← Back
One story - permanent living quarter
24-39 LITTLE NECK BLVD
QUEENS · Bay Terrace-Clearview · BIN 4133699
💬 Discuss this project
1960Year Built
1Stories
A2Building Class
R1-2Zoning
2,180 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One story - permanent living quarter · 9,472 sf lot · 0.23 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NONSTOP CONSTRUCTION103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/16/2021$1.7M—Private party → Private party$789/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PAUL CHRISTAKOS ARCHITECTURE104/20/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ARGON ELECTRICAL CORPElectrical103/22/2026
ISLAND ELECTRIC CORPElectrical103/22/2026
NONSTOP CONSTRUCTION INCGeneral Contractor107/08/2026
Building Lifecycle
All (10)Filed (1)Permit Issued (1)Signed Off (1)Violation (1)Special Inspection (6)
08/09/2021
Signed off — Alteration
REPAIR EXISTING CONCRETE SLAB-ON-GRADE, REPLACE DAMAGES WALKWAY, REPLACEMENT OF WINDOWS AND PATIO DOORS.
Q00501601-I1
04/28/2021
Permit issued — General Construction
Q00501601-I1-GC
04/20/2021
Filed — Alteration
REPAIR EXISTING CONCRETE SLAB-ON-GRADE, REPLACE DAMAGES WALKWAY, REPLACEMENT OF WINDOWS AND PATIO DOORS.
Q00501601-I1
04/15/2021
Special inspection requirement — Fenestration areas
Paul Christakos
04/15/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
Paul Christakos
04/15/2021
Special inspection requirement — Fenestration air leakage
Paul Christakos
04/15/2021
Special inspection requirement — Air barrier - visual inspection
Paul Christakos
04/14/2021
Special inspection requirement — Final
Paul Christakos
04/14/2021
Special inspection requirement — Energy Code Compliance Inspections
Paul Christakos
04/18/2020
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offNONSTOP CONSTRUCTION INC04/28/2021
BISOTISSUEDPRO CUSTOM SOLAR LLC01/25/2022
BISOTISSUEDSIRAK CONSTRUCTION CORP09/04/2019
2 projects · most recent 04/06/2022
FiledStatusContractorScope
04/06/2022CompleteISLAND ELECTRIC CORP—
03/12/2021CompleteARGON ELECTRICAL CORP—
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
04/15/2021Fenestration areasPaul Christakosenergy_progress
04/15/2021Fenestration and door U-factor and product ratingsPaul Christakosenergy_progress
04/15/2021Fenestration air leakagePaul Christakosenergy_progress
04/15/2021Air barrier - visual inspectionPaul Christakosenergy_progress
04/14/2021FinalPaul Christakosprogress
04/14/2021Energy Code Compliance InspectionsPaul Christakosprogress
▾Documents — 53 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/27/2026Q00501601-I1Request digital key ↗
▸Applications & Permits9
▸BISPLAN / WORK APPROVAL APPLICATION7
11/14/2022440702768Open ↗
01/19/2022440702768Open ↗
08/13/2020421736802Open ↗
Showing 3 of 7 on file for this type
▸BISWORK PERMIT APPLICATION2
01/25/2022440702768Open ↗
09/06/2019421736802Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISFLOOD ZONE DESIGN CERTIFICATION1
01/19/2022440702768Open ↗
▸Seals & Professional Certifications12
▸DOB NOWProgress Inspector Seal & Signature6
08/24/2026Q00501601-I1Open ↗
08/24/2026Q00501601-I1Open ↗
08/24/2026Q00501601-I1Open ↗
Showing 3 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
01/19/2022440702768Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
08/20/2019421736802Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/19/2022440702768Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
08/20/2019421736802Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/20/2019421736802Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026Q00501601-I1Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
08/20/2019421736802Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/19/2022440702768Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q00501601-I1Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
12/21/2022440702768Open ↗
01/19/2022440702768Open ↗
09/03/2020421736802Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
12/21/2022440702768Open ↗
09/03/2020421736802Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
12/21/2022440702768Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
08/20/2019421736802Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
01/19/2022440702768Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
01/19/2022440702768Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00501601-I1Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
12/21/2022440702768Open ↗
01/19/2022440702768Open ↗
09/03/2020421736802Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
12/27/2022440702768Open ↗
09/03/2020421736802Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
12/27/2022440702768Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
12/21/2022440702768Open ↗
01/19/2022440702768Open ↗
09/03/2020421736802Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION4
11/28/2022440702768Open ↗
08/13/2020421736802Open ↗
08/03/2020421736802Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
01/19/2022440702768Open ↗
▸BISEFILING COVER SHEET1
08/20/2019421736802Open ↗
▸Other Documents1
▸BISSUBSTANTIAL IMPROVEMENT CALCULATIONS1
01/19/2022440702768Open ↗