← Back
Factory, light manufacturing
24 FRANKLIN STREET
BROOKLYN · BIN 3065246
💬 Discuss this project
1931Year Built
2Stories
F5Building Class
M1-1Zoning
14,080 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Factory, light manufacturing · Owner of record: WHCHRISTIAN & SONS INC · 12,000 sf lot · 1.17 FAR built · Flood zone X500
Locations of Work
Mechanical
Roof2p · 1 filing · 12 docs
Floor 22p · 1 filing · 12 docs
Floor 11p · 1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAZINI ENGINEERING, P.C.201/08/2024
M JUST ARCHITECTURE PC206/26/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JUST ARCHITECTURE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WASOFF PLBG & UTILITY COPlumbing207/08/2026
STARTEC MECHANICAL LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HANSEN ENGINEERING PC8174206/26/2023
Building Lifecycle
All (35)Filed (4)Permit Issued (3)Signed Off (2)Violation (1)Inspection (4)Objection (4)Special Inspection (17)
09/11/2026
Signed off — Alteration
CONNECT TO EXISTING GAS PIPING FOR ONE (1) REPLACEMENT HIGH PRESSURE STEAM GAS BOILER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00963058-I1
11/04/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/09/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/11/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/31/2025
Permit issued — Plumbing
B00963058-S1-PL
02/01/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
01/23/2024
Signed off — Alteration
Mechanical work to install 3 outdoor electric split system condensing units at roof and 10 indoor electric heat pumps at 1st & 2nd floors indicated on drawings filed herewith. No change in use egress or occupancy under this application
B00859403-I1
01/08/2024
Filed — Alteration
CONNECT TO EXISTING GAS PIPING FOR ONE (1) REPLACEMENT HIGH PRESSURE STEAM GAS BOILER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00963058-I1
01/08/2024
Filed — Alteration
CONNECT TO EXISTING GAS PIPING FOR ONE (1) REPLACEMENT HIGH PRESSURE STEAM GAS BOILER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00963058-S1
01/08/2024
Permit issued — Boiler Equipment
B00963058-I1-BE
01/04/2024
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Bazini
06/29/2023
Special inspection requirement — Mechanical Systems
Ryan Hansen
06/29/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
06/29/2023
Special inspection requirement — Energy Code Compliance Inspections
Ryan Hansen
06/29/2023
Special inspection requirement — Final
Ryan Hansen
06/29/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Ryan Hansen
06/29/2023
Special inspection requirement — Maintenance information
Ryan Hansen
06/29/2023
Special inspection requirement — HVAC-R and service water heating system controls
Ryan Hansen
06/29/2023
Special inspection requirement — HVAC-R and service water heating equipment
Ryan Hansen
06/26/2023
Filed — Alteration
Mechanical work to install 3 outdoor electric split system condensing units at roof and 10 indoor electric heat pumps at 1st & 2nd floors indicated on drawings filed herewith. No change in use egress or occupancy under this application
B00859403-P1
06/26/2023
Special inspection requirement — Mechanical Systems
Ryan Hansen
06/26/2023
Special inspection requirement — Energy Code Compliance Inspections
Ryan Hansen
06/26/2023
Special inspection requirement — Final
Ryan Hansen
06/26/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Ryan Hansen
06/26/2023
Special inspection requirement — Maintenance information
Ryan Hansen
06/26/2023
Special inspection requirement — HVAC-R and service water heating system controls
Ryan Hansen
06/26/2023
Special inspection requirement — HVAC-R and service water heating equipment
Ryan Hansen
06/26/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/30/2023
Permit issued — Mechanical Systems
B00859403-I1-MS
04/26/2023
Objection raised — Zoning
04/26/2023
Objection resolved — Addressed
04/26/2023
Objection raised — Scope
04/26/2023
Objection resolved — Addressed
04/21/2023
Filed — Alteration
Mechanical work to install 3 outdoor electric split system condensing units at roof and 10 indoor electric heat pumps at 1st & 2nd floors indicated on drawings filed herewith. No change in use egress or occupancy under this application
B00859403-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offWASOFF PLBG & UTILITY CO03/31/2025
