorScope
05/04/2026Permit IssuedStarr IndustriesSidewalk Shed
05/06/2021Permit IssuedUniversal SystemsScaffold
1 project · most recent 07/24/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
07/24/2026Permit IssuedElm Suspension SystemsSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
09/08/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/31/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/23/2022Pass-Final SD - Up to 3 Requested FloorsPassView ↗
04/22/2022Pass-Final SD - Up to 3 Requested FloorsPassView ↗
03/07/2022Fail-Final SD - Up to 3 Requested FloorsFailView ↗
12/22/2021Pass-Final SD - Fire PumpPassView ↗
▾Special Inspection Requirements (DOB NOW) — 118
DateRequirementInspectorRole
05/02/2026Post-installed AnchorsMax Leespecial
05/02/2026Sprinkler SystemsMax Leespecial
04/28/2026FinalDANNY TRUJILLOprogress
04/23/2026Lowest Floor Elevation—progress
04/23/2026Lowest Floor Elevation—progress
03/26/2026Sprinkler SystemsMax Leespecial
03/26/2026Post-installed AnchorsMax Leespecial
03/11/2026FinalMARISA HARTEprogress
03/11/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)MARISA HARTEspecial
03/11/2026Lowest Floor ElevationMARISA HARTEprogress
03/10/2026Final—progress
03/10/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)—special
03/10/2026Lowest Floor Elevation—progress
02/18/2026Heating SystemsMARISA HARTEspecial
02/18/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)MARISA HARTEspecial
02/18/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)MARISA HARTEspecial
02/06/2026Non Potable Water SystemsMARISA HARTEspecial
01/30/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)MARISA HARTEspecial
01/30/2026Lowest Floor ElevationMARISA HARTEprogress
01/29/2026FinalMARISA HARTEprogress
01/29/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)MARISA HARTEspecial
01/21/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)MARISA HARTEspecial
01/21/2026Lowest Floor ElevationMARISA HARTEprogress
01/21/2026Energy Code Compliance InspectionsMARISA HARTEprogress
12/23/2025Shutoff dampersMARISA HARTEenergy_progress
Latest 25 of 118.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Nan Fung Life SciencesLaboratoryCellar, Sub-basement, Floors 5, 6, Roof
Project Q01333135 Alteration · Approved · 03/03/2026
Project Q01339398 Alteration · Approved · 03/03/2026
Project Q01339427 Alteration · Permit Entire · 03/02/2026
Project Q01333118 Alteration · Approved · 02/27/2026
Project Q01354254 Alteration · Permit Entire · 02/27/2026
Nycha Training CenterEducationFloor 1
Project Q01259411 Alteration · Permit Entire · 08/28/2025
Project Q01259416 Alteration · Permit Entire · 08/28/2025
Project Q01259421 Alteration · Permit Entire · 08/28/2025
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 975 on file (BIS + DOB NOW)
▸Plans & Drawings51
▸DOB NOWPlans/Sketch36
08/29/2026Q00037797-I1Request digital key ↗
08/28/2026Q00056647-I1Request digital key ↗
08/28/2026Q00056655-I1Request digital key ↗
Showing 3 of 36 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler3
08/28/2026Q00334571-I1Request digital key ↗
08/15/2026Q00334571-P2Request digital key ↗
08/15/2026Q00334571-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Standpipe3
08/28/2026Q00334571-I1Request digital key ↗
08/15/2026Q00334571-P1Request digital key ↗
08/15/2026Q00334571-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
08/28/2026Q00334537-I1Request digital key ↗
08/15/2026Q00334537-P3Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold2
08/28/2026Q00177723-I1Request digital key ↗
08/28/2026Q00359855-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
08/28/2026Q00056647-I1Request digital key ↗
08/15/2026Q00056647-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/28/2026Q00112169-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
08/28/2026Q00336725-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/28/2026Q00331727-I1Request digital key ↗
▸Applications & Permits178
▸BISPLAN / WORK APPROVAL APPLICATION138
01/30/2026421518566Open ↗
06/18/2025421518566Open ↗
06/17/2025421574889Open ↗
Showing 3 of 138 on file for this type
▸BISWORK PERMIT APPLICATION39
06/11/2021421574772Open ↗
06/11/2021421574772Open ↗
08/24/2020421518566Open ↗
Showing 3 of 39 on file for this type
▸BISAFTER-HOUR WORK PERMIT APPLICATION1
06/01/2022440543672Open ↗
▸Zoning, Tax Lot & Property Records6
▸BISFLOOD ZONE DESIGN CERTIFICATION4
06/22/2020440590264Open ↗
06/03/2020440593733Open ↗
Showing 2 of 4 on file for this type
▸BISFLOOD ZONE COMPLIANCE2
11/13/2024421725306Open ↗
11/13/2024421519351Open ↗
▸Seals & Professional Certifications225
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION72
06/14/2019421896504Open ↗
06/13/2019421897451Open ↗
06/07/2019421897451Open ↗
Showing 3 of 72 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature50
08/28/2026Q00056647-P1Open ↗
08/28/2026Q00056647-I1Open ↗
08/28/2026Q00056655-I1Open ↗
Showing 3 of 50 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature32
10/12/2026Q01339403-I1Open ↗
10/12/2026Q01339403-I1Open ↗
09/28/2026Q01339380-I1Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWProgress Inspector Seal & Signature26
09/23/2026Q01333135-I1Open ↗
09/01/2026Q00112169-I1Open ↗
08/29/2026Q01259411-I1Open ↗
Showing 3 of 26 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT15
