← Back
Training school
24-02 QUEENS PLAZA SOUTH
QUEENS · Long Island City-Hunters Point · BIN 4005062
💬 Discuss this project
1949Year Built
3Stories
W4Building Class
M1-6/R9Zoning
74,105 sfGross Floor Area
1Units
LL97 Covered0 Open Violations
Training school · Owner of record: 2402 QPS LLC · 24,500 sf lot · 3.02 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalFire ProtectionEquipmentCivilGeneralOther
Bulkhead1p · 1 filing · 20 docs
Floor 211p · 3 filings · 20 docs
Floor 110p · 3 filings · 20 docs
Basement1p · 1 filing · 8 docs
Sub-Basement9p · 2 filings · 12 docs
Site & exterior11p · 4 filings · 8 docs
Filed — no permit issued176p · 6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LAKEWOOD GROUP1007/08/2026
ELECTRIC REALTY303/21/2026
APEX TECHNICAL SCHOOL203/21/2026
75 VARICK STREET103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/22/2023$49.0M—— → —$661/sf building
09/14/2020$40.0M—— → —$540/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPEDITE DEM1003/21/2026
MEIYUN CHEN203/21/2026
A1 EXPEDITING SERVICE CORP.903/21/2026
HOWARD I SHAPIRO ASSOCIATES603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LAKEWOOD GROUP CORPGeneral Contractor907/08/2026
CS BRIDGE CORPGeneral Contractor307/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ARK ENGINEERING PC7261404/08/2025
Building Lifecycle
All (178)Filed (22)Permit Issued (11)Signed Off (8)Violation (38)Objection (69)Special Inspection (30)
11/07/2025
Signed off — Alteration
FILE TEMPORARY CONSTRUCTION FENCE.
Q00978362-I1
11/05/2025
Signed off — Alteration
installation of chute to lower debris from floor to floor, and in accordance with approved plans.
Q01106996-S1
11/05/2025
Signed off — Alteration
installation of chute to lower debris from floor to floor, and in accordance with approved plans.
Q01106996-I1
09/29/2025
Signed off — Alteration
Q01097548-I1
09/29/2025
Signed off — Alteration
Installation of temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q01097599-I1
09/29/2025
Signed off — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q01097562-I1
04/30/2025
Signed off — Full Demolition
full demolition of two story structure, using hand held and mechanical means to assist
Q01083178-I1
04/08/2025
Filed — Full Demolition
full demolition of two story structure, using hand held and mechanical means to assist
Q01083178-P2
04/08/2025
Special inspection requirement — Structural Stability – Alterations of existing Buildings
George Lau
04/08/2025
Special inspection requirement — Demolition
George Lau
03/21/2025
Filed — Full Demolition
full demolition of two story structure, using hand held and mechanical means to assist
Q01083178-P1
03/20/2025
Violation issued (ECB, closed)
Unknown
03/20/2025
Violation issued (ECB, closed)
Unknown
03/20/2025
Violation issued (ECB, closed)
Construction
03/20/2025
Special inspection requirement — Structural Stability – Alterations of existing Buildings
George Lau
03/20/2025
Special inspection requirement — Demolition
George Lau
02/12/2025
Permit issued — Full Demolition
Q01083178-I1-FD
01/22/2025
Permit issued — Full Demolition
Q01083178-I1-FD
01/03/2025
Permit issued — Full Demolition
Q01083178-I1-FD
12/05/2024
Permit issued — Protection and Mechanical Methods
Q01106996-S1-PMM
12/05/2024
Permit issued — Protection and Mechanical Methods
Q01106996-I1-PMM
12/05/2024
Permit issued — Full Demolition
Q01083178-I1-FD
10/04/2024
Permit issued — Protection and Mechanical Methods
Q01097599-I1-PMM
10/04/2024
Permit issued — Supported Scaffold
Q01097562-I1-SF
10/04/2024
Permit issued — Sidewalk Shed
Q01097548-I1-SH
10/03/2024
Filed — Alteration
Q01097548-I1
10/03/2024
Filed — Alteration
Installation of temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q01097599-I1
10/03/2024
Filed — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q01097562-I1
09/25/2024
Filed — Alteration
installation of chute to lower debris from floor to floor, and in accordance with approved plans.
Q01106996-S1
09/25/2024
Filed — Alteration
installation of chute to lower debris from floor to floor, and in accordance with approved plans.
Q01106996-I1
09/18/2024
Signed off — Alteration
Interior Demolition as per plans filed herewith.
