← Back
Walk-up cooperative
24-51 38 STREET
QUEENS · BIN 4010263
💬 Discuss this project
1929Year Built
4Stories
C6Building Class
R6BZoning
29,328 sfGross Floor Area
44Units
LL97 CoveredRent Stabilized12 Open Violations ▸
Walk-up cooperative · Owner of record: 38 ASTORIA OWNERS CORP · 11,780 sf lot · 2.49 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Roof1p · 1 filing · 6 docs
Floor 31p · 1 filing · 10 docs
Floor 22p · 1 filing · 13 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DOUGLASTON REALTY MANAGEMENT1007/08/2026
ONEVESTA PROPERTY MANAGEMENT507/08/2026
BEST NY CONTRACTING703/22/2026
38 ASTORIA OWNERS703/22/2026
SAMOS CONSTRUCTION103/22/2026
DOUG REALTY MGMT4503/21/2026
38 STREET ASTORIA OWNERS CORP.403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FL&M ENGINEERING DESIGN &INSPECTION107/22/2024
RICHARD KOENIGSBERG107/15/2024
ATELIER NY ARCHITECTURE607/20/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ATELIER NEW YORK ARCHITECTURE603/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
THE GREEN STUDIO103/21/2026
SMN CONSULTING SERVICES203/21/2026
MILLENNIUM DESIGNS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BEST NY CONTRACTING INCGeneral Contractor407/08/2026
HERCULES HOME IMPROVEMENTGeneral Contractor303/21/2026
ARANDA PLBG & HTG CORPPlumbing207/08/2026
USA ELECT'L SERVICES CORPElectrical103/22/2026
ARANDA, MANUELFire Protection103/21/2026
JP & SON ELECTRIC CORPElectrical103/22/2026
MIKE CATSIMALIS PLBG&HTGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KOENIGSBERG ENGINEERING,2247107/15/2024
SANDEEP GUNNALA ENGINEERI8482107/15/2024
ATELIER NY ARCHITECTURE2438207/20/2022
Building Lifecycle
All (18)Filed (9)Permit Issued (7)Signed Off (2)
08/19/2024
Permit issued — General Construction
Q01071962-I1-GC
08/09/2024
Permit issued — Suspended Scaffold
Q01085664-I1-SC
07/30/2024
Filed — Alteration
Suspended Scaffold out rigger system for Facade repairs.
Q01085664-I1
07/22/2024
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01082548-I1
07/22/2024
Permit issued — Sidewalk Shed
Q01082548-I1-SH
07/15/2024
Filed — Alteration
FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
Q01071962-I1
04/24/2023
Signed off — Alteration
PLUMBING FILED FOR APT C1. PLUMBING WORK AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00608428-I1
04/24/2023
Signed off — Alteration
INTERIOR RENOVATION OF APARTMENT C1. PARTITION CHANGES TONON-LOAD-BEARING WALLS AS PER PLANS. NO CHANGE IN USE,OCCUPANCY OR EGRESS.
Q00608427-I1
07/20/2022
Filed — Alteration
INTERIOR RENOVATION OF APARTMENT C1. PARTITION CHANGES TONON-LOAD-BEARING WALLS AS PER PLANS. NO CHANGE IN USE,OCCUPANCY OR EGRESS.
Q00608427-P1
07/20/2022
Filed — Alteration
PLUMBING FILED FOR APT C1. PLUMBING WORK AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00608428-P1
03/14/2022
Permit issued — Plumbing
Q00608428-I1-PL
02/10/2022
Permit issued — General Construction
Q00608427-I1-GC
11/23/2021
Filed — Alteration
PLUMBING FILED FOR APT C1. PLUMBING WORK AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00608428-I1
11/23/2021
Filed — Alteration
INTERIOR RENOVATION OF APARTMENT C1. PARTITION CHANGES TONON-LOAD-BEARING WALLS AS PER PLANS. NO CHANGE IN USE,OCCUPANCY OR EGRESS.
