← Back
Zoned residential, not Manhattan
24 28 AVENUE
BROOKLYN · BIN 3186973
💬 Discuss this project
0Year Built
—Stories
V0Building Class
R5Zoning
0 sfGross Floor Area
0Units
Zoned residential, not Manhattan · Owner of record: DYKER ONE LLC · 1,933 sf lot · 0 FAR built · Flood zone X500
Locations of Work
ArchitectureStructural
Bulkhead1p · 1 filing · 5 docs
Floor 11p · 1 filing · 5 docs
Cellar1p · 1 filing · 5 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/28/2024$438K—Private party → DYKER ONE LLC— not available
07/06/2017$350K—Private party → Private party— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TIMES BUILDINGS ENGINEERING SERVICE106/15/2024
JIAN ENGINEERING PLLC110/12/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MEIYUN CHEN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GOLDEN TIME CONTRACTING IGeneral Contractor407/08/2026
GLORY R CONSTRUCTION INCGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JIAN ENGINEERING PLLC7397210/12/2023
Building Lifecycle
All (20)Filed (3)Permit Issued (3)Signed Off (2)Special Inspection (12)
08/26/2025
Signed off — Alteration
B01063689-I1
11/14/2024
Signed off — Full Demolition
B01062853-I1
11/04/2024
Permit issued — Full Demolition
B01062853-I1-FD
09/27/2024
Permit issued — Construction Fence
B01063689-I1-FN
09/26/2024
Permit issued — Construction Fence
B01063689-I1-FN
06/29/2024
Filed — Full Demolition
B01062853-I1
06/15/2024
Filed — Alteration
B01063689-I1
10/12/2023
Filed — Alteration
FILING FOR EXCAVATION, FOOTING, FOUNDATION & STRUCTURAL WORK ON CELLAR, 1ST TO 4TH FLOOR, ROOF. IN CONJUNCTION WITH CO APPLICATION JOB.
B00862063-I1
04/19/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
04/19/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
JIAN DENG
04/19/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
JIAN DENG
04/19/2023
Special inspection requirement — Masonry
JIAN DENG
04/19/2023
Special inspection requirement — Sprayed fire-resistant materials
JIAN DENG
04/19/2023
Special inspection requirement — Structural Cold-Formed Steel
JIAN DENG
04/19/2023
Special inspection requirement — Structural Steel - Details
JIAN DENG
04/19/2023
Special inspection requirement — Structural Steel - High Strength Bolting
JIAN DENG
04/19/2023
Special inspection requirement — Structural Steel - Welding
JIAN DENG
04/19/2023
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
JIAN DENG
04/19/2023
Special inspection requirement — Final
JIAN DENG
04/19/2023
Special inspection requirement — Footing and Foundation
JIAN DENG
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFull DemolitionSigned-offGOLDEN TIME CONTRACTING I11/04/2024
DOB NOWConstruction FenceSigned-offGOLDEN TIME CONTRACTING I09/27/2024
DOB NOWConstruction FenceSigned-offGLORY R CONSTRUCTION INC09/26/2024
1 project · most recent 10/12/2023
Steel
FiledStatusContractorScope
10/12/2023——Steel
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
04/19/2023Subsurface Investigations (Borings/Test Pits)—special
04/19/2023Structural Stability – Alterations of existing buildingsJIAN DENGspecial
04/19/2023Excavations - Sheeting, Shoring, and BracingJIAN DENGspecial
04/19/2023MasonryJIAN DENGspecial
04/19/2023Sprayed fire-resistant materialsJIAN DENGspecial
04/19/2023Structural Cold-Formed SteelJIAN DENGspecial
04/19/2023Structural Steel - DetailsJIAN DENGspecial
04/19/2023Structural Steel - High Strength BoltingJIAN DENGspecial
04/19/2023Structural Steel - WeldingJIAN DENGspecial
04/19/2023Subsurface Conditions – Fill Placement & In-Place DensityJIAN DENGspecial
04/19/2023FinalJIAN DENGprogress
04/19/2023Footing and FoundationJIAN DENGprogress
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/26/2026B00862063-I1Request digital key ↗
08/24/2026B01063689-I1Request digital key ↗
08/24/2026B01062853-I1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/24/2026B01063689-I1Open ↗
08/13/2026B00862063-I1Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWSewer Cut-Off1
08/13/2026B01062853-I1Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026B01062853-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026B01062853-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026B01062853-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/24/2026B01062853-I1Open ↗
▸DOB NOWRodent Control1
08/13/2026B01062853-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00862063-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026B00862063-I1Open ↗
▸Other Documents5
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B00862063-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026B01062853-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/24/2026B01062853-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026B01062853-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026B01062853-I1Open ↗