Q01082168-I1
09/11/2024
Objection resolved — Addressed
08/22/2024
Filed — Alteration
Q01094365-I1
08/20/2024
Objection raised — Other
08/12/2024
Filed — Full Demolition
full demolition of two story structure, using hand held and mechanical means to assist
Q01083178-I1
08/12/2024
Special inspection requirement — Final
SAGAR BEHARRY
08/09/2024
Filed — Alteration
Interior Demolition as per plans filed herewith.
Q01082168-P1
08/09/2024
Special inspection requirement — Demolition
George Lau
08/01/2024
Special inspection requirement — Final
SAGAR BEHARRY
07/25/2024
Permit issued — Structural
Q01082168-I1-GC-CX
07/22/2024
Filed — Alteration
Interior Demolition as per plans filed herewith.
Q01082168-I1
07/01/2024
Permit issued — Construction Fence
Q00978362-I1-FN
02/14/2024
Objection raised — Structural
02/14/2024
Objection raised — Admin
02/14/2024
Objection raised — Structural
02/14/2024
Objection raised — C-27
02/14/2024
Objection raised — C-26
02/14/2024
Objection raised — Mechanical
02/14/2024
Objection raised — Other
02/14/2024
Objection raised — Structural
02/07/2024
Filed — Alteration
FILE TEMPORARY CONSTRUCTION FENCE.
Q00978362-I1
02/07/2024
Filed — Full Demolition
THIS JOB IS FILED FOR DEMOLITION OF TWO STORY BUILDING.
Q00978360-I1
05/09/2022
Objection raised — Other
05/09/2022
Objection resolved — Resolved
03/24/2022
Objection raised — Other
03/24/2022
Objection raised — Admin
03/24/2022
Objection resolved — Addressed
03/08/2022
Objection raised — Energy
03/07/2022
Objection raised — Energy
03/07/2022
Objection resolved — Addressed
Latest 60 of 178 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFull DemolitionSigned-offLAKEWOOD GROUP02/12/2025
DOB NOWFull DemolitionSigned-offLAKEWOOD GROUP01/22/2025
DOB NOWFull DemolitionSigned-offLAKEWOOD GROUP01/03/2025
DOB NOWProtection and Mechanical MethodsSigned-offLAKEWOOD GROUP12/05/2024
DOB NOWProtection and Mechanical MethodsSigned-offLAKEWOOD GROUP12/05/2024
DOB NOWFull DemolitionSigned-offLAKEWOOD GROUP12/05/2024
DOB NOWProtection and Mechanical MethodsSigned-offCS BRIDGE CORP10/04/2024
DOB NOWSupported ScaffoldSigned-offCS BRIDGE CORP10/04/2024
DOB NOWSidewalk ShedSigned-offCS BRIDGE CORP10/04/2024
DOB NOWStructuralSigned-offLAKEWOOD GROUP07/25/2024
DOB NOWConstruction FenceSigned-offLAKEWOOD GROUP07/01/2024
BISOTISSUEDIDK COOLING CORP08/10/2018
BIS—ISSUEDRED HOOK SIGN AND ELECT C10/24/2013
BIS—ISSUEDRED HOOK SIGN AND ELECT C08/27/2013
BIS—ISSUEDRED HOOK SIGN AND ELECT C08/27/2013
BIS—ISSUEDRED HOOK SIGN AND ELECT C08/27/2013
BIS—ISSUEDRED HOOK SIGN AND ELECT C08/27/2013
BISOTISSUEDATLAS CAPITAL GROUP02/22/2013
BIS—ISSUEDENVIROCHROME INTERIORS INC07/06/2012
BISOTISSUEDENVIROCHROME INTERIORS INC07/06/2012
BISOTISSUEDENVIROCHROME INTERIORS INC07/06/2012
BISFSISSUEDEAST COAST PETROLEUM INC06/28/2012
BISPLISSUEDACCURATE MECHANICAL INC05/30/2012
BISEQISSUEDENVIROCHROME INTERIORS INC03/19/2012
BISPLISSUEDACCURATE MECHANICAL INC03/15/2012
BISSDISSUEDACCURATE MECHANICAL INC03/06/2012
BIS—ISSUEDENVIROCHROME INTERIORS INC02/28/2012
BISMHISSUEDENVIROCHROME INTERIORS INC02/09/2012
BISOTISSUEDENVIROCHROME INTERIORS INC02/09/2012
BISOTISSUEDENVIROCHROME INTERIORS INC02/09/2012
BISPLISSUEDDPH PLUMBING & HTG CORP01/30/2012
BISMHISSUEDENVIROCHROME INTERIORS INC12/20/2011
BISEQISSUEDSTONELEDGE SCAFFOLDING CORP03/06/2008
BISPLISSUEDGJ PLUMBING LLC09/27/2000
BISBLRE-ISSUEDHIRBRO PLUMBING INC.07/24/2000
BISPLISSUEDHIRBRO PLUMBING INC.07/24/2000
BISPLISSUEDCHINATOWN PLBG & HTG INC06/22/2000
BISOTISSUEDS. MACEDO CONSTRUCTION06/07/2000
BISEQISSUEDS. MACEDO CONSTRUCTION06/07/2000
BISEQISSUEDCOLGATE SCAFFOLDING08/11/1999
1 project · most recent 01/27/2022
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
01/27/2022——Air Conditioning Systems
Cooling
Vertiv PX011UW1A8 40,400 BTU · Packaged Unit ×3
PX023UW1A8 90,800 BTU · Packaged Unit ×1
Mitsubishi Electric PQHY-P144YSLMU-A1 12,000 tons · Vrf Outdoor ×2
1 project · most recent 09/24/2024
FiledStatusContractorScope
09/24/2024CompleteNASH ELECTRIC SERVICES IN—
1 project · most recent 01/27/2022
Steel Concrete
FiledStatusContractorScope
01/27/2022——Steel, Concrete
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