DOB NOWBoiler EquipmentSigned-offWASOFF PLBG & UTILITY CO01/08/2024
DOB NOWMechanical SystemsSigned-offSTARTEC MECHANICAL LLC05/30/2023
BISPLISSUEDWASOFF PLBG & UTILITY CO03/30/2025
BISPLISSUEDWASOFF PLBG & UTILITY CO03/01/2024
BISPLISSUEDIRWIN FRIEDMAN & SON INC04/12/2019
BISMHISSUEDCAPEZZANO CONSTRUCTION01/14/2019
BISOTISSUEDEMPIRE ERECTORS & ELECTRI10/28/2016
BIS—RE-ISSUEDEMPIRE ERECTORS & ELECTRI10/28/2016
BISOTISSUEDEMPIRE ERECTORS & ELECTRI06/07/2016
BIS—ISSUEDEMPIRE ERECTORS & ELECTRI06/07/2016
1 project · most recent 01/08/2024
Gas
FiledStatusContractorScope
01/08/2024Signed-offWASOFF PLBG & UTILITY COGas
1 project · most recent 09/20/2018
General Wiring
FiledStatusContractorScope
09/20/2018CompleteJONG HYUN KIMGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
11/04/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/09/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/11/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/01/2024Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
01/04/2024HVAC-R and service water heating equipmentJoseph Bazinienergy_progress
06/29/2023Mechanical SystemsRyan Hansenspecial
06/29/2023Fire-Resistant Penetrations and JointsRyan Hansenspecial
06/29/2023Energy Code Compliance InspectionsRyan Hansenprogress
06/29/2023FinalRyan Hansenprogress
06/29/2023HVAC-R and service water piping design and insulationRyan Hansenenergy_progress
06/29/2023Maintenance informationRyan Hansenenergy_progress
06/29/2023HVAC-R and service water heating system controlsRyan Hansenenergy_progress
06/29/2023HVAC-R and service water heating equipmentRyan Hansenenergy_progress
06/26/2023Mechanical SystemsRyan Hansenspecial
06/26/2023Energy Code Compliance InspectionsRyan Hansenprogress
06/26/2023FinalRyan Hansenprogress
06/26/2023HVAC-R and service water piping design and insulationRyan Hansenenergy_progress
06/26/2023Maintenance informationRyan Hansenenergy_progress
06/26/2023HVAC-R and service water heating system controlsRyan Hansenenergy_progress
06/26/2023HVAC-R and service water heating equipmentRyan Hansenenergy_progress
06/26/2023Fire-Resistant Penetrations and JointsRyan Hansenspecial
▾Documents — 53 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/27/2026B00859403-P1Request digital key ↗
08/26/2026B00963058-S1Request digital key ↗
08/26/2026B00963058-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits14
▸BISWORK PERMIT APPLICATION7
03/04/2024322060452Open ↗
04/12/2019322060452Open ↗
01/16/2019322060452Open ↗
Showing 3 of 7 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION5
03/11/2024322060452Open ↗
03/05/2024322060452Open ↗
02/26/2024322060452Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
06/26/2016321235034Open ↗
06/26/2016321235025Open ↗
▸Seals & Professional Certifications17
▸DOB NOWProgress Inspector Seal & Signature5
09/02/2026B00859403-P1Open ↗
09/02/2026B00859403-P1Open ↗
08/27/2026B00859403-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
01/16/2019322060452Open ↗
11/23/2018322060452Open ↗
06/08/2016321235034Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/27/2026B00859403-I1Open ↗
08/27/2026B00859403-P1Open ↗
08/26/2026B00963058-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/02/2026B00859403-P1Open ↗
08/27/2026B00859403-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/23/2018322060452Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
11/23/2018322060452Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
11/23/2018322060452Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/27/2026B00859403-P1Open ↗
08/26/2026B00963058-I1Open ↗
08/26/2026B00963058-S1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/23/2018322060452Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
11/23/2018322060452Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
03/04/2024322060452Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
09/17/2015321235025Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
11/23/2018322060452Open ↗
09/17/2015321235025Open ↗
09/17/2015321235034Open ↗
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION3
03/14/2024322060452Open ↗
03/11/2024322060452Open ↗
11/21/2018322060452Open ↗
▸BISEFILING COVER SHEET3
11/23/2018322060452Open ↗
09/17/2015321235025Open ↗
09/17/2015321235034Open ↗