HPD12/08/2018§ 27-2005 ADMIN. CODE: REMOVE THE ILLEGAL FASTENING DOUBLE CYLINDER LOCK AT METAL DOOR IN THE ENTRANCE LOCATED AT APT 1STFL, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
HPD12/08/2018§ 27-2005 ADMIN. CODE: REMOVE THE ILLEGAL FASTENING DOUBLE CYLINDER LOCK AT METAL DOOR IN THE ENTRANCE LOCATED AT APT 2NDFL, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
ECB09/20/2017WORK WITHOUT A PERMIT.NOTED AT FRONT OF PREMISES INSTALLED STEEL BALCONY APPROX 5FT X 20FT WIDE X 10FT HIGH WITH 3 STEEL POST AND STAIRS TO GROUND ALSO AT 2ND FLR REMOVED WINDOW AND INSTALLED DOOR.REM:OBTAIN PENothing owed — awaiting certificate of correction
ECB11/20/2013FENCE EXCEEDS PERMITTED HEIGHT. NOTED: AT EXPOSURE #1 (FRONT YARD) ERECTED A 6FT HIGHT PVC/METAL FENCE EXTENDS FROM FRONT OF PREMISES OUT TOPUBLIC SIDEWALK. 6FT FENCE NOT PERMITTED AT FRONT OF PREMISES 4FT FENCNothing owed — awaiting certificate of correction
ECB03/06/2011FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER APPROX 12' I INCH FT OF METAL HANG IN STATE OF DISREPAIR.REM:REPAIR AND/OR REPLACENothing owed — awaiting certificate of correction
ECB06/02/2010WORK W/O A PERMIT WORK NOTED AS FOLLOW AT FRONT OF PREMISES 1 ERECTED AN ALUMINUM CANOPY APPX 9'WX25'L INSTALLED WROUGHT IRON GATE APPX 5'WX5'LX9'H TO ENCLOSE FRONT ENTRANCE DOOR CONSTRUCTED A STEEL DECK APPX 2Nothing owed — awaiting certificate of correction
ECB06/19/2009FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATEOF CORRECTION WITH THE DEPARTMENT OF BUILDINGS- NOTED: ECB VIOLATION 334561471H VIOLATION CONDITION STILL EXIST. REM: FILE CERTIFICATE OF CONothing owed — awaiting certificate of correction
ECB06/19/2009FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT OF BUILDINGS NOTED ECB VIOLATION #34541125R CONDITION STILL EXIST. REMEDY: FILE CERTIFICATE OF CORRECTION FORTHWINothing owed — awaiting certificate of correction
ECB07/15/2008FAILURE TO COMPLY WITH COMM'S ORDER TO FILE COFC FOR VIOLATION 3456147H FOR INSTALLING METAL BALCONY,DOOR & CAR PORT WITHOUT A PERMIT.REMEDYFILE COFCNothing owed — awaiting certificate of correction
ECB02/25/2008FAILURE TO COMPLY W/ COMMISSIONERS ORDER TO CORRECT VIO#3456147H FOR WORK W/O PERMIT INSTALLED 2ND FLR METAL BALCONY & DOOR & CARPORT & ALL CONDITIONS NOTED ON VIOLATION NO RECORDS OF CORRECTION. REMEDY: COMPLYNothing owed — awaiting certificate of correction
ECB10/17/2007FAILURE TO COMPLY W/ AN ORDER OF THE COMMISSIONER TO CORRECT THE CONDITION IN NOTICE OF VIO. #34561471H ( WORK W/O A PERMIT - INSTALLED METAL BALCONY, INSTALLED DOOR 2ND FL & CARPORT ON 1ST FL) NO RECORD OFNothing owed — awaiting certificate of correction
ECB06/15/2007FAILURE TO COMPLY W/THE COMMISSIONER'S ORDER TO OBTAIN A PERMIT PER VIOLATION#34561471H.STEEL/W/POST BALCONY & STAIRS.REMEDY:COMPLY W/THE ORDER.Nothing owed — awaiting certificate of correction
ECB02/22/2007WORK W/O A PERMIT.WORK NOTED:AT FRONT PREMISES INSTALLED STEEL BALCONYAPPROX 5'FT LONG,20'FT WIDE,10'FT HIGH W/3 STREET PIPE POST.3"& W/STAIRS TO GROUND.ALSO AT FRONT 2ND FL REMOVED WINDOW & INSTALLED STEEL DR.Nothing owed — awaiting certificate of correction
ECB10/20/2006WORK W/O A PERMIT. WORK NOTED:AT REAR ERECTED A WOOD FRAME EXTENSION OF GARAGE APPROX 10' X 10'.REMEDY:OBTAIN PERMIT OR RESTORE TO PRIOR LEGAL CONDITION.Nothing owed — awaiting certificate of correction
Two family converted from one family · 2,000 sf lot · 0.68 FAR built · Flood zone X