One family attached or semi-detached
24-28 88 STREET
QUEENS · East Elmhurst · BIN 4024104
💬 Discuss this project
1940Year Built
2Stories
A5Building Class
R3-2Zoning
1,224 sfGross Floor Area
1Units
One family attached or semi-detached · 1,800 sf lot · 0.68 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalPlumbingGeneral
Cellar2p · 1 filing
Sub-Basement2p · 1 filing
Filed — no permit issued3p · 1 filing · 3 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MCCRAY ARCHITECT P.C.408/12/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KCM PLUMBING & HEATING COPlumbing107/08/2026
Building Lifecycle
All (11)Filed (4)Permit Issued (1)Inspection (5)Special Inspection (1)
08/16/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/12/2022
Filed — Alteration
REPAIR FLOOD DAMAGE CAUSED BY HURRICANE IDA. REPLACE SHOWER, TOILET AND SINK IN EXISTING 3 FIXTURE BATHROOM IN THE BASEMENT.
Q00659962-P2
06/17/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/26/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/18/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/18/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/25/2022
Permit issued — Plumbing
Q00659962-I1-PL
01/31/2022
Filed — Alteration
REPAIR FLOOD DAMAGE CAUSED BY HURRICANE IDA. REPLACE SHOWER, TOILET AND SINK IN EXISTING 3 FIXTURE BATHROOM IN THE BASEMENT.
Q00659962-P1
01/10/2022
Filed — Alteration
INTERIOR ALTERATIONS TO REAPIR FLOOD DAMAGE IN BASEMENT CAUSED BY HURRICANE IDA. REPLACE WD. STAIRS, NON-BEARING PARTITIONS, CEILINGS, WINDOW, DOORS AND FRAMES, WALL AND FLOOR FINISHES. NO CHANGES TO BUILDINGS USE, HEIGHT OR EGRESS.
Q00659935-I1
01/10/2022
Filed — Alteration
REPAIR FLOOD DAMAGE CAUSED BY HURRICANE IDA. REPLACE SHOWER, TOILET AND SINK IN EXISTING 3 FIXTURE BATHROOM IN THE BASEMENT.
Q00659962-I1
01/10/2022
Special inspection requirement — Final
Kevin McCray
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offKCM PLUMBING & HEATING CO03/25/2022
1 project · most recent 08/12/2022
Gas Water/Sanitary
FiledStatusContractorScope
08/12/2022Signed-offKCM PLUMBING & HEATING COGas, Water/Sanitary
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
08/16/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/17/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/26/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/18/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/18/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
01/10/2022FinalKevin McCrayprogress
▾Documents — 3 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/26/2026Q00659935-I1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/26/2026Q00659935-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/26/2026Q00659935-I1Open ↗