06/22/2020440590264Open ↗
06/03/2020440593733Open ↗
06/07/2019421897451Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST12
06/07/2019421897451Open ↗
Showing 1 of 12 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION6
06/22/2020440590264Open ↗
06/03/2020440593733Open ↗
Showing 2 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY6
06/22/2020440590264Open ↗
06/03/2020440593733Open ↗
Showing 2 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment94
▸BISEQUIPMENT USE PERMITS47
02/05/2025421574889Open ↗
Showing 1 of 47 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE21
01/02/2020421574772Open ↗
06/07/2019421897451Open ↗
Showing 2 of 21 on file for this type
▸BISSCHEDULE B - PLUMBING11
01/08/2021440543672Open ↗
11/16/2020440543672Open ↗
10/26/2020440543672Open ↗
Showing 3 of 11 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA4
05/04/2022421725306Open ↗
01/25/2021421694688Open ↗
12/17/2019421519351Open ↗
Showing 3 of 4 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION4
01/19/2021440543672Open ↗
01/19/2021440543672Open ↗
Showing 2 of 4 on file for this type
▸BISBOILERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection10
▸BISSTREET TREE CHECKLIST8
07/18/2020421518566Open ↗
07/07/2020421570473Open ↗
Showing 2 of 8 on file for this type
▸BISTenant Protection Plan and Notes1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWTenant Protection Plan1
08/13/2026Q00056647-P1Open ↗
▸Environmental & Asbestos55
▸DOB NOWDEP ACP-5: Asbestos Assessment Report29
08/28/2026Q00056655-I1Open ↗
08/28/2026Q00334537-P3Open ↗
08/28/2026Q00334537-I1Open ↗
Showing 3 of 29 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)20
06/22/2020440590264Open ↗
06/03/2020440593733Open ↗
07/16/2019421518566Open ↗
Showing 3 of 20 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance32
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS21
05/30/2019421518566Open ↗
Showing 1 of 21 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
06/22/2020440590264Open ↗
06/03/2020440593733Open ↗
Showing 2 of 3 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
01/16/2025421574889Open ↗
10/16/2023440544485Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
06/22/2020440590264Open ↗
06/03/2020440593733Open ↗
▸BISNYCECC ANALYSIS2
06/22/2020440590264Open ↗
06/03/2020440593733Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
02/05/2025421574889Open ↗
▸BISELECTRIC MOTORS1
02/04/2025421574889Open ↗
▸Inspections & Test Reports45
▸BISTECHNICAL REPORT: RESPONSIBILITY23
06/18/2025421574889Open ↗
06/18/2025421574889Open ↗
07/19/2023421574889Open ↗
Showing 3 of 23 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS5
06/14/2019440543672Open ↗
Showing 1 of 5 on file for this type
▸BISHYDRO FLOW TEST LETTER3
08/09/2019440543672Open ↗
Showing 1 of 3 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
02/04/2025421574889Open ↗
07/19/2023440544485Open ↗
▸Approvals, Objections & Sign-offs71
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST27
11/19/2024421519351Open ↗
11/19/2024421694688Open ↗
11/14/2024421725306Open ↗
Showing 3 of 27 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION17
08/30/2019421518566Open ↗
Showing 1 of 17 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE12
01/30/2026421518566Open ↗
05/31/2024421518566Open ↗
Showing 2 of 12 on file for this type
▸BISADMINISTRATIVE OBJECTIONS10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISSUPERSEDING LETTER2
08/24/2020421518566Open ↗
08/09/2019421518566Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/17/2026Q01393316-I1Open ↗
08/17/2026Q01393316-P1Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership54
▸BISCOST AFFIDAVIT48
01/19/2021440543672Open ↗
06/22/2020440590264Open ↗
06/03/2020440593733Open ↗
Showing 3 of 48 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW36
01/16/2025421574889Open ↗
11/13/2024421725306Open ↗
05/29/2024421082820Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms108
▸BISADDITIONAL INFORMATION45
03/03/2021440543672Open ↗
03/01/2021440593733Open ↗
02/03/2021440543672Open ↗
Showing 3 of 45 on file for this type
▸BISEFILING COVER SHEET31
06/07/2019421897451Open ↗
Showing 1 of 31 on file for this type
▸BISBOROUGH INTAKE FORM23
06/11/2021421574772Open ↗
06/11/2021421574772Open ↗
04/20/2020421518566Open ↗
Showing 3 of 23 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET9
06/22/2020440590264Open ↗
06/03/2020440593733Open ↗
Showing 2 of 9 on file for this type
▸Other Documents27
▸BISFEMA ELEVATION CERT (086-0-33)/ FLOODPROOFING CERT (086-0-34)7
11/19/2024421519351Open ↗
11/19/2024421694688Open ↗
06/07/2019440544485Open ↗
Showing 3 of 7 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
03/03/2021440543672Open ↗
12/16/2020440543672Open ↗
12/16/2020440543672Open ↗
Showing 3 of 5 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFEMA FORM (81-31): ELEVATION CERTIFICATE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSUBSTANTIAL IMPROVEMENT CALCULATIONS2
06/22/2020440590264Open ↗
06/03/2020440593733Open ↗
▸BISPLOT DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWManufacturer's Specifications2
08/17/2026Q01361546-I1Open ↗
08/17/2026Q01361546-P1Open ↗
▸DOB NOWCalculations2
08/17/2026Q01361546-I1Open ↗
08/17/2026Q01361546-P1Open ↗
▸BISMAINTENANCE INFORMATION1
02/05/2025421574889Open ↗