← Back
Primarily 1 family with 1 store or office
24-05 23 AVENUE
QUEENS · BIN 4018961
💬 Discuss this project
1920Year Built
2Stories
S1Building Class
R5BZoning
1,872 sfGross Floor Area
2Units
0 Open Violations
Primarily 1 family with 1 store or office · Owner of record: ASTORIA 2405 REALTY LLC · 1,858 sf lot · 1.01 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/26/2023$1.1M—— → —$580/sf building
11/15/2016$900K—2405 OWNERS, LLC → 2405 ASSOC LLC$481/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FRANK J QUATELA ARCHITECT P.C412/27/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Manetta architecture design pllc803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
D.D.S. MECHANICAL PLUMBGeneral Contractor607/08/2026
D.D.S. MECH PBG&HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FRANK J. QUATELA, ARCHITE1632412/27/2023
Building Lifecycle
All (45)Filed (4)Permit Issued (5)Signed Off (4)Violation (5)Inspection (4)Objection (6)Special Inspection (17)
07/22/2024
Signed off — Alteration
PLUMBING APPLICATION FILED TO CAP AND REMOVE EXISTING PLUMBING FIXTURES AND INSTALL NEW PLUMBING FIXTURES AS PER PLANS.
Q00974202-S1
07/22/2024
Signed off — Alteration
PLUMBING APPLICATION FILED TO CAP AND REMOVE EXISTING PLUMBING FIXTURES AND INSTALL NEW PLUMBING FIXTURES AS PER PLANS.
Q00974202-I1
06/18/2024
Signed off — Alteration
FACADE REPAIR TO REPLACE BRICK WALL AND WINDOWS ON SECOND FLOOR AND REPLACE STOREFRONT AT FIRST FLOOR AS PER PLANS. EXISTING STRUCTURAL FRAMING TO REMAIN. NO CHANGE TO USE, EGRESS, OR OCCUPANCY OF EXISTING BUILDING.
Q00975185-I1
06/10/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
05/21/2024
Signed off — Alteration
ERECT CONSTRUCTION FENCE TO SAFE GUARD PROPERTY AT FRONT. IN CONJUNCTION WITH APPLICATION Q00975185. NO CHANGE TO THE USE, EGRESS, AND OCCUPANCY
Q00975356-I1
05/20/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/20/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/04/2024
Permit issued — Construction Fence
Q00975356-I1-FN
02/29/2024
Permit issued — Structural
Q00975185-I1-ST
01/24/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/19/2024
Permit issued — General Construction
Q00975185-I1-GC
01/16/2024
Permit issued — General Construction
Q00974202-I1-GC-CX
01/12/2024
Permit issued — Plumbing
Q00974202-S1-PL
01/08/2024
Objection resolved — Addressed
01/08/2024
Objection resolved — Addressed
01/08/2024
Objection resolved — Addressed
01/05/2024
Objection raised — Other
01/05/2024
Objection raised — Other
01/05/2024
Objection raised — Other
12/27/2023
Filed — Alteration
PLUMBING APPLICATION FILED TO CAP AND REMOVE EXISTING PLUMBING FIXTURES AND INSTALL NEW PLUMBING FIXTURES AS PER PLANS.
Q00974202-S1
12/27/2023
Filed — Alteration
PLUMBING APPLICATION FILED TO CAP AND REMOVE EXISTING PLUMBING FIXTURES AND INSTALL NEW PLUMBING FIXTURES AS PER PLANS.
Q00974202-I1
12/27/2023
Filed — Alteration
FACADE REPAIR TO REPLACE BRICK WALL AND WINDOWS ON SECOND FLOOR AND REPLACE STOREFRONT AT FIRST FLOOR AS PER PLANS. EXISTING STRUCTURAL FRAMING TO REMAIN. NO CHANGE TO USE, EGRESS, OR OCCUPANCY OF EXISTING BUILDING.
