← Back
BuildNYC
Limited service hotel, often national chain
24-38 STEINWAY STREET
QUEENS · BIN 4605306
💬 Discuss this project
2018Year Built
6Stories
H3Building Class
C4-2AZoning
14,236 sfGross Floor Area
1Units
3 Active Violations 2 unresolved · 1 paperwork only 3 likely answered ▸FDNY Report ↗
Limited service hotel, often national chain · Owner of record: GBV Steinway Realty · 4,750 sf lot · 3 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofBZ Development Group Inc11p · 3 filings · 20 docs
BulkheadArch 31 LLC2p · 2 filings · 20 docs
Floor 6BZ Development Group Inc8p · 3 filings · 20 docs
Floor 5BZ Development Group Inc8p · 3 filings · 20 docs
Floor 4BZ Development Group Inc8p · 3 filings · 20 docs
Floor 3BZ Development Group Inc8p · 3 filings · 20 docs
Floor 2BZ Development Group Inc7p · 2 filings · 20 docs
Floor 1BZ Development Group Inc30p · 5 filings · 20 docs
CellarArch 31 LLC7p · 3 filings · 20 docs
Sub-BasementBZ Development Group Inc2p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Arch 311507/08/2026
Prince Club1503/21/2026
C.H. 41503/22/2026
GBV Steinway Realty103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/21/2023$10.7M—PRINCE CLUB LLC → GBV STEINWAY REALTY LLC$5,336/sf building
05/14/2015$2.7M—— → —$1,360/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Elevated Engineering106/12/2023
Tan Architect111/10/2020
CNY Engineering410/09/2020
Haider Engineering, P.E405/22/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Construction Permit Services203/21/2026
Haider Engineering, P.E403/21/2026
Haider Engineering P E403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HKS ConstructionScaffold607/08/2026
Ye's National ConstructionGeneral Contractor407/08/2026
J.A. Lee Electricspecialty_contractor203/21/2026
RRP PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Elevated Engineering3692106/12/2023
Architectural Concept3642310/09/2020
Building Lifecycle
All (100)Filed (10)Permit Issued (8)Signed Off (6)Violation (32)Objection (24)Special Inspection (20)
05/11/2026
Violation issued (HPD, open)
A
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/22/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/01/2024
Violation issued (ECB, open)
Construction
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/20/2023
Signed off — Alteration
Installation of new DISH site. Install 3 sectors (3 antennas), 6 RRH units, 1 GPS unit, and a platform with equipment cabinet on the roof. Related conduit run from basement through 1-6 to roof.
Q00843729-I1
07/07/2023
Permit issued — Antenna
Q00843729-I1-AN
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/26/2023
Objection resolved — Addressed
06/26/2023
Objection resolved — Addressed
06/26/2023
Objection resolved — Addressed
06/26/2023
Objection resolved — Addressed
06/26/2023
Objection resolved — Addressed
06/20/2023
Objection raised — Zoning
06/20/2023
Objection raised — Inspections
06/20/2023
Objection raised — Zoning
06/20/2023
Objection raised — Fire_Protection
06/20/2023
Objection raised — Structural
06/12/2023
Filed — Alteration
Installation of new DISH site. Install 3 sectors (3 antennas), 6 RRH units, 1 GPS unit, and a platform with equipment cabinet on the roof. Related conduit run from basement through 1-6 to roof.
Q00843729-I1
11/24/2021
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD FOR NEW BUILDING AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q00104807-I1
11/15/2021
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q00092347-I1
10/27/2021
Signed off — Alteration
INSTALLATION OF NEW 10'-0" CURB CUT INCLUDE (2) 2'-6" SPLAYS. .REFER TO DRAWING
Q00423160-I1
02/10/2021
Signed off — Alteration
INSTALL NEW HVAC SYSTEM IN NEW BUILDING IN CONJUNCTION WITH NB#421198821. NO CHANGE IN USE,EGRESS AND OCCUPANCY.
