← Back
One family attached or semi-detached
24 CAROL PLACE
STATEN ISLAND · Mariner's Harbor-Arlington-Graniteville · BIN 5090347
💬 Discuss this project
1988Year Built
2Stories
A5Building Class
R3-2Zoning
1,159 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One family attached or semi-detached · 3,003 sf lot · 0.39 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalGeneralOther
Filed — no permit issued8p · 1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC104/17/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272104/17/2025
Building Lifecycle
All (9)Filed (1)Violation (3)Special Inspection (5)
04/17/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01209028-I1
04/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
04/10/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
04/10/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
04/10/2025
Special inspection requirement — Final
Walid Abdulla
04/10/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
02/19/2009
Violation issued (HPD, closed)
B
02/19/2009
Violation issued (HPD, closed)
C
02/19/2009
Violation issued (HPD, closed)
B
Nothing on file for this building.
1 project · most recent 04/17/2025
FiledStatusContractorScope
04/17/2025Permit IssuedSUNRUN SOLAR ELECTL CORP—
1 project · most recent 04/17/2025
FiledStatusContractorScope
04/17/2025——15 panels, 6.15 kw, 317 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/10/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
04/10/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
04/10/2025Energy Code Compliance InspectionsWalid Abdullaprogress
04/10/2025FinalWalid Abdullaprogress
04/10/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/19/2026S01209028-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/26/2026S01209028-I1Open ↗
08/26/2026S01209028-I1Open ↗
08/26/2026S01209028-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/26/2026S01209028-I1Open ↗
08/26/2026S01209028-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026S01209028-I1Open ↗