Q00608427-I1
04/09/2021
Permit issued — Plumbing
Q00221632-I1-PL
03/24/2021
Filed — Alteration
INTERIOR RENOVATION OF APARTMENT B2. MINOR PLUMBING WORK AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS
Q00221632-P1
10/09/2019
Permit issued — Plumbing
Q00221632-I1-PL
10/08/2019
Filed — Alteration
INTERIOR RENOVATION OF APARTMENT B2. MINOR PLUMBING WORK AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS
Q00221632-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedBEST NY CONTRACTING INC08/19/2024
DOB NOWSuspended ScaffoldPermit IssuedEMPAC CONTRACTING CORP08/09/2024
DOB NOWSidewalk ShedPermit IssuedBEST NY CONTRACTING INC07/22/2024
DOB NOWPlumbingSigned-offMIKE CATSIMALIS PLBG&HTG03/14/2022
DOB NOWGeneral ConstructionSigned-offHERCULES HOME IMPROVEMENT02/10/2022
DOB NOWPlumbingPermit IssuedARANDA PLBG & HTG CORP04/09/2021
DOB NOWPlumbingPermit IssuedARANDA PLBG & HTG CORP10/09/2019
BISPLISSUEDARANDA PLBG & HTG CORP02/03/2020
BISOTISSUEDVAGGELAS CONSTRUCTION GR*09/25/2019
BISPLISSUEDARANDA PLBG & HTG CORP06/04/2019
BISPLISSUEDARANDA PLBG & HTG CORP05/29/2019
BISPLISSUEDARANDA PLBG & HTG CORP05/29/2019
BISPLISSUEDARANDA PLBG & HTG CORP05/29/2019
BISOTISSUEDVAGGELAS CONSTRUCTION GR*05/28/2019
BISOTISSUEDVAGGELAS CONSTRUCTION GR*05/28/2019
BISOTISSUEDVAGGELAS CONSTRUCTION GR*04/19/2019
BISOTISSUEDVAGGELAS CONSTRUCTION GR*04/17/2019
BISPLISSUEDNEW AMSTERDAM PLBG & HTG04/11/2019
BISPLISSUEDNEW AMSTERDAM PLBG & HTG04/11/2019
BISPLISSUEDNEW AMSTERDAM PLBG & HTG04/10/2019
BISOTISSUEDVAGGELAS CONSTRUCTION GR*04/09/2019
BISOTISSUEDVAGGELAS CONSTRUCTION GR*04/09/2019
BISOTISSUEDVAGGELAS CONSTRUCTION GR*03/04/2019
BISOTISSUEDVAGGELAS CONSTRUCTION GR*02/08/2019
BISOTISSUEDVAGGELAS CONSTRUCTION GR*02/08/2019
BISPLISSUEDT.N.T. PLBG & HTG, INC05/09/2017
BISOTISSUEDSAMOS CONSTRUCTION INC06/30/2016
BISPLISSUEDFLINT MECHANICAL CORP04/05/2016
BISOTISSUEDREFIT CONSTRUCTION CORP02/26/2016
BISPLISSUEDMARATHON MECHANICAL LLC11/25/2015
BISPLISSUEDFLINT MECHANICAL CORP09/24/2015
BISOTISSUEDMG RENOVATIONS AND HOME I08/26/2015
BISPLISSUEDFLINT MECHANICAL CORP04/13/2015
BISOTISSUEDALPHA CONTRACTING CORP03/23/2015
BISPLISSUEDFLINT MECHANICAL CORP03/18/2015
BISOTISSUEDSAMOS CONSTRUCTION INC03/11/2015
BISOTISSUEDSAMOS CONSTRUCTION INC03/04/2015
BISOTISSUEDSAMOS CONSTRUCTION INC03/04/2015
BISOTISSUEDSAMOS CONSTRUCTION INC03/03/2015
BISOTISSUEDSAMOS CONSTRUCTION INC03/03/2015
+ 17 more permits on file
1 project · most recent 03/24/2021
Gas Water/Sanitary
FiledStatusContractorScope
03/24/2021Permit IssuedARANDA PLBG & HTG CORPGas, Water/Sanitary
11 projects · most recent 02/11/2025
General Wiring
FiledStatusContractorScope
02/11/2025CompleteJP & SON ELECTRIC CORPGeneral Wiring
08/26/2024Permit IssuedHIGH QUALITY ELECTRIC OF—
04/03/2022CompleteA & S MASTER ELEC'L CORPGeneral Wiring
10/07/2020CompleteS. ROMANO ELECTRIC CORPGeneral Wiring
03/10/2020Pending PaymentUSA ELECT'L SERVICES CORPGeneral Wiring
11/15/2019CompleteUSA ELECT'L SERVICES CORPGeneral Wiring
11/15/2019CompleteUSA ELECT'L SERVICES CORPGeneral Wiring
10/11/2019CompleteUSA ELECT'L SERVICES CORPGeneral Wiring
10/01/2019CompleteUSA ELECT'L SERVICES CORPGeneral Wiring
09/26/2019CompleteUSA ELECT'L SERVICES CORPGeneral Wiring