Q00225659-I1
01/12/2021
Signed off — Alteration
INSTALL NEW BOILER IN NEW BUILDING IN CONJUNCTION WITH NB#421198821. NO CHANGE IN USE,EGRESS AND OCCUPANCY.
Q00229801-I1
01/08/2021
Permit issued — Curb Cut
Q00423160-I1-CC
01/07/2021
Permit issued — Mechanical Systems
Q00225659-I1-MS
11/13/2020
Objection raised — Scope
11/13/2020
Objection resolved — Addressed
11/10/2020
Filed — Alteration
INSTALLATION OF NEW 10'-0" CURB CUT INCLUDE (2) 2'-6" SPLAYS. .REFER TO DRAWING
Q00423160-I1
10/19/2020
Objection resolved — Addressed
10/16/2020
Objection resolved — Addressed
10/15/2020
Objection raised — Mechanical
10/15/2020
Objection raised — Fire_Protection
10/15/2020
Special inspection requirement — Heating Systems
MUZAFFAR JAMAL
10/15/2020
Special inspection requirement — Maintenance information
MUZAFFAR JAMAL
10/15/2020
Special inspection requirement — HVAC and service water heating system controls
MUZAFFAR JAMAL
10/15/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
MUZAFFAR JAMAL
10/15/2020
Special inspection requirement — HVAC and service water heating equipment
MUZAFFAR JAMAL
10/09/2020
Filed — Alteration
INSTALL NEW BOILER IN NEW BUILDING IN CONJUNCTION WITH NB#421198821. NO CHANGE IN USE,EGRESS AND OCCUPANCY.
Q00229801-S2
10/09/2020
Filed — Alteration
INSTALL NEW BOILER IN NEW BUILDING IN CONJUNCTION WITH NB#421198821. NO CHANGE IN USE,EGRESS AND OCCUPANCY.
Q00229801-P1
10/09/2020
Special inspection requirement — HVAC and service water heating system controls
10/09/2020
Special inspection requirement — Maintenance information
10/09/2020
Special inspection requirement — HVAC and service water heating equipment
07/08/2020
Permit issued — Boiler Equipment
Q00229801-I1-BE
04/08/2020
Objection raised — Zoning
04/08/2020
Objection resolved — Addressed
04/08/2020
Objection raised — Scope
04/08/2020
Objection resolved — Addressed
04/08/2020
Objection raised — Other
04/08/2020
Objection resolved — Addressed
04/08/2020
Objection raised — Admin
04/08/2020
Objection resolved — Addressed
04/06/2020
Filed — Alteration
INSTALL NEW HVAC SYSTEM IN NEW BUILDING IN CONJUNCTION WITH NB#421198821. NO CHANGE IN USE,EGRESS AND OCCUPANCY.
Q00225659-I1
04/03/2020
Filed — Alteration
INSTALL NEW BOILER IN NEW BUILDING IN CONJUNCTION WITH NB#421198821. NO CHANGE IN USE,EGRESS AND OCCUPANCY.