04/08/2025Structural Stability – Alterations of existing BuildingsGeorge Lauspecial
04/08/2025DemolitionGeorge Lauspecial
03/20/2025Structural Stability – Alterations of existing BuildingsGeorge Lauspecial
03/20/2025DemolitionGeorge Lauspecial
08/12/2024FinalSAGAR BEHARRYprogress
08/09/2024DemolitionGeorge Lauspecial
08/01/2024FinalSAGAR BEHARRYprogress
02/22/2022Fuel-Oil Storage and Fuel-Oil Piping Systems—special
02/17/2022Subsurface Investigations (Borings/Test Pits)—special
01/06/2022Energy Code Compliance Inspections—progress
01/06/2022HVAC-R and service water heating system controls—energy_progress
01/06/2022HVAC-R and service water piping design and insulation—energy_progress
01/06/2022HVAC-R and service water heating equipment—energy_progress
12/22/2021Fire-Resistant Penetrations and Joints—special
12/22/2021Post-installed Anchors—special
12/22/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
12/22/2021Excavations - Sheeting, Shoring, and Bracing—special
12/22/2021Structural Stability – Alterations of existing buildings—special
12/22/2021Subsurface Conditions – Fill Placement & In-Place Density—special
12/22/2021Post-installed Anchors—special
12/22/2021Sprayed fire-resistant materials—special
12/22/2021Structural Steel - High Strength Bolting—special
12/22/2021Structural Steel - Welding—special
12/22/2021Mastic and Intumescent Fire-resistant Coatings—special
12/22/2021Deep Foundation Elements—special
Latest 25 of 31.
▾Documents — 492 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch21
08/26/2026Q00641817-S3Request digital key ↗
08/26/2026Q00641817-S5Request digital key ↗
08/23/2026Q00978360-I1Request digital key ↗
Showing 3 of 21 on file for this type
▸Applications & Permits73
▸BISPLAN / WORK APPROVAL APPLICATION41
12/31/2021440700449Open ↗
04/24/2020421093300Open ↗
04/11/2019421655612Open ↗
Showing 3 of 41 on file for this type
▸BISWORK PERMIT APPLICATION25
09/19/2018421655612Open ↗
10/29/2013420897667Open ↗
09/04/2013420623383Open ↗
Showing 3 of 25 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
06/15/2022440700449Open ↗
12/31/2021440700449Open ↗
Showing 2 of 3 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications3
12/03/2013420623383Open ↗
12/03/2013420623409Open ↗
03/29/2013420514768Open ↗
▸BISCERTIFICATE OF OCCUPANCY APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q00641817-I1Open ↗
▸Seals & Professional Certifications103
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION56
11/29/2019421655612Open ↗
11/29/2019421655612Open ↗
07/23/2018421655612Open ↗
Showing 3 of 56 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature21
08/26/2026Q00641817-S3Open ↗
08/26/2026Q00641817-S2Open ↗
08/26/2026Q00641817-I1Open ↗
Showing 3 of 21 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST8
07/23/2018421655612Open ↗
10/10/2013420897667Open ↗
09/18/2012420623392Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
09/18/2012420623392Open ↗
09/17/2012420623383Open ↗
09/17/2012420622990Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026Q01083178-P1Open ↗
09/01/2026Q01083178-P1Open ↗
09/01/2026Q01094365-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
10/23/2018420623392Open ↗
07/23/2018421655612Open ↗
10/10/2013420897667Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026Q01082168-P1Open ↗
08/23/2026Q01082168-I1Open ↗
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
12/31/2021440700449Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/31/2021440700449Open ↗
▸Trade Schedules & Equipment66
▸BISEQUIPMENT USE PERMITS30
12/12/2013420509603Open ↗
12/12/2013420509603Open ↗
12/12/2013420509603Open ↗
Showing 3 of 30 on file for this type
▸BISEQUIPMENT USE APPLICATION-PERMIT6
12/07/2013420509603Open ↗
12/07/2013420509603Open ↗
12/07/2013420509603Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSELF-CERT PLUMBING NOTICE6
02/06/2014420623383Open ↗
Showing 1 of 6 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT5
03/04/2013420514768Open ↗
02/28/2013420514768Open ↗
02/04/2013420514768Open ↗
Showing 3 of 5 on file for this type
▸BISWATER METER PERMIT : DEP-METER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