03/05/2019CompleteUSA ELECT'L SERVICES CORPGeneral Wiring
1 project · most recent 07/22/2024
Sidewalk Shed
FiledStatusContractorScope
07/22/2024Permit IssuedBEST NY CONTRACTING INCSidewalk Shed
1 project · most recent 07/30/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
07/30/2024Permit Issued—Suspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
03/25/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/02/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/11/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/11/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
06/25/2024Energy Code Compliance InspectionsRICHARD KOENIGSBERGprogress
06/25/2024Post-installed AnchorsRICHARD KOENIGSBERGspecial
06/25/2024Structural Stability – Alterations of existing buildingsRICHARD KOENIGSBERGspecial
06/25/2024Tenant Protection Plan ComplianceSandeep Gunnalaspecial
06/25/2024FinalRICHARD KOENIGSBERGprogress
06/25/2024MasonryRICHARD KOENIGSBERGspecial
07/21/2022FinalAnatole Plotkinprogress
07/21/2022Energy Code Compliance InspectionsAnatole Plotkinprogress
07/21/2022Lighting in dwelling unitsAnatole Plotkinenergy_progress
07/21/2022Fire-Resistant Penetrations and JointsAnatole Plotkinspecial
▾Documents — 762 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch6
08/26/2026Q00608428-P1Request digital key ↗
08/26/2026Q00608428-I1Request digital key ↗
08/26/2026Q00608427-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
08/28/2026Q00221632-I1Request digital key ↗
08/28/2026Q00221632-P1Request digital key ↗
08/15/2026Q00221632-P2Request digital key ↗
▸Applications & Permits151
▸BISPLAN / WORK APPROVAL APPLICATION76
12/06/2021421044275Open ↗
10/05/2021421044275Open ↗
09/28/2021421044275Open ↗
Showing 3 of 76 on file for this type
▸BISWORK PERMIT APPLICATION75
02/04/2020440549113Open ↗
09/25/2019440567110Open ↗
09/24/2019440567110Open ↗
Showing 3 of 75 on file for this type
▸Seals & Professional Certifications144
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION45
03/13/2020440543306Open ↗
01/30/2020440542021Open ↗
01/30/2020440543707Open ↗
Showing 3 of 45 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT25
09/24/2019440567110Open ↗
05/24/2019440549113Open ↗
05/24/2019440549097Open ↗
Showing 3 of 25 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION22
09/24/2019440567110Open ↗
05/24/2019440549113Open ↗
05/24/2019440549097Open ↗
Showing 3 of 22 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY22
09/24/2019440567110Open ↗
05/24/2019440549113Open ↗
05/24/2019440549097Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/28/2026Q00221632-I1Open ↗
08/28/2026Q00221632-P1Open ↗
08/28/2026Q00221632-P2Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/13/2026Q00608427-I1Open ↗
09/01/2026Q01071962-I1Open ↗
09/01/2026Q01071962-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/13/2026Q00608427-I1Open ↗
09/13/2026Q00608427-I1Open ↗
09/01/2026Q01071962-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPC FULL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment85
▸BISSELF-CERT PLUMBING NOTICE33
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 33 on file for this type
▸BISSCHEDULE B - PLUMBING26
09/15/2021440542030Open ↗