Q00229801-I1
04/03/2020
Special inspection requirement — Maintenance information
MUZAFFAR JAMAL
04/03/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
MUZAFFAR JAMAL
04/03/2020
Special inspection requirement — Fire-Resistance Rated Construction
MUZAFFAR JAMAL
04/03/2020
Special inspection requirement — Electrical motors
MUZAFFAR JAMAL
11/04/2019
Violation issued (ECB, closed)
Unknown
11/04/2019
Violation issued (ECB, closed)
Construction
Latest 60 of 100 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWAntennaSigned-offMic General Contracting07/07/2023
DOB NOWCurb CutSigned-offYe's National Construction01/08/2021
DOB NOWMechanical SystemsSigned-offYe's National Construction01/07/2021
DOB NOWBoiler EquipmentSigned-offRRP Plumbing07/08/2020
DOB NOWSidewalk ShedSigned-offHKS Construction03/19/2019
DOB NOWSupported ScaffoldSigned-offHKS Construction03/19/2019
DOB NOWSupported ScaffoldSigned-offHKS Construction12/07/2018
DOB NOWSidewalk ShedSigned-offHKS Construction10/26/2018
BIS—ISSUEDYe's National Construction03/04/2021
BISPLISSUEDRRP Plumbing08/31/2020
BIS—ISSUEDYe's National Construction11/01/2019
BISEQISSUEDYe's National Construction09/12/2019
BIS—ISSUEDYe's National Construction12/21/2018
BISPLISSUEDRRP Plumbing09/10/2018
BIS—ISSUEDYe's National Construction05/31/2018
BIS—ISSUEDYe's National Construction05/18/2018
BISEQISSUEDYe's National Construction05/18/2018
6 projects · most recent 07/21/2023
General Wiring
FiledStatusContractorScope
07/21/2023Permit IssuedRedgrave Electl Maintnce2 meters, 1 new_meters
01/06/2021CompleteHV ElectricGeneral Wiring
11/09/2020CompleteHV ElectricGeneral Wiring
12/28/2018CompleteKJK Electric—
12/17/2018CompleteHV ElectricGeneral Wiring
10/24/2018CompleteRichard Neu—
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
10/15/2020Heating SystemsMUZAFFAR JAMALspecial
10/15/2020Maintenance informationMUZAFFAR JAMALenergy_progress
10/15/2020HVAC and service water heating system controls MUZAFFAR JAMALenergy_progress
10/15/2020Fire-Resistant Penetrations and JointsMUZAFFAR JAMALspecial
10/15/2020HVAC and service water heating equipment MUZAFFAR JAMALenergy_progress
10/09/2020HVAC and service water heating system controls —energy_progress
10/09/2020Maintenance information—energy_progress
10/09/2020HVAC and service water heating equipment —energy_progress
04/03/2020Maintenance informationMUZAFFAR JAMALenergy_progress
04/03/2020Fire-Resistant Penetrations and JointsMUZAFFAR JAMALspecial
04/03/2020Fire-Resistance Rated ConstructionMUZAFFAR JAMALprogress
04/03/2020Electrical motorsMUZAFFAR JAMALenergy_progress
09/10/2019Mechanical SystemsMUZAFFAR JAMALspecial
09/10/2019Shutoff dampersMUZAFFAR JAMALenergy_progress
09/10/2019HVAC and service water heating system controls MUZAFFAR JAMALenergy_progress
09/10/2019HVAC insulation and sealing MUZAFFAR JAMALenergy_progress
09/10/2019HVAC and service water heating equipment MUZAFFAR JAMALenergy_progress
09/10/2019Energy Code Compliance InspectionsMUZAFFAR JAMALprogress
09/10/2019FinalMUZAFFAR JAMALprogress
09/10/2019Heating SystemsMUZAFFAR JAMALspecial
▾Documents — 178 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch - Supported Scaffold3
08/28/2026Q00104807-I1Request digital key ↗
08/15/2026Q00104807-P2Request digital key ↗
08/15/2026Q00104807-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment3
08/28/2026Q00229801-I1Request digital key ↗
08/28/2026Q00229801-P1Request digital key ↗
08/15/2026Q00229801-S2Request digital key ↗
▸DOB NOWPlans/Sketch3
08/28/2026Q00092347-I1Request digital key ↗
08/28/2026Q00104807-I1Request digital key ↗
08/24/2026Q00843729-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/15/2026Q00225659-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/14/2026Q00423160-I1Request digital key ↗
▸Applications & Permits37
▸BISPLAN / WORK APPROVAL APPLICATION33
10/24/2025421537055Open ↗
11/08/2021421198821Open ↗
09/30/2021420529039Open ↗
Showing 3 of 33 on file for this type
▸BISWORK PERMIT APPLICATION3
10/22/2020421198821Open ↗
10/23/2018421198821Open ↗
06/05/2018421198821Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
09/11/2020421198821Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