09/29/2012420514679Open ↗
09/20/2012420514679Open ↗
▸BISRPZ/DDCV TEST REPORT : GEN215B2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
07/23/2018421655612Open ↗
▸BISSTANDPIPE INSP REPORT : FP-841
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWElectric Cut-Off1
08/13/2026Q01083178-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026Q01083178-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026Q01083178-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026Q01083178-I1Open ↗
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026Q00641817-I1Open ↗
▸Safety & Tenant Protection16
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISSTREET TREE CHECKLIST2
06/15/2022440700449Open ↗
Showing 1 of 2 on file for this type
▸BISST-1 Street Tree Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00641817-I1Open ↗
▸Environmental & Asbestos21
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER5
09/18/2012420623392Open ↗
09/14/2012420623383Open ↗
Showing 2 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/21/2026Q01082168-P1Open ↗
08/21/2026Q01082168-I1Open ↗
08/20/2026Q01083178-P2Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
07/23/2018421655612Open ↗
06/29/2015421093300Open ↗
Showing 2 of 3 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)1
09/17/2012420622990Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
10/10/2013420897667Open ↗
▸DOB NOWRodent Control1
08/13/2026Q01083178-I1Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
07/23/2018421655612Open ↗
07/23/2018421655612Open ↗
03/31/2015421093300Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
11/29/2019421655612Open ↗
03/29/2013420528539Open ↗
Showing 2 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports8
▸BISHYDRAULIC FLOW CALCULATIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWSOIL REPORT1
08/13/2026Q00641817-S4Open ↗
▸Approvals, Objections & Sign-offs77
▸BISLETTERS - SUPPORTING DOCUMENTATION34
07/23/2018421655612Open ↗
07/23/2018421655612Open ↗
07/23/2018421655612Open ↗
Showing 3 of 34 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST19
12/13/2019420623392Open ↗
11/29/2019421655612Open ↗
11/03/2018420623392Open ↗
Showing 3 of 19 on file for this type
▸BISADMINISTRATIVE OBJECTIONS16
03/31/2015421093300Open ↗
10/10/2013420897667Open ↗
09/17/2012420623409Open ↗
Showing 3 of 16 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE5
12/07/2013420509603Open ↗
11/01/2013420509603Open ↗
12/07/2013420509603Open ↗
Showing 3 of 5 on file for this type
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL1
05/04/2022440700449Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership30
▸BISCOST AFFIDAVIT30
11/29/2019421655612Open ↗
11/05/2018420623392Open ↗
07/23/2018421655612Open ↗
Showing 3 of 30 on file for this type
▸Filing & Intake Forms36
▸BISEFILING COVER SHEET18
07/23/2018421655612Open ↗
03/31/2015421093300Open ↗
10/10/2013420897667Open ↗
Showing 3 of 18 on file for this type
▸BISADDITIONAL INFORMATION15
02/25/2022440700449Open ↗
06/17/2019421655612Open ↗
05/30/2015421093300Open ↗
Showing 3 of 15 on file for this type
▸BISBOROUGH INTAKE FORM2
04/24/2020421093300Open ↗
11/03/2018420623392Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
12/31/2021440700449Open ↗
▸Other Documents20
▸DOB NOWProperty Ownership Certification5
08/23/2026Q00978360-I1Open ↗
08/20/2026Q01083178-P2Open ↗
08/20/2026Q01083178-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWStructure Photographs4
08/13/2026Q01083178-I1Open ↗
08/13/2026Q01083178-P2Open ↗
08/13/2026Q00978360-I1Open ↗
Showing 3 of 4 on file for this type
▸BISOP-129 INTERNAL (SECONDARY) BACKFLOW PREVENTION DEVICE TEST REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q00641817-S5Open ↗
08/13/2026Q00641817-I1Open ↗
▸BISFIRE SUPP ANSUL APPROVL- FD-FSS1
01/29/2013420528539Open ↗
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
06/15/2022440700449Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
02/25/2022440700449Open ↗
▸BISBPP-PARKS: REMOVE MATURE TREE1
06/15/2022440700449Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026Q01083178-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026Q01083178-I1Open ↗