10/26/2020440549113Open ↗
10/16/2020440549113Open ↗
Showing 3 of 26 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE21
12/30/2019440549113Open ↗
12/19/2019440549113Open ↗
12/04/2019440549113Open ↗
Showing 3 of 21 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISBOILER APPROVAL : 900A1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection14
▸BISTENANT PROTECTION PLAN AND NOTES11
09/24/2019440567110Open ↗
05/24/2019440549113Open ↗
05/24/2019440549097Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWTenant Protection Plan3
08/13/2026Q00221632-P2Open ↗
08/13/2026Q00221632-P1Open ↗
08/13/2026Q00221632-I1Open ↗
▸Environmental & Asbestos38
▸BISASBESTOS: CERTIFICATION (DEP ACP5)27
09/24/2019440567110Open ↗
05/24/2019440549113Open ↗
05/24/2019440549097Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/28/2026Q00221632-P1Open ↗
08/28/2026Q00221632-I1Open ↗
08/28/2026Q00221632-P2Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance119
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS37
03/13/2020440543306Open ↗
01/30/2020440542021Open ↗
01/30/2020440543707Open ↗
Showing 3 of 37 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY28
09/24/2021440542030Open ↗
09/23/2021440542030Open ↗
09/02/2021440536975Open ↗
Showing 3 of 28 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS27
09/24/2021440542030Open ↗
09/23/2021440542030Open ↗
09/02/2021440536975Open ↗
Showing 3 of 27 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS22
09/24/2019440567110Open ↗
05/24/2019440549113Open ↗
05/24/2019440549097Open ↗
Showing 3 of 22 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
02/15/2022421044275Open ↗
01/13/2021440549113Open ↗
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00608427-I1Open ↗
▸Inspections & Test Reports28
▸BISTECHNICAL REPORT: RESPONSIBILITY28
02/15/2022421044275Open ↗
09/24/2021440542030Open ↗
09/23/2021440542030Open ↗
Showing 3 of 28 on file for this type
▸Approvals, Objections & Sign-offs36
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST27
02/24/2022421044275Open ↗
09/24/2021440542030Open ↗
09/02/2021440536975Open ↗
Showing 3 of 27 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership83
▸BISCOST AFFIDAVIT59
09/24/2021440542030Open ↗
09/02/2021440536975Open ↗
04/15/2021440567110Open ↗
Showing 3 of 59 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT22
09/24/2019440567110Open ↗
05/24/2019440549113Open ↗
05/24/2019440549097Open ↗
Showing 3 of 22 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
02/15/2022421044275Open ↗
01/13/2021440549113Open ↗
▸Filing & Intake Forms53
▸BISADDITIONAL INFORMATION22
04/08/2021440567110Open ↗
12/30/2019440549113Open ↗
08/13/2019440543306Open ↗
Showing 3 of 22 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET22
09/24/2019440567110Open ↗
05/24/2019440549113Open ↗
05/24/2019440549097Open ↗
Showing 3 of 22 on file for this type
▸BISEFILING COVER SHEET6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISBOROUGH INTAKE FORM3
12/30/2019440534557Open ↗
12/04/2019440549113Open ↗
Showing 2 of 3 on file for this type
▸Other Documents2
▸DOB NOWManufacturer's Specifications1
08/13/2026Q01085664-I1Open ↗
▸DOB NOWCalculations1
08/13/2026Q01085664-I1Open ↗