08/30/2021421198821Open ↗
▸BISZONING DIAGRAM1
04/18/2018421198821Open ↗
▸Seals & Professional Certifications39
▸DOB NOWProgress Inspector Seal & Signature12
08/29/2026Q00225659-I1Open ↗
08/29/2026Q00225659-I1Open ↗
08/29/2026Q00225659-I1Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
06/05/2018421198821Open ↗
05/31/2018421198821Open ↗
05/31/2018421198821Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/28/2026Q00092347-I1Open ↗
08/28/2026Q00104807-P1Open ↗
08/28/2026Q00104807-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/29/2026Q00225659-I1Open ↗
08/29/2026Q00225659-I1Open ↗
08/29/2026Q00225659-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
02/03/2012420529039Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
02/03/2012420529039Open ↗
▸Trade Schedules & Equipment10
▸BISSCHEDULE B - PLUMBING7
03/12/2021421198821Open ↗
01/06/2021421198821Open ↗
12/08/2020421198821Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
02/02/2018421198821Open ↗
09/16/2015421198821Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
01/25/2021421601083Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST1
09/16/2015421198821Open ↗
▸BISSTREET TREE SIGNOFF1
01/04/2021421198821Open ↗
▸BISSTREET TREES SITE PLAN1
06/05/2018421198821Open ↗
▸Environmental & Asbestos7
▸DOB NOWOER: Notice to Proceed4
08/13/2026Q00225659-I1Open ↗
08/13/2026Q00229801-I1Open ↗
08/13/2026Q00104807-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWOER: Notice of Satisfaction2
08/13/2026Q00229801-I1Open ↗
08/13/2026Q00225659-I1Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
01/04/2021421198821Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
06/05/2018421198821Open ↗
05/31/2018421198821Open ↗
05/10/2018421198821Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
08/18/2021421198821Open ↗
08/13/2021421198821Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00225659-I1Open ↗
08/13/2026Q00229801-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026Q00225659-I1Open ↗
08/13/2026Q00229801-I1Open ↗
▸BISTR8 INSPECTOR TO CONFIRM AS-BUILT VALUES1
01/04/2021421198821Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
08/30/2021421198821Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY3
08/18/2021421198821Open ↗
08/13/2021421198821Open ↗
01/12/2021421198821Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
05/31/2018421198821Open ↗
05/31/2018421198821Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
08/30/2021421198821Open ↗
05/31/2018421198821Open ↗
▸Approvals, Objections & Sign-offs17
▸BISLETTERS - SUPPORTING DOCUMENTATION6
09/30/2021420529039Open ↗
09/30/2021420529039Open ↗
01/15/2021421198821Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE5
11/08/2021421198821Open ↗
01/04/2021421198821Open ↗
04/12/2018421198821Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
10/27/2020421252138Open ↗
01/05/2016421252138Open ↗
09/16/2015421198821Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY1
11/10/2021421198821Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
04/01/2021421601083Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
03/18/2021421198821Open ↗
08/09/2017421537055Open ↗
02/03/2012420529039Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
06/05/2018421198821Open ↗
▸Filing & Intake Forms23
▸BISADDITIONAL INFORMATION11
02/03/2021421198821Open ↗
01/15/2021421198821Open ↗
01/15/2021421198821Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING COVER SHEET7
02/12/2018421601083Open ↗
02/02/2018421198821Open ↗
08/09/2017421537055Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM4
09/30/2021420529039Open ↗
10/22/2020421198821Open ↗
09/12/2018421198821Open ↗
Showing 3 of 4 on file for this type
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
01/05/2016421252138Open ↗
▸Other Documents6
▸BISRESTRICTION: DEED1
09/30/2021420529039Open ↗
▸BIS* ENVIRONMENTAL 'E' DEP NOTICE TO PROCEED1
10/28/2014420529039Open ↗
▸BISPLOT DIAGRAM1
09/16/2015421198821Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
10/27/2020421252138Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
04/01/2021421601083Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/28/2026Q00092347-I1Open ↗