Q00975185-I1
12/27/2023
Filed — Alteration
ERECT CONSTRUCTION FENCE TO SAFE GUARD PROPERTY AT FRONT. IN CONJUNCTION WITH APPLICATION Q00975185. NO CHANGE TO THE USE, EGRESS, AND OCCUPANCY
Q00975356-I1
12/11/2023
Special inspection requirement — Insulation placement and R values
FRANK QUATELA
12/11/2023
Special inspection requirement — Structural Cold-Formed Steel
FRANK QUATELA
12/11/2023
Special inspection requirement — Final
FRANK QUATELA
12/11/2023
Special inspection requirement — Energy Code Compliance Inspections
FRANK QUATELA
12/11/2023
Special inspection requirement — Air barrier - visual inspection
FRANK QUATELA
12/11/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
FRANK QUATELA
12/11/2023
Special inspection requirement — Fenestration air leakage
FRANK QUATELA
12/11/2023
Special inspection requirement — Fenestration areas
FRANK QUATELA
12/11/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
FRANK QUATELA
12/11/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FRANK QUATELA
12/08/2023
Special inspection requirement — Energy Code Compliance Inspections
FRANK QUATELA
12/08/2023
Special inspection requirement — Maintenance information
FRANK QUATELA
12/08/2023
Special inspection requirement — HVAC-R and service water heating equipment
FRANK QUATELA
12/08/2023
Special inspection requirement — Permanent certificate
FRANK QUATELA
12/08/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
FRANK QUATELA
12/08/2023
Special inspection requirement — HVAC-R and service water heating system controls
FRANK QUATELA
12/08/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FRANK QUATELA
10/01/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/09/1995
Violation issued (DOB, closed)
VPW*-VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-DISMISSED
09/03/1993
Violation issued (ECB, closed)
Construction
12/10/1991
Violation issued (DOB, closed)
VP*-VIOLATION UNSERVED ECB- DISMISSED
04/05/1990
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offD.D.S. MECHANICAL PLUMB03/04/2024
DOB NOWStructuralSigned-offD.D.S. MECHANICAL PLUMB02/29/2024
DOB NOWGeneral ConstructionSigned-offD.D.S. MECHANICAL PLUMB01/19/2024
DOB NOWGeneral ConstructionSigned-offD.D.S. MECHANICAL PLUMB01/16/2024
DOB NOWPlumbingSigned-offD.D.S. MECH PBG&HTG CORP01/12/2024
BISOTISSUEDVALENZA CONTRACTING CO09/27/1995
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
06/10/2024Pass-Final General Construction Non-Directive 14PassView ↗
05/20/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/20/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/24/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
12/11/2023Insulation placement and R valuesFRANK QUATELAenergy_progress
12/11/2023Structural Cold-Formed SteelFRANK QUATELAspecial
12/11/2023FinalFRANK QUATELAprogress
12/11/2023Energy Code Compliance InspectionsFRANK QUATELAprogress
12/11/2023Air barrier - visual inspectionFRANK QUATELAenergy_progress
12/11/2023Fenestration and door U-factor and product ratingsFRANK QUATELAenergy_progress
12/11/2023Fenestration air leakageFRANK QUATELAenergy_progress
12/11/2023Fenestration areasFRANK QUATELAenergy_progress
12/11/2023Structural Stability – Alterations of existing buildingsFRANK QUATELAspecial
12/11/2023Fire-Resistant Penetrations and JointsFRANK QUATELAspecial
12/08/2023Energy Code Compliance InspectionsFRANK QUATELAprogress
12/08/2023Maintenance informationFRANK QUATELAenergy_progress
12/08/2023HVAC-R and service water heating equipmentFRANK QUATELAenergy_progress
12/08/2023Permanent certificateFRANK QUATELAenergy_progress
12/08/2023HVAC-R and service water piping design and insulationFRANK QUATELAenergy_progress
12/08/2023HVAC-R and service water heating system controlsFRANK QUATELAenergy_progress
12/08/2023Fire-Resistant Penetrations and JointsFRANK QUATELAspecial
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/23/2026Q00974202-I1Request digital key ↗
08/23/2026Q00974202-S1Request digital key ↗
08/23/2026Q00975356-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/23/2026Q00975185-I1Open ↗
08/13/2026Q00974202-I1Open ↗
08/13/2026Q00975356-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/02/2026Q00974202-S1Open ↗
09/02/2026Q00974202-S1Open ↗
08/26/2026Q00975185-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/02/2026Q00974202-S1Open ↗
08/26/2026Q00975185-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/23/2026Q00975185-I1Open ↗
08/13/2026Q00974202-S1Open ↗
08/13/2026Q00974202-I1Open ↗
▸Other Documents1
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026Q00975185-I